Pursuant to N.J.S.A. 40:65-14, the purpose of this article is
to set forth standards and requirements for the construction, reconstruction,
replacement, repair, alteration and maintenance of sidewalks and curbs
within the Borough of Rockaway.
Upon completion of sidewalk or curb construction, reconstruction,
replacement, repair or maintenance, all equipment, unused materials
and refuse shall be removed from the site of the work, and all public
and private properties, appurtenances, signs, markings, ramps and
related improvements damaged, disturbed or altered during the course
of construction shall be replaced or repaired in accordance with all
applicable federal, state, local and Borough standards. The site shall
be put as nearly as possible into conditions corresponding to that
which existed prior to construction, all to the satisfaction of the
Borough Engineer or his authorized representative.