(a) 
Escrow authorization:
For any building and development-related fee, the city may require escrow of funds to cover any third-party review expenses beyond normal and customary. Such escrow shall be based on estimated costs provided by the applicable third-party professional service provider. 5% fee assessed on top of third-party costs.
(b) 
Designated third-party review fees:
Applicable permit fees + $25,000.00 escrow deposit; 5% fee assessed on top of third-party review costs.
(c) 
Administrative exception or appeal:
$1,000.00 per exception.
(d) 
Annexation petition:
$1,000.00 + publication fee.
(e) 
Certificate of occupancy (temporary or permanent):
$250.00.
(f) 
Comprehensive plan amendment.
Less than 5 acres
$2,500.00
5+ to 25 acres
$3,000.00
25+ to 50 acres
$4,000.00
50+ or more acres
$5,000.00 + $15.00 per acre
*$2,500.00 for policy change not affecting land.
(g) 
Contractor registration:
$100.00.
(h) 
Cross-connection permit/backflow prevention assembly testing permits.
(1) 
Customer: $100.00 per device.
(2) 
Test by city: $400.00.
(3) 
Re-test by city: $500.00.
(i) 
Demolition permit:
$500.00.
(j) 
Development agreement.
$7,500.00 + $200.00 per acre + publication fee + personal notification fee + escrow for consultant/legal review.
(k) 
Establishment/vacation of easement/agreement:
$750.00 + recording fee.
(l) 
Building single trade permits (mechanical, electrical, plumbing, flatwork, roof etc.).
(1) 
Residential: $150.00.
(2) 
Commercial: $200.00.
(m) 
Electrical pole (temporary):
$100.00.
(n) 
Grease traps.
(1) 
Application fee: $150.00.
(2) 
Inspection fee: $200.00.
(o) 
Building plan reviews (includes 3 plan reviews; additional reviews require new review fee):
(1) 
Residential new construction review: $500.00 +$0.25 per square foot.
(2) 
Residential remodel/accessory review: $200.00.
(3) 
Commercial: $500.00 + $0.35 per square foot.
(p) 
Building inspections.
(1) 
Residential: $125.00 (reinspection is 1.5 times the original inspection: $225.00).
(2) 
Commercial:
(A) 
Building under 1,500 square feet: $200.00.
(B) 
Building 1,500+ square feet: $200.00 + $0.02 per square foot of building.
(C) 
Reinspection fee: $300.00 (1.5 x base inspection fee).
(q) 
Legal lot determination:
$250.00.
(r) 
Moving structure permit:
$500.00 + escrow of costs associated with road closures, traffic-control and other municipal expenses incurred.
(s) 
Off-site infrastructure:
$800.00/page of plan set.
(t) 
Parking fee in lieu:
$4,000.00 per parking space.
(u) 
Plats.
(1) 
Preliminary plat/plan (new or revised): $5,000.00 + greater of $75.00/lot or $75.00/acre.*
(2) 
Amending or administrative replat: $1,000.00 + greater of $50.00/lot or $50.00/acre.*
(3) 
Final plat: $2,000.00 + greater of $50.00/lot or $50.00/acre.*
(4) 
Replat - requires P&Z and/or city council approval: $2,000.00 + greater of $50.00/lot or $50.00/acre + publication fee + personal notice fee.*
(5) 
Vacation: $1,000.00 + greater of $50.00/lot or $50.00/acre.*
* Includes completeness check and 3 review fees – new fees will be required on 4th submittal.
(v) 
Pool permits (review).
(1) 
Residential: $500.00.
(2) 
Commercial: $1,500.00.
(w) 
Publication fees/sign postings for public hearings:
$500.00.
(x) 
Personal notice fee for public hearings:
$7.50 per letter.
(y) 
PD district or amendment:
$3,500.00 + $300.00 per acre + publication fee + personal notice fee for public hearings + escrow.
(z) 
Red tag/stop work.
(1) 
Cease and desist order: $750.00 per trade.
(2) 
Reinspection: 1.5 times the original inspection fee $300.00.
(aa) 
Right-of-way or easement abandonment application:
$750.00 + escrow for consultant review.
(bb) 
Sidewalk fee in-lieu:
$15.00 per sq. ft.
(cc) 
Short-term rental (STR).
New application and yearly permit - $150.00.
(dd) 
Signs.
(1) 
$200.00 + $2.00 per sq. ft. per sign area.
(A) 
Electrical trade inspection for lighted signs: $200.00.
(B) 
Pre-pour hole inspection for pole/pylon signs: $200.00.
(2) 
Electronic reader board; message for up to 30 days (nonprofit only): $30.00.
(ee) 
Site/construction infrastructure inspection.
Inspection Type
Unit
Fee
Erosion control (excluding revegetation)
Per inspection*
$200.00
Pre-walk inspection
Per inspection*
$500.00
Liftstation
Per inspection/station*
$1,000.00
Wastewater improvements
Linear foot*
$2.00
Water improvements
Linear foot*
$1.10
Storm improvements
Linear foot*
$2.00
Detention pond and WQ facilities
Per pond*
$2,400.00
Detention pond and WQ facilities street improvements
Cubic feet over 100,000
$0.015
Square yards pavement base*
$0.10
Driveways
Each*
$150.00
Revegetation
Per inspection*
$200.00
Final walk
First inspection
$2,100.00
Final walk reinspection
Per inspection*
$1,050.00
*Reinspections incur new fees.
(ff) 
Site plan/development review (includes completion review and 3 plan reviews.
A 4th plan review requires payment of a new review fee.):
(1) 
Site less than 1 acre: $1,500.00 + $0.05/s.f. of impervious cover.
(2) 
Sites over 1 acre: $2,500.00 + $0.05/s.f. of impervious cover + $250.00 per page.
(gg) 
Site plan/development review, public infrastructure, and construction plans correction or revision:
$750.00 + $100.00/revised page.
(hh) 
Utility infrastructure/construction plans (includes completion review and 2 plan reviews.
$800.00/page of plan set.
(ii) 
Specific use permit (SUP):
(1) 
$1,500.00 + $50.00 per acre + publication fee + personal notice fee for public hearings.
(2) 
Minor amendment administrative: $500.00.
(3) 
Major amendment requiring hearings: $750.00 + $50.00 per acre + publication fee + personal notice fee for public hearings.
(jj) 
Irrigation permits.
(1) 
Residential: $150.00.
(2) 
Commercial: $200.00.
(3) 
VEPO/CSI/backflow report review: $75.00.
(kk) 
Start work without permit or without board or commission approval:
$750.00 per trade and permit.
(ll) 
Street closure (related to construction):
(1) 
Short-term (24 hours or less) neighborhood/nonprofit: $150.00.
(2) 
Short-term (24 hours or less) commercial and construction: $300.00.
(3) 
Long-term (more than 24 hours): $300.00 plus $200.00 per week or portion thereof/per lane/per block.
(mm) 
Online permit fee (MyPermitNow Fee):
$20.00.
(nn) 
Technology/GIS fee (applied to annexation/zoning/plats/SUP/site plan):
$250.00.
(oo) 
Traffic impact analysis.
(1) 
TIA application/worksheet review: $500.00.
(2) 
Less than 2,000 trips per day: $3,000.00.
(3) 
2,000–5,000 trips per day: $5,000.00.
(4) 
5,001–10,000 trips per day: $7,500.00.
(5) 
10,001–15,000 trips per day: $10,000.00.
(6) 
15,001+ trips per day: $15,000.00.
(7) 
Traffic impact analysis (TIA) revision: 1/2 current TIA fee.
(pp) 
Tree removal permit (including review, outside of a site development permit).
(1) 
Commercial: $200.00 + mitigation.
(2) 
Residential: $150.00 + mitigation.
(qq) 
Tree mitigation fees (price per caliper inch mitigation required).
(1) 
Protected tree (8" to 20"): $200.00.
(2) 
Signature tree (20" to 30"): $350.00.
(3) 
Heritage tree (30"+): $500.00.
(rr) 
Parkland dedication/improvement fee in lieu:
(1) 
Land dedication fee in lieu: per residential unit: $800.00.
(2) 
Parkland improvement fee in lieu: per residential unit: $1,000.00.
(ss) 
Variance/special exception/alternative compliance:
(1) 
Outside of site/plat case: $1,500.00 base fee plus $300.00 per additional request + publication + personal notice for public hearings as applicable.
(2) 
As a part of site/plat case: $750.00 plus $150.00 per additional request + publication + personal notice fee for public hearings as applicable.
(tt) 
Vested rights determination:
$2,500.00 + escrow.
(uu) 
Zoning change:
$2,000.00 + $150.00/acre + publication fee (zoning) + personal notice fee for public hearings.
(vv) 
Zoning verification letter:
$150.00.
(ww) 
Historic preservation application/review/certificate of appropriateness administrative or commission approved:
$35.00.
(xx) 
PID/MUD special district (TIFF/TIRZ) application fee: $25,000.00 + publication fee + personal notification fee + escrow for consultant/legal review. 5% fee assessed on top of third-party costs.
(yy) 
Floodplain development permit:
$750.00 (includes completion review and 3 plan reviews. A 4th plan review requires payment of a new review fee).
(zz) 
Water and wastewater impact fees (adopted 2017):
(1) 
Water impact fee $3,595.00 per LUE (living unit equivalent).
(A) 
Fee calculation based on water meter size:
Meter Size
Water Fee
3/4" or 5/8"
$3,595.00
1"
$5,752.00
1-1/2"
$7,190.00
2"
$23,008.00
3"
$46,016.00
4"
$71,900.00
6"
$201,320.00
8"
$345,120.00
10"
$546,440.00
12"
$719,000.00
(2) 
Wastewater impact fee $3,515.00 per LUE (living unit equivalent).
(A) 
Fee calculation based on water meter size.
Meter Size
Sewer Fee
3/4" or 5/8"
$3,515.00
1"
$5,624.00
1-1/2"
$7,030.00
2"
$22,496.00
3"
$44,992.00
4"
$70,300.00
6"
$196,840.00
8"
$337,440.00
10"
$534,280.00
12"
$703,000.00
(aaa) 
ETJ release $500.00 + GIS/technology fee.
(Ordinance 2021-33 adopted 12/7/21; Ordinance 2022-26 adopted 9/20/2022; Ordinance 2023-15 adopted 9/19/2023; Ordinance 2024-33 adopted 7/16/2024)