The construction of a new mobile/manufactured home park, as permitted by Chapter 129, Zoning, of the Code of the Township of Sadsbury, or the alteration of an existing park shall be made only after the application and plans have been submitted in accordance with this chapter. The application and plans shall be prepared and processed in accordance with Article III and the applicable standards incorporated in Article IV of this chapter and shall include the following:
A.
Complete park layout showing lot sizes and dimensions, open space areas, and all improvements including streets, vehicular parking areas, water supply location, sewer and water lines, service buildings, sewage system, lighting facilities, walkways, refuse storage areas and disposal methods and recreation facilities;
B.
Plans for providing adequate management of surface drainage;
C.
A letter of adequacy and available capacity from the appropriate agency regarding the ability to provide public sewer service. No individual or community sewer systems shall be permitted;
D.
Details of the construction of the sewerage system, including size, slope, material, manhole and cleanout construction and location;
E.
Details of a public water supply system, including expected capacity, pressure, delivery rate and volume, and distribution system, including size, materials and valve locations;
F.
Construction of service buildings showing plumbing, heating, ventilation and other sanitary systems which are to be included;
G.
Lighting facilities and electrical power line installation;
H.
Anticipated number of parking spaces as would be permitted under available land area;
I.
A copy of approved plans that will be kept on file by the reviewing health agency; and
J.
Phasing schedule and plans.