The SEQR process may extend the various procedural time limits
set forth throughout this chapter. For those actions taken under this
chapter that are subject to SEQRA, all time frames and deadlines otherwise
set forth in this chapter may be delayed until a determination of
significance has been made and, if required, a draft EIS has been
filed.
Upon determination that an application is classified as a Type
1 action as designated by this chapter or SEQRA, the designated approval
authority has the authority to transmit such application to the Town
Attorney, Town Engineer and/or a qualified consultant for his/her/their
review and recommendations. Furthermore, the Town Attorney, Town Engineer
and/or a qualified consultant may be required to assist the designated
approval authority in his, her or their obligations as prescribed
by SEQRA. The cost of such assistance and review shall be at the expense
of the applicant.