All gas, oil, water, electric, telephone and public utility mains, feeders and conduits laid in the streets and alleys shall be laid with the top of the pipe at least two (2) feet below the surface of the ground, and all gas service pipes from such mains to the property lines shall be laid with the top of such pipe at least sixteen (16) inches below the surface of the ground, and all of such pipes shall be so laid as not to interfere in any manner with water pipes or mains, sanitary sewers or storm sewers of the city, or pipes, cables or conduits of other utilities already installed. At street intersections, street and alley intersections or any other place where it is likely that the street grade will be lowered, the mains, service pipes, etc., shall be laid at a greater depth than two (2) feet, as directed by the city engineer.
(Ordinance 378, sec. 1, adopted 6/17/1927; Ordinance 381 adopted 7/8/1927; 1959 Code, sec. 28-64; 1983 Code, sec. 24-116)