[Ord. No. 2021-2324, 3/9/2021]
1. A water connection fee is hereby fixed and imposed upon the owner
of the property where a use is to be connected to the water system
directly or indirectly and/or where a previously connected use is
changed or expanded and/or one or more new uses is/are to be connected.
Such connections may be through a new or existing physical connection,
connected separately or through one or more existing or new service
connections or supply lines owned by any owner other than the Borough.
Water connection fees, for each use, shall be in accordance with the
following:
A. Application for Service. Before any new connection is made to the
water system, any new use is added to an existing connection, any
connected use (other than a dwelling unit) is changed and/or used
so as to increase water usage and/or any connected use is changed
to another use, an application therefor must be filed, with the Borough,
by the property owner. Each applicant shall certify, to the Borough,
the proposed use or uses, with respect to each use other than a dwelling
unit, and the reasonably anticipated water usage in peak gallons per
day for each use to be connected. All applications shall provide such
relevant information as the Borough may require. No such connection,
change or additional usage shall be made and/or begun until and unless
the Borough approves the application therefor and issues a connection
permit therefor and the water connection fee is paid in full.
B. The owner of any building, structure or property which contains more
than one use shall pay a separate water connection fee for each use.
C. The water connection fee for each dwelling unit shall be in accordance
with the Borough of Phoenixville Master Schedule of Fees.
D. The water connection fee for each use other than a dwelling unit
shall be based initially upon the applicant's estimate of the
projected gpd of peak daily water use from the proposed use; however,
in no case shall the water connection fee be less than that for one
EDU.
E. If any building connected to the water system shall be converted,
enlarged or remodeled or (an) additional building(s) is/are to be
constructed on a property and connected directly or indirectly to
the water system through an existing service or private supply line,
so as to create or establish (an) additional or expanded use(s), an
additional water connection fee for each such additional or expanded
use shall be paid prior to the issuance of a connection permit therefor
and prior to the issuance of any building permit for any improvements
for the use and if no building permit is required, prior to any occupancy
permit for the use.
F. If a connected use is changed, expanded and/or added to, so that
additional water use will result, an additional water connection fee
is imposed.
G. Borough Determination of Usage. The Borough shall have the right,
at any time, to determine the actual water usage of any use connected
to the water system to verify that the actual water usage conforms
to the applicant's certification.
H. For uses other than a dwelling unit(s), the borough, from time to
time, following the connection of the use and/or the addition and/or
change of a nonresidential use already connected, may assess and impose
an additional water connection fee based upon actual additional peak
daily water usage (over the usage for which the use's paid water
connection fee(s) was/were based).
I. The water connection fee(s) imposed hereunder shall be in addition
to:
(1)
Any connection fee and/or inspection charge imposed by the Borough;
and
(2)
Any rental and/or other service rates and charges fixed, charged
or imposed by the Borough by reason of the use, or availability for
use, of the water system by uses of the property.
J. Decreased Usage. No refund, rebate or credit of water connection
fees shall be made in the event of a decrease in water usage.
K. Nontransferable Fees. No water connection fee paid, under this Part,
for a use on any property, shall be transferable to any other property.
L. Time for Payment. Water connection fees shall be due and payable
upon the Borough's issuance of a connection permit for the proposed
use and/or change or addition to a use.
[Ord. No. 2021-2324, 3/9/2021]
1. If a use is connected and/or begun before paying the required water
connection fees, the fee shall be subject to a 10% penalty and the
fee plus the penalty shall bear interest from the due date at the
rate of 1% per month or fraction thereof until paid. These penalties
shall be concurrent with all other remedies, legal and equitable,
available to the Borough for collection of the fees including, but
not limited to, municipal lien and assumpsit remedies. The Borough
shall also have the right to disconnect the service for failure to
pay the water connection fee.
2. All water connection fees, together with all penalties thereon, not
paid on or before the end of six months from the date due shall be
deemed to be delinquent. All water connection fees and all penalties
and interest thereon shall be a municipal claim and lien against such
property where the connected use(s) is/are located and may be collected
in the manner provided by law for the filing and collection of such
claims and liens.