Application for installation of water mains in subdivisions
or land division as defined in Chapter 24 shall be filed, in writing, with the Board. The application
shall set forth at least the following:
A. Name and address of applicant;
B. Name of subdivision or land division;
C. Legal description of property;
D. Map showing streets, lots and sizes of proposed mains, valves and
hydrants, and street laterals;
E. Date of approval of plat or certified survey by Village and Department
of Commerce; and
F. Date of approval of proposed mains by Wisconsin Department of Natural
Resources.
The installation of the water mains in new subdivisions or land
divisions shall be made by the developer, or a contractor employed
by the developer, all in accordance with the terms and provisions
of the Whitefish Bay Municipal Code, relating to the division and
subdivision of land. Plans and specifications for construction of
the water main extension shall be submitted to the Director of Public
Works for prior approval. The developer shall be responsible for the
total cost of construction including any related review, inspection,
administrative, engineering and legal fees incurred by the Village.
Water mains greater than 12 inches in diameter, installed for
the benefit of the entire water distribution system, shall be considered
transmission mains. The utility shall pay the incremental material
and installation costs for the difference between a twelve-inch diameter
water main and the approved size of the transmission main installed.
Where it is necessary to oversize a facility in order to meet the
needs of a specific use or uses, the cost of the over sizing will
be directly assessed against the specific benefited properties.