(a)
Escrow authorization:
For any building and development-related
fee, the city may require escrow of funds to cover any third-party
review expenses beyond normal and customary. Such escrow shall be
based on estimated costs provided by the applicable third-party professional
service provider. 5% fee assessed on top of third-party costs.
(b)
Designated third-party review
fees:
Applicable permit fees
+ $25,000.00 escrow deposit; 5% fee assessed on top of third-party
review costs.
(c)
Administrative exception or appeal:
$1,000.00 per exception.
(d)
Annexation petition:
$1,000.00 + publication fee.
(e)
Certificate of occupancy (temporary
or permanent):
$250.00.
(f)
Comprehensive plan amendment.
Less than 5 acres
|
$2,500.00
|
5+ to 25 acres
|
$3,000.00
|
25+ to 50 acres
|
$4,000.00
|
50+ or more acres
|
$5,000.00 + $15.00 per acre
|
*$2,500.00 for policy change not
affecting land.
|
(g)
Contractor registration:
$100.00.
(h)
Cross-connection permit/backflow
prevention assembly testing permits.
(1)
Customer: $100.00 per device.
(3)
Re-test by city: $500.00.
(i)
Demolition permit:
$500.00.
(j)
Development agreement.
$7,500.00 + $200.00 per acre + publication
fee + personal notification fee + escrow for consultant/legal review.
(k) Establishment/vacation
of easement/agreement:
$750.00 + recording fee.
(l)
Building single trade permits
(mechanical, electrical, plumbing, flatwork, roof etc.).
(m)
Electrical pole (temporary):
$100.00.
(n)
Grease traps.
(1)
Application fee: $150.00.
(o)
Building plan reviews (includes
3 plan reviews; additional reviews require new review fee):
(1)
Residential new construction review:
$500.00 +$0.25 per square foot.
(2)
Residential remodel/accessory review:
$200.00.
(3)
Commercial: $500.00 + $0.35 per square
foot.
(p)
Building inspections.
(1)
Residential: $125.00 (reinspection
is 1.5 times the original inspection: $225.00).
(2)
Commercial:
(A) Building under 1,500 square feet: $200.00.
(B) Building 1,500+ square feet: $200.00 + $0.02 per square foot of building.
(C) Reinspection fee: $300.00 (1.5 x base inspection fee).
(q)
Legal lot determination:
$250.00.
(r)
Moving structure permit:
$500.00 + escrow of costs associated
with road closures, traffic-control and other municipal expenses incurred.
(s)
Off-site infrastructure:
$800.00/page of plan set.
(t)
Parking fee in lieu:
$4,000.00 per parking space.
(u)
Plats.
(1)
Preliminary plat/plan (new or revised):
$5,000.00 + greater of $75.00/lot or $75.00/acre.*
(2)
Amending or administrative replat:
$1,000.00 + greater of $50.00/lot or $50.00/acre.*
(3)
Final plat: $2,000.00 + greater of
$50.00/lot or $50.00/acre.*
(4)
Replat - requires P&Z and/or
city council approval: $2,000.00 + greater of $50.00/lot or $50.00/acre
+ publication fee + personal notice fee.*
(5)
Vacation: $1,000.00 + greater of
$50.00/lot or $50.00/acre.*
* Includes completeness check and 3 review fees – new
fees will be required on 4th submittal.
(w)
Publication fees/sign postings
for public hearings:
$500.00.
(x)
Personal notice fee for public
hearings:
$7.50 per letter.
(y)
PD district or amendment:
$3,500.00 + $300.00 per acre + publication
fee + personal notice fee for public hearings + escrow.
(z)
Red tag/stop work.
(1)
Cease and desist order: $750.00 per
trade.
(2)
Reinspection: 1.5 times the original
inspection fee $300.00.
(aa)
Right-of-way or easement abandonment
application:
$750.00 + escrow
for consultant review.
(bb)
Sidewalk fee in-lieu:
$15.00 per sq. ft.
(cc)
Short-term rental (STR).
New application and yearly permit
- $150.00.
(dd)
Signs.
(1)
$200.00 + $2.00 per sq. ft. per sign
area.
(A)
Electrical trade inspection for lighted
signs: $200.00.
(B) Pre-pour hole inspection for pole/pylon signs: $200.00.
(2)
Electronic reader board; message
for up to 30 days (nonprofit only): $30.00.
(ee)
Site/construction infrastructure
inspection.
Inspection Type
|
Unit
|
Fee
|
---|
Erosion control (excluding revegetation)
|
Per inspection*
|
$200.00
|
Pre-walk inspection
|
Per inspection*
|
$500.00
|
Liftstation
|
Per inspection/station*
|
$1,000.00
|
Wastewater improvements
|
Linear foot*
|
$2.00
|
Water improvements
|
Linear foot*
|
$1.10
|
Storm improvements
|
Linear foot*
|
$2.00
|
Detention pond and WQ facilities
|
Per pond*
|
$2,400.00
|
Detention pond and WQ facilities street improvements
|
Cubic feet over 100,000
|
$0.015
|
Square yards pavement base*
|
$0.10
|
Driveways
|
Each*
|
$150.00
|
Revegetation
|
Per inspection*
|
$200.00
|
Final walk
|
First inspection
|
$2,100.00
|
Final walk reinspection
|
Per inspection*
|
$1,050.00
|
*Reinspections incur new fees.
(ff)
Site plan/development review
(includes completion review and 3 plan reviews.
A 4th plan review requires payment of a new review
fee.):
(1) Site less than 1 acre: $1,500.00 + $0.05/s.f. of impervious cover.
(2) Sites over 1 acre: $2,500.00 + $0.05/s.f. of impervious cover + $250.00
per page.
(gg)
Site plan/development review,
public infrastructure, and construction plans correction or revision:
$750.00 + $100.00/revised page.
(hh)
Utility infrastructure/construction
plans (includes completion review and 2 plan reviews.
$800.00/page of plan set.
(ii)
Specific use permit (SUP):
(1)
$1,500.00 + $50.00 per acre + publication
fee + personal notice fee for public hearings.
(2)
Minor amendment administrative: $500.00.
(3)
Major amendment requiring hearings:
$750.00 + $50.00 per acre + publication fee + personal notice fee
for public hearings.
(jj)
Irrigation permits.
(3)
VEPO/CSI/backflow report review:
$75.00.
(kk)
Start work without permit or
without board or commission approval:
$750.00 per trade and permit.
(ll)
Street closure (related to construction):
(1)
Short-term (24 hours or less) neighborhood/nonprofit:
$150.00.
(2)
Short-term (24 hours or less) commercial
and construction: $300.00.
(3)
Long-term (more than 24 hours): $300.00
plus $200.00 per week or portion thereof/per lane/per block.
(mm)
Online permit fee (MyPermitNow
Fee):
$20.00.
(nn)
Technology/GIS fee (applied to
annexation/zoning/plats/SUP/site plan):
$250.00.
(oo)
Traffic impact analysis.
(1)
TIA application/worksheet review:
$500.00.
(2)
Less than 2,000 trips per day: $3,000.00.
(3)
2,000–5,000 trips per day:
$5,000.00.
(4)
5,001–10,000 trips per day:
$7,500.00.
(5)
10,001–15,000 trips per day:
$10,000.00.
(6)
15,001+ trips per day: $15,000.00.
(7)
Traffic impact analysis (TIA) revision:
1/2 current TIA fee.
(pp)
Tree removal permit (including
review, outside of a site development permit).
(1)
Commercial: $200.00 + mitigation.
(2)
Residential: $150.00 + mitigation.
(qq)
Tree mitigation fees (price per
caliper inch mitigation required).
(1)
Protected tree (8" to 20"): $200.00.
(2)
Signature tree (20" to 30"): $350.00.
(3)
Heritage tree (30"+): $500.00.
(rr)
Parkland dedication/improvement
fee in lieu:
(1)
Land dedication fee in lieu: per
residential unit: $800.00.
(2)
Parkland improvement fee in lieu:
per residential unit: $1,000.00.
(ss)
Variance/special exception/alternative
compliance:
(1) Outside of site/plat case: $1,500.00 base fee plus $300.00 per additional
request + publication + personal notice for public hearings as applicable.
(2) As a part of site/plat case: $750.00 plus $150.00 per additional
request + publication + personal notice fee for public hearings as
applicable.
(tt)
Vested rights determination:
$2,500.00 + escrow.
(uu)
Zoning change:
$2,000.00 + $150.00/acre + publication
fee (zoning) + personal notice fee for public hearings.
(vv)
Zoning verification letter:
$150.00.
(ww)
Historic preservation application/review/certificate
of appropriateness administrative or commission approved:
$35.00.
(xx)
PID/MUD special district
(TIFF/TIRZ) application fee: $25,000.00 + publication
fee + personal notification fee + escrow for consultant/legal review.
5% fee assessed on top of third-party costs.
(yy)
Floodplain development permit:
$750.00 (includes
completion review and 3 plan reviews. A 4th plan review requires payment
of a new review fee).
(zz)
Water and wastewater impact fees (adopted 2017):
(1)
Water impact fee $3,595.00 per LUE (living unit equivalent).
(A)
Fee calculation based on water meter size:
Meter Size
|
Water Fee
|
---|
3/4" or 5/8"
|
$3,595.00
|
1"
|
$5,752.00
|
1-1/2"
|
$7,190.00
|
2"
|
$23,008.00
|
3"
|
$46,016.00
|
4"
|
$71,900.00
|
6"
|
$201,320.00
|
8"
|
$345,120.00
|
10"
|
$546,440.00
|
12"
|
$719,000.00
|
(2)
Wastewater impact fee $3,515.00 per LUE (living unit equivalent).
(A)
Fee calculation based on water meter size.
Meter Size
|
Sewer Fee
|
---|
3/4" or 5/8"
|
$3,515.00
|
1"
|
$5,624.00
|
1-1/2"
|
$7,030.00
|
2"
|
$22,496.00
|
3"
|
$44,992.00
|
4"
|
$70,300.00
|
6"
|
$196,840.00
|
8"
|
$337,440.00
|
10"
|
$534,280.00
|
12"
|
$703,000.00
|
(aaa)
ETJ release $500.00 + GIS/technology fee.
(Ordinance
2021-33 adopted 12/7/21; Ordinance 2022-26 adopted 9/20/2022; Ordinance
2023-15 adopted 9/19/2023; Ordinance 2024-33 adopted 7/16/2024)