[Ord. No. 2021-272, 3/2/2021]
1. The current Chapter
26, Part
1, of the Code of Ordinances of the Borough of New Stanton, known as the "New Stanton Stormwater Management Ordinance," is hereby repealed and replaced by this chapter, which shall be placed in Chapter
26, Part
1, of the Code of Ordinances of the Borough of New Stanton; and be titled as the "New Stanton Stormwater Management Ordinance."
2. With the exceptions of those provisions in the prior ordinance, set forth above in Subsection
1, wherein and whereby the Borough previously approved stormwater plans for developments, lands and land developments, which stormwater plans were designed, constructed, installed and completed; and/or are and have not been properly maintained, repaired, replaced and operated in strict compliance with all of the standards, specifications, rules, regulations, ordinances and requirements of the Borough's prior Stormwater Management Ordinance (collectively "provisions"), shall continue to apply to those prior approved stormwater plans.
3. If any of the prior stormwater plans approved under the prior Stormwater
Management Ordinance that have not been timely, fully and completely
designed, constructed, installed and completed; and are and have been
properly maintained, repaired, replaced and operated in strict compliance
with all of the standards, specifications, rules, regulations, ordinances
and requirements of the Borough's prior Stormwater Management
Ordinance (collectively "provisions"), and/or are not being properly
maintained, repaired, replaced and operated in strict compliance with
all of the standards, specifications, rules, regulations, ordinances
and requirements of the Borough's prior Stormwater Management
Ordinance (collectively "provisions"), then the provisions of this
chapter shall apply.
4. The current provisions in Chapter
22, Parts 6 and 7, in the Code of Ordinances of the Borough of New Stanton, dealing with stormwater, that are inconsistent with any of the provisions in this chapter are:
A. Hereby repealed to the extent of the inconsistency;
B. Replaced by this chapter; and
C. Construed in pari materia between the provisions set forth in §
22-615, Subsection 12., in the Codification of the Borough of New Stanton, and construed together with §
26-604, Municipal Stormwater Facility and BMP Operation and Maintenance Fund, in this chapter.
[Ord. No. 2021-272, 3/2/2021]
1. U.S. Department of Agriculture, National Resources Conservation Service
(NRCS). National Engineering Handbook. Part 630: Hydrology, 1969-2001.
Originally published as the National Engineering Handbook, Section
4: Hydrology. Available from the NRCS online at http://www.nrcs.usda.gov/.
2. U.S. Department of Agriculture, Natural Resources Conservation Service.
1986. Technical Release 55: Urban Hydrology for Small Watersheds,
2nd Edition. Washington, D.C.
3. Pennsylvania Department of Environmental Protection. No. 363-0300-002
(December 2006), as amended and updated. Pennsylvania Stormwater Best
Management Practices Manual. Harrisburg, PA.
4. Pennsylvania Department of Environmental Protection. No. 363-2134-008
(March 31, 2012), as amended and updated. Erosion and Sediment Pollution
Control Program Manual. Harrisburg, PA.
5. U.S. Department of Commerce, National Oceanic and Atmospheric Administration,
National Weather Service, Hydrometeorological Design Studies Center.
2004-2006. Precipitation-Frequency Atlas of the United States, Atlas
14, Volume 2, Version 3.0, Silver Spring, Maryland. Internet address:
http://hdsc.nws.noaa.gov/hdsc/pfds/.
6. PennDOT Publication 408 - Construction Specifications, Publication
584 - Drainage Manual current editions.