(A)
Inspections.
(1)
The Director of Engineering or his authorized representative shall inspect the construction of improvements (all phases) while in progress, as well as upon completion. The applicant, or contractor, shall maintain regular contact with the Director of Engineering during construction of improvements.
(2)
Construction must conform to the approved Site Engineering Drawings. The City reserves the right to require corrections to the Drawings, at the applicant’s sole expense, to accommodate actual site conditions differing from that shown on the approved plans; for details not consistent or equivalent to the latest revision to the City’s Technical Standards; and, to accommodate omissions on the approved plans. Any significant change in design required during construction shall be made by the applicant’s engineer, and shall be subject to approval by the Director of Engineering.
(3)
If the Director of Engineering finds upon inspection that any of the required public improvements have not been constructed properly and in accordance with the approved Site Engineering Drawings, the applicant shall be responsible for correcting and completing the public improvements. The applicant or contractor shall maintain daily contact with the City inspector during construction of improvements. No public wastewater, water or storm sewer pipe shall be covered without approval of the City inspector. No subgrade material, stabilization or paving shall be applied in public right-of-way without approval of the City inspector. The inspector may at any time cause any construction, installation or maintenance of improvements to cease when, in his judgment the City’s Technical Standards have been violated and may require reconstruction or other work, as may be necessary, to correct the violation.
(4)
A fee as set forth in section 50.33 of the City Code, shall be paid by the builder for the setting of a water meter for each lot in a subdivision. Such fee shall be paid at the time of the application for the Building Permit for each lot.
(5)
Temporary water service for house construction shall be provided after a water meter is set (direct connection to the water tap is not allowed). A fee as set forth in Section 30.301 of Chapter 30, “Building Inspection,” of the City Code, shall be paid for each temporary service. Temporary water service shall not continue for more than one hundred twenty calendar days following the date of its initial installation. Temporary water service shall be discontinued when final inspection is made on the house.
(B)
Maintenance During Construction.
The applicant shall be responsible for maintaining all required public improvements during construction of the development.
(Ordinance 6773 adopted 5/19/15)