Improvement Cost
|
Inspection Fee Required
|
---|---|
$0 to $10,000
|
8% of the estimated cost of construction as estimated by the
Borough Engineer, or a minimum of $300
|
$10,000 to $50,000
|
$800, plus 71/2% of the estimated cost over $10,000
|
$50,000 to $100,000
|
$3,800 plus 7% of the estimated cost over $50,000
|
$100,000 or more
|
$13,800, plus 6% of the estimated cost over $100,000
|