(Ordinance 2023-123 adopted 11/14/2023)
Service Fees and Garbage Fees
Garbage Collection (Residential/Senior Citizen) + 8.25% Sales Tax
Effective
11/18/2022
11/18/2023
Trash
$16.30/$15.40
$17.74/$16.76
Recycling
$3.65/$3.65
$3.97/$3.97
Extra cart
$9.75
$10.75
Garbage Collection (Mustang SUD Customers) + 8.25% sales tax
Effective
11/18/2022
11/18/2023
Trash
$16.30
$17.74
Recycling
$3.65
$3.97
Extra Cart
$9.75
$10.75
Commercial Frontload Rate Schedule
Lifts
1
2
3
4
5
6
Extra Lift
2 Cubic Yd
$98.93
$202.55
$273.02
$279.44
$296.91
$302.84
$70.22
3 Cubic Yd
$138.06
$306.51
$381.03
$409.14
$434.71
$443.40
$81.91
4 Cubic Yd
$182.95
$368.18
$504.97
$514.94
$547.12
$558.07
$93.59
6 Cubic Yd
$205.67
$410.53
$567.66
$578.50
$707.05
$806.03
$128.69
8 Cubic Yd
$251.38
$452.45
$694.30
$925.68
$1,256.73
$1,389.21
$140.37
Container with gates
$7.01
Containers with casters
$14.02
Containers with locks
$13.67
Commercial cart 1x week
$36.27
Commercial cart 2x week
$46.07
Commercial recycle cart
$3.76
Additional cart
$27.75
Roll off rate schedule (20, 30, 40 Cubic Yard) Per Ton
Haul
$558.81
Delivery
$147.07
Daily rent
$5.89
Monthly rent
$176.71
Disposal per ton
$50.99
Disposal load
$300.00
Relocation
$99.35
Downtown Compactors (City Owned)
Monthly
(1 pickup/week)
Monthly (2 pickup/week)
Tier 1 - service company
$50
$80
Tier 2 - service company
$150
$250
Tier 3 - food service company
0—125 max occupancy (inside/outside)
$500
$600
126—225 Max occupancy (inside/outside)
$600
$700
226—300 Max occupancy (inside/outside)
$700
$800
Replacement of key
$100
Illegal dumping fee (no 1-time use allowed)
$1,000
Water and sewer service charges
Disconnect/reconnect fee
$50
($75 if beyond the city's normal business hours)
Transfer fee
$25
Trip fee
$15 ($75 if beyond the city's normal business hours)
Re-read
$20
Profile history
$25 plus $0.10 per page
Temporary disconnect/reconnect
$25
Meter test
$150
Tamper fee
$1,000
Returned check fee
$25
Meter Fees
3/4"
$415 (existing meters only)
1"
$480 (minimum meter size)
1 1/2"
$1730
2"
$1,970
Meter change out (customer request)
Current cost of the meter plus labor and materials
Fire Hydrant Meter Fees
Meter deposit
$2,700
Monthly administrative fee
$50
Relocation fee
$100 (original)
$150 (2nd time)
$200 (3rd + time)
Tamper fee
$1,000
Damaged collar lock
$95
Damage (due to improper freeze protection or abuse)
$1,400
Damaged RPZ (due to improper freeze protection or abuse)
$806
Contractors are responsible for providing proper freeze protection to Fire Hydrant Meter and RPZ assembly
Reinspection Fees
First
$125
Second
$175
Third
$225
Water/Wastewater Connection Fees
Water
1"Access
$2,175
1-1/2" Access
$2,475
2" Access
$2,475
Boring fee
$1,200
• All taps and meters greater than two inches will need to be installed by the contractor, shall require a meter vault, and shall meet the most current engineering design standards. The city will only install meters up to 2" in size; larger meters must be picked up and installed by the builder.
• Standard fees reference herein do not include extraordinary costs incurred by the city, including but not limited to the cost of labor and materials related to boring and repairs to streets and easements. The city will provide an itemized list detailing the actual costs of such labor and materials.
Sewer
4" Tap
$1,500
Boring fee
$1,000
• All taps greater than four inches will need to be installed by the contractor.
• Standard fees referenced herein do not include extraordinary costs incurred by the city, including but not limited to the cost of labor and materials related to boring, manholes, and repairs to streets and easements. The city will provide an itemized list detailing the actual costs of such labor and materials.
Pro-rata charges. The rate of recovery will be calculated at the time of installation, however, will not exceed the actual amount of the line installed. The time period for recovery is five years past the date of the end of the maintenance bond.
Impact fees. Impact fees for water and sewer service units shall be charged in accordance with the current impact fee ordinance.
Repair fees. Repair to a city-owned infrastructure, including meters/components, will be charged to the party responsible for the damage or disruption of service. The fees associated with the repair charge will be actual cost of materials, equipment, labor, and repair to streets and easements.
Review fees for permits - individual wastewater discharge permit. A review fee and administration fee will be due at time of application in the amount of seven thousand five hundred dollars ($7,500). No permit will be issued until this fee is paid by the applicant.