(a) 
Residential:
(1) 
Primary use-new/additions: $0.15 per square foot.
(2) 
Secondary use-new/additions: $0.10 per square foot.
(3) 
Alterations: $50.00.
(b) 
Commercial:
(1) 
Primary use-new/additions: $0.15 per square foot.
(2) 
Secondary use-new/additions: $0.10 per square foot.
(c) 
Commercial alterations (siding, roofing, enclosures):
(1) 
$0.00 to $3,000.00: $50.00 minimum.
(2) 
$3,001.00 to $15,000.00: $5.00 per thousand.
(3) 
$15,001.00 to $100,000.00: $3.50 per thousand.
(4) 
Over $100,000.00: $2.00 per thousand.
(d) 
Re-inspection fee:
$50.00 per inspection.
(e) 
Minimum permit fee:
$50.00 per permit.
(Ordinance 1298 adopted 9/28/20; Ordinance 1349 adopted 4/11/2022; Ordinance 1419 adopted 7/22/2025)
Permit and inspection fees required under article 3.02, division 5, are as specified below:
(1) 
General:
All inspections, minimum fee
$50.00
Re-inspection fee
$50.00
General inspection fee
$50.00
(2) 
New construction:
First 3,000 square feet, per 100 square feet
$4.40
Over 3,000 square feet, per 100 square feet
$2.20
(3) 
Additions:
Lighting, each
$0.55
Plugs, each
$0.55
Switches, each
$0.55
Range
$2.75
Cook top
$2.75
Oven
$2.75
Disposal
$1.10
Dryer
$2.75
Dishwasher
$1.10
Vent-a-hood
$1.10
Room/ceiling heater
$1.35
Water heater
$2.75
Exhaust fans
$1.10
Meter/loop/temp.
$40.00
Meter/loop/perm
$40.00
Panels/1–10 circuits
$3.85
Panels/10+ circuits
$5.50
0 to 5 kw
$5.50
5 to 10 kw
$7.70
Above 10 kw
$10.00
Solar generation systems
$80.00
Wind generation systems
$80.00
(Ordinance 1299 adopted 9/28/20; Ordinance 1350 adopted 4/11/2022; Ordinance 1430 adopted 9/9/2024)
Permit and inspection fees required under article 3.02, division 6, are specified below:
Permit fee
$50.00
Re-inspection fee
$50.00
Supplement
$5.50
Suspended/wall heater
$12.00
Furnace/burner force air or gravity <100 M
$12.00
Furnace/burner force air or gravity >100 M
$14.00
Non-portable evaporative cooler
$9.00
Air handling unit <10,000 CFM
$8.00
Air handling unit > 10,000 CFM
$14.00
Ventilation system
$8.00
Ventilation fan
$6.00
Domestic incinerator
$14.00
Industrial/commercial incinerator
$55.00
Repair/addition/alter heating or cooling appliance
$12.00
Install/relocate appliance vent
$5.50
Mechanical exhaust hood/ducts
$8.00
Other appliances
$8.00
Gas piping system 1–4 outlets
$4.00
Each additional outlet
$1.10
Boiler or compressor up to 3 HP
$12.00
Boiler or compressor 3.5–15 HP
$21.00
Boiler or compressor 16–30 HP
$30.00
Boiler or compressor 31–50 HP
$45.00
Boiler or compressor over 50 HP
$75.00
(Ordinance 1300 adopted 9/28/20; Ordinance 1351 adopted 4/11/2022; Ordinance 1431 adopted 9/9/2024)
Permit and inspection fees required under article 3.02, division 7, are specified below:
Permit fee
$50.00
Re-inspection fee
$50.00
General inspection
$4.00
Water heater
$4.00
Gas line inspection
$4.00
Gas line new/replaced
$13.00
Gas line repaired (replacement of <20')
$4.00
Water line new/replaced
$13.00
Water line repaired (replacement of <20")
$4.00
Sewer line new/replaced
$13.00
Sewer line repaired (replacement of <20')
$4.00
Water treatment equipment
$4.00
New/replacement gas outlets 1–4
$4.00
Each additional outlet
$1.10
Plumbing fixture or trap or set
$1.65
Lawn sprinkler system 1–5 heads
$4.00
Each additional head
$0.50
Water conditioner
$4.00
Backflow preventer test
$2.00
Install backflow device
$4.00
(Ordinance 1301 adopted 9/28/20; Ordinance 1352 adopted 4/11/2022; Ordinance 1432 adopted 9/9/2024)
Fees for permit for trailer or mobile home park:
(1) 
Initial fee: $50.00 per designated space, up to a maximum of $1,000.00 per park.
(2) 
Annual fee after payment of initial fee: $25.00 per designated space, up to maximum of $500.00 per park.
(3) 
Transfer of permit: $50.00 per designated space, up to a maximum of $1,000.00 per park.
(Ordinance 1207, sec. 5, adopted 4/11/16; Ordinance 1368 adopted 9/16/2022
(a) 
Permit fees required under section 3.07.005 are specified below:
(1) 
Permit fee, first 500 linear feet: $60.00.
(2) 
Over 500 linear feet, per 300 linear feet: $5.00.
(3) 
Reissuance fee: $30.00.
(4) 
Utility repair inspection fee: $15.00.
(b) 
The city reserves the right to waive the fee for utility construction permits for public works and/or public utility projects funded by local, state or federal tax dollars.
(Ordinance 1169, sec. 2, adopted 10/14/13; Ordinance 1304 adopted 9/28/20)