Whether the subdivider elects to complete the required improvements
prior to approval of the final plan or to post a performance guarantee
with the Supervisors, an inspection of such improvements shall be
conducted by the Township Engineer and the Roadmaster in accordance
with an approved schedule upon their completion to assure that said
improvements are satisfactory. The cost of all inspections conducted
by the Township shall be borne by the developer.