Dumpster Collection Rates
| ||||||
---|---|---|---|---|---|---|
Size/Pick up
|
1x Week
|
2x Week
|
3x Week
|
4x Week
|
5x Week
|
6x Week
|
Cart
|
$30.08
|
$60.15
|
$90.23
|
$120.31
|
$150.38
|
$-
|
2 cu yd
|
$107.07
|
$174.45
|
$270.69
|
$360.92
|
$469.19
|
$563.03
|
3 cu yd
|
$131.14
|
$210.54
|
$282.72
|
$421.07
|
$553.41
|
$664.12
|
4 cu yd
|
$154.45
|
$240.61
|
$343.03
|
$481.22
|
$630.79
|
$757.60
|
6 cu yd
|
$198.34
|
$360.92
|
$541.38
|
$721.84
|
$902.30
|
$1,084.38
|
8 cu yd
|
$234.11
|
$458.46
|
$650.30
|
$842.14
|
$1,053.49
|
$1,263.21
|
*
|
Does not include sales tax or city fee.
|
Vertical Compactor Collection Rates
| ||||||
---|---|---|---|---|---|---|
Size/Pick up
|
1x Week
|
2x Week
|
3x Week
|
4x Week
|
5x Week
|
6x Week
|
2 cu yd
|
$211.35
|
$422.70
|
$632.42
|
$842.14
|
$1,053.49
|
$1,264.84
|
4 cu yd
|
$391.81
|
$781.99
|
$1,173.80
|
$1,563.98
|
$1,955.79
|
$2,345.97
|
6 cu yd
|
$601.53
|
$1,203.06
|
$1,804.59
|
$2,406.12
|
$3,007.65
|
$3,620.21
|
8 cu yd
|
$824.26
|
$1,648.52
|
$2,472.78
|
$3,248.26
|
$4,090.41
|
$4,909.79
|
*
|
Does not include sales tax or city fee
|
Size/Pickup
|
Rental Fee per Month
|
Delivery Fee
|
Collection Fee (per pull)
|
Disposal Fee** (per ton)
|
---|---|---|---|---|
20 cu yd
|
$171.74
|
$114.49
|
$343.47
|
$48.09
|
30 cu yd
|
$214.00
|
$114.49
|
$400.72
|
$48.09
|
40 cu yd
|
$240.75
|
$114.49
|
$457.96
|
$48.09
|
*
|
Does not include sales tax or city fee
|
**
|
Disposal Fee based upon current landfill disposal costs and
material recovery facility charges for recycling. Subject to change.
|
Water Meter Size/Type
|
Fee
|
---|---|
3/4"
|
$315.00
|
1"
|
$410.00
|
1-1/2"
|
$650.00
|
2"
|
$850.00
|
3"
|
$2,000.00
|
4"
|
$3,050.00
|
6"
|
$5,100.00
|
Over 6"
|
Will be at list pricing provided by city-approved vendor.
|
Water Meter Size/Type
|
Fee
|
---|---|
3/4"–1"
|
$750.00 per tap
|
1-1/2"
|
$950.00 per tap
|
2"
|
$1,000.00 per tap
|
2" compound
|
$1,500.00 per tap
|
3"
|
$2,250.00 per tap
|
4" and over
|
$3,500.00 per tap
|
Sewer Meter Size/Type
|
Fee
|
---|---|
4"
|
$750.00 per tap
|
6"
|
$1,000.00 per tap
|
8"
|
$1,250.00 per tap
|
Meter Size or Type
|
Fee
|
---|---|
3/4" meter
|
$150.00
|
1" meter
|
$200.00
|
1-1/2" meter
|
$350.00
|
2" meter
|
$500.00
|
3" meter
|
$750.00
|
Fire hydrant meter
|
$1,500.00
|
Reason for Disconnection
|
Reconnection Fee
|
Additional Charges
|
---|---|---|
Nonpayment of bill
|
$50.00
|
All outstanding charges owed to city, and an additional $50.00
fee if reconnection is outside city business hours*
|
Meter removed or locked for unauthorized reconnection by customer
or for security reasons
|
$100.00
|
All outstanding charges owed to city, all costs to repair any
damage to the meter, cut-off, lock or associated equipment, and an
additional $50.00 if reconnection is outside city business hours*
|
*No reconnections outside the city’s normal business hours
will occur unless the customer pays all fees due, including but not
limited to the after-hours reconnection fee, with a check or money
order made payable to the city delivered to the city or given to the
city public works employee that is sent to make the reconnection.
|
Water Service Rates
| ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Residential
|
Commercial
|
Multifamily
|
Industrial
|
Duplex
|
SGWS
|
South Grayson
| ||||
Inside City
|
Outside City
|
Inside City
|
Outside City
|
Inside City
|
Inside City
|
Inside City
|
Inside City
|
Inside City
|
Outside City
| |
Meter Size
|
Minimum Service Charge
| |||||||||
3/4"
|
$35.10
|
$43.88
|
$35.10
|
$43.88
|
$35.10
|
$35.10
|
$35.10
|
-
|
$35.10
|
$43.88
|
1"
|
$78.17
|
$97.71
|
$78.17
|
$97.71
|
$35.10
|
$78.17
|
$35.10
|
-
|
$35.10
|
$43.88
|
1-1/2"
|
$149.96
|
$187.45
|
$149.96
|
$187.45
|
$35.10
|
$149.96
|
$35.10
|
-
|
$35.10
|
$43.88
|
2"
|
$236.11
|
$295.14
|
$236.11
|
$295.14
|
$35.10
|
$236.11
|
$35.10
|
-
|
$35.10
|
$43.88
|
3"
|
$437.12
|
$546.40
|
$437.12
|
$546.40
|
$35.10
|
$437.12
|
$35.10
|
-
|
$35.10
|
$43.88
|
4"
|
$724.27
|
$905.34
|
$724.27
|
$905.34
|
$35.10
|
$724.27
|
$35.10
|
-
|
$35.10
|
$43.88
|
6"
|
$1,442.18
|
$1,802.73
|
$1,442.18
|
$1,802.73
|
$35.10
|
$1,442.18
|
$35.10
|
-
|
$35.10
|
$43.88
|
8"
|
$2,877.97
|
$3,597.46
|
$2,877.97
|
$3,597.46
|
$35.10
|
$2,877.97
|
$35.10
|
-
|
$35.10
|
$43.88
|
10"
|
$7,185.38
|
$8,981.73
|
$7,185.38
|
$8,981.73
|
$35.10
|
$7,185.38
|
$35.10
|
-
|
$35.10
|
$43.88
|
Volumetric Charge (per 1,000 gal)
| ||||||||||
0–2,000 gallons
|
$-
|
$-
|
$-
|
$-
|
$-
|
$-
|
$-
|
$2.68
|
$-
|
$-
|
2,001–10,000 gallons
|
$8.38
|
$10.48
|
$8.38
|
$10.48
|
$8.38
|
$8.38
|
$8.38
|
$2.68
|
$8.38
|
$10.48
|
10,001–15,000 gallons
|
$10.48
|
$13.10
|
$10.48
|
$13.10
|
$10.48
|
$10.48
|
$10.48
|
$2.68
|
$10.48
|
$13.10
|
15,001–20,000 gallons
|
$12.57
|
$15.71
|
$12.57
|
$15.71
|
$12.57
|
$12.57
|
$12.57
|
$2.68
|
$12.57
|
$15.71
|
20,001+ gallons
|
$16.74
|
$20.93
|
$16.74
|
$20.93
|
$16.74
|
$16.74
|
$16.74
|
$2.68
|
$16.74
|
$20.93
|
Wastewater
| |||||||
---|---|---|---|---|---|---|---|
Residential
|
Commercial
|
Multifamily
|
Duplex
|
Industrial
| |||
Inside City
|
Outside City
|
Inside City
|
Outside City
|
Inside City
|
Inside City
|
Inside City
| |
Meter Size
|
Minimum Charge
| ||||||
3/4"
|
$44.00
|
$66.00
|
$44.00
|
$66.00
|
$44.00
|
$88.00
|
$44.00
|
1"
|
$44.00
|
$66.00
|
$98.00
|
$147.00
|
$44.00
|
$88.00
|
$98.00
|
1-1/2"
|
$44.00
|
$66.00
|
$187.99
|
$281.99
|
$44.00
|
$88.00
|
$187.99
|
2"
|
$44.00
|
$66.00
|
$295.97
|
$443.96
|
$44.00
|
$88.00
|
$295.97
|
3"
|
$44.00
|
$66.00
|
$547.97
|
$821.96
|
$44.00
|
$88.00
|
$547.97
|
4"
|
$44.00
|
$66.00
|
$907.92
|
$1,361.88
|
$44.00
|
$88.00
|
$907.92
|
6"
|
$44.00
|
$66.00
|
$1,807.86
|
$2,711.79
|
$44.00
|
$88.00
|
$1,807.86
|
8"
|
$44.00
|
$66.00
|
$3,607.71
|
$5,411.57
|
$44.00
|
$88.00
|
$3,607.71
|
10"
|
$44.00
|
$66.00
|
$9,007.33
|
$13,511.00
|
$44.00
|
$88.00
|
$9,007.33
|
Volumetric Charge (per 1,000 gal)
| |||||||
0–2,000 gallons
|
$-
|
$-
|
$-
|
$-
|
$-
|
$-
| |
2,001–14,000 max
|
$8.70
|
$13.05
|
-
|
-
|
-
|
-
| |
2,001+ gallons
|
-
|
-
|
$8.70
|
$8.70
|
-
|
$8.70
| |
0–4,000 gallons
|
-
|
-
|
-
|
-
|
-
|
-
| |
4,001–28,000 max
|
-
|
-
|
-
|
-
|
$8.70
|
-
|
Schedule A. Water/Wastewater Land Use Equivalency Table
| ||||||
---|---|---|---|---|---|---|
Land Use
|
Meter Type
|
Meter Size
|
LUE
|
Water
|
Sanitary Sewer
|
Total
|
Single-family residential
|
Simple
|
3/4"
|
1
|
$5,500
|
$5,500
|
$11,000
|
Single-family residential
|
Simple
|
1"
|
1.7
|
$9,350
|
$9,350
|
$18,700
|
Single-family residential
|
Simple
|
1-1/2"
|
3.3
|
$18,150
|
$18,150
|
$36,300
|
Single-family residential
|
Simple
|
2"
|
5.3
|
$29,150
|
$29,150
|
$58,300
|
Commercial/retail
|
Compound
|
2"
|
5.3
|
$29,150
|
$29,150
|
$58,300
|
Commercial/retail/multifamily
|
Compound
|
3"
|
10.7
|
$58,850
|
$58,850
|
$117,700
|
Commercial/retail/multifamily
|
Compound
|
4"
|
16.7
|
$91,850
|
$91,850
|
$183,700
|
Industrial
|
Compound
|
6"
|
33.3
|
$183,150
|
$183,150
|
$366,300
|
Industrial
|
Compound
|
8"
|
53.3
|
$293,150
|
$293,150
|
$586,300
|
Industrial
|
Compound
|
10"
|
153.3
|
$843,150
|
$843,150
|
$1,686,300
|
Industrial
|
Turbine
|
12"
|
220
|
$1,210,000
|
$1,210,000
|
$2,420,000
|
Schedule B. Water/Wastewater Impact Fee Rates
| |||
---|---|---|---|
Facility Category
|
Service Area
|
Maximum Impact Fee Per Living Unit Equivalent
|
Adopted Impact Fee Per Living Unit Equivalent
|
Water facilities
|
All
|
$5,500.00
|
$5,500.00
|
Wastewater facilities
|
All
|
$5,500.00
|
$5,500.00
|
Schedule A. Land Use Maximum Fee per Service Unit
| |
---|---|
Land Use Category
|
% of Maximum Fee Per Service Unit
|
Residential
|
100
|
Multifamily
|
100
|
Convenience store
|
100
|
Fueling station
|
100
|
Automotive dealership
|
100
|
Auto repair/maintenance
|
100
|
Warehouse
|
100
|
Storage
|
100
|
Restaurant with drive thru
|
100
|
General commerical
|
85
|
Retail
|
85
|
Industrial manufacturing
|
85
|
Medical office
|
75
|
Hospital
|
75
|
Sit-down restaurant
|
75
|
Retailer >20,000 SF GFA
|
75
|
Employment center
|
65
|
3+ story professional office
|
65
|
Corporate campus
|
65
|