It is the purpose of this article to preserve the natural resources; to protect the quality of the waters of the state and the city; and to protect and promote the health, safety and welfare of the people, to the extent practicable by minimizing the amount of sediment and other pollutants carried by run off or discharged from land developing activities and land-disturbing construction activities to lakes, streams and wetlands.
(Ordinance 12-03 adopted 4/19/12)
The following words, terms, and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Belowground installations.
Activity that causes excess sediment laden water, concrete sawing washwater, washwater or drilling mud pumped from an excavation or structure and shall be treated as sediment laden run off for erosion control purposes.
Building official.
The building official for the city or their designee.
BMP.
Best management practices.
Construction activities.
Construction activities that require a right-of-way or building permit.
Director of public works or director.
The director of public works for the city or his designee.
Erosion Control Manual.
The North Central Texas Council of Governments (NCTCOG) Manual of best management practices, as amended from time to time. A current copy of the manual shall be kept on file in the office of the department of public works and may be obtained from the NCTCOG offices.
Erosion control plan.
A site plan with necessary details, showing the property where land-disturbing activity will take place and showing the locations and types of structures, devices, procedures and practices to be used to control erosion and sedimentation.
Final approval.
Completion of a project, site or building in accordance with city requirements and ordinances. In the case of a building, a certificate of occupancy is issued.
HOA.
Homeowners association.
Land-disturbing activity.
Any activity, including but not limited to excavation, planting, and grading, which disturbs 1 acre (43,560 square feet) of the natural or improved vegetative ground cover so as to expose soil to the erosive forces of rain, stormwater run off or wind. Land-disturbing activities also include areas smaller than one acre that are part of a larger common plan of development or sale. All installations and maintenance of franchise utilities such as telephone, gas, electric, etc., shall be considered land-disturbing activities.
MS4 or municipal separate storm sewer system.
The system of conveyances (including but, not limited to sidewalks, roads with drainage systems, municipal streets, catchbasins, curbs, gutters, ditches, manmade channels, or storm drains) owned and operated by the city and designed or used for collecting or conveying stormwater, that is not used for collecting or conveying domestic sewage.
National Pollutant Discharge Elimination System or NPDES.
A program to issue authorizations to discharge pollutants into waters of the United States if certain conditions are met.
Off-site borrow area.
A source of earth fill material used in the construction of embankments or other earth fill structures, that is located on another parcel of property other than where the principal construction is occurring.
Off-site sedimentation.
Deposit of soil material beyond the limits of the property undergoing land-disturbing activity or in public streets, alleys or drainage facilities in an amount sufficient to constitute a threat to public safety and comfort.
Off-site spoil area.
An area on another parcel of property, other than where the principal construction is occurring, where excess earth, rock or construction material is disposed of.
Permanent erosion control devices.
Devices or practices installed prior to final approval and maintained after final approval to prevent or minimize the erosion and deposit of soil materials. Such devices may include, but shall not be limited to, permanent seeding, sod, storm drain channels, channel linings, storm drain pipes, outlet velocity control structures and stormwater detention structures.
Permanent ground cover.
Permanent vegetative cover on all bare soil areas of a property not covered by a permanent structure or landscaping improvements, including but not limited to, live sod, perennial grasses or other materials which lessen runoff and soil erosion on the property.
Phased occupancy.
Use or inhabitation of a single structure or other portion of a project as such structure or portion thereof is completed, but before the project as a whole is fully completed and finally approved by the city.
Related land area.
Includes the property where the principal land-disturbing activity is taking place, all adjacent property, off-site borrow areas, off-site spoil areas, off-site properties necessary for required utility extensions, and off-site areas for required street improvements.
Responsible party.
A business entity, franchised utility company, developer, property owner, contractor or holder of a building permit who is required to comply with the terms of this article.
Staging area.
An on-site or off-site location used by a contractor to store materials for a project, to assemble portions of equipment or structures, to store equipment or machinery, to park vehicles, or for other construction related uses.
Stop-work order.
The suspension of all city permits with no approvals or inspections of work for the site or project being performed.
TCEQ.
The Texas Commission on Environmental Quality.
Temporary erosion control devices.
Devices installed or practices implemented and maintained during land-disturbing activities to prevent, minimize or control the erosion and deposit of soil materials.
(Ordinance 12-03 adopted 4/19/12)
(a) 
Federal and state regulations.
Current Federal Regulations (section 402 of the Clean Water Act) and state regulations (chapter 26 of the Texas Water Code) require all owners/operators of stormwater discharges from industrial activities to apply for and operate pursuant to Texas Pollutant Discharge Elimination System (TPDES) general permit TXR150000 hereafter referred to as the “state permit.” The state permit regulates land-disturbing activities that result in the disturbance of one or more acres of total land area, including areas smaller than one acre that are part of a larger common plan of development or sale.
(b) 
A responsible party engaging in a regulated land-disturbing activity is responsible for compliance with the Texas Commission on Environmental Quality (TCEQ) state permit. The responsible party shall submit to TCEQ a notice of intent (NOI) or construction site notice for coverage under the state permit, and shall also provide the director of public works with a copy of the NOI or construction site notice prior to beginning any land-disturbing activity.
(c) 
A responsible party engaging in a regulated land-disturbing activity shall prepare a stormwater pollution prevention plan (SWPPP) satisfying all requirements of the state permit. A copy of the SWPPP shall be provided to the director of public works prior to the start of any land-disturbing activity. The SWPPP shall be prepared by either a registered professional engineer licensed in the state, a certified professional in erosion and sediment control (CPESC) or a certified professional in stormwater quality (CPSWQ).
(d) 
Any responsible party not in compliance with the TPDES general permit TXR150000 shall be in violation of this article as well as state and federal law and shall be subject to all local, state and federal enforcements.
(Ordinance 12-03 adopted 4/19/12)
(a) 
Application of article.
A responsible party engaging in any land-disturbing activity shall prepare an erosion control plan and submit that plan to the city for approval. This article shall apply regardless of whether a responsible party is required to obtain a permit from the city in order to conduct such land-disturbing or construction activity. The responsible party shall also be held liable for violations of this article committed by third parties engaging in activities related to the responsible party’s project.
(b) 
Erosion control plan implementation and compliance.
Each responsible party shall implement and maintain the erosion control measures shown on its approved erosion control plan in order to minimize the erosion and the transport of silt, earth, topsoil, etc., by water run off or construction activities, beyond the limits of the responsible party’s site onto city streets, drainage easements, drainage facilities, storm drains or other city property prior to beginning any land-disturbing activity.
(c) 
Off-site borrow, spoil and staging areas.
Where applicable, off-site borrow areas, spoil areas and construction staging areas shall be considered as part of the project site and shall be governed by this article.
(d) 
Related land areas.
The erosion control requirements of this article shall apply to all related land areas. Additionally, when land-disturbing activity occurs on a project, all disturbed land areas related to the project shall have permanent erosion control established before final occupancy of structures located thereon or final acceptance of the subdivision may be obtained. This section applies whether or not a building permit is required.
(e) 
Belowground installations.
All discharges resulting from belowground installations shall be passed through city-approved erosion control device(s) or removed from the site and properly disposed of.
(Ordinance 12-03 adopted 4/19/12)
Plan requirements generally. Each erosion control plan required by this article shall clearly identify all erosion and sediment control measures to be installed and maintained throughout the duration of the project for which that plan is submitted. The responsible party shall install and maintain erosion control devices in accordance with their city-approved erosion control plan as required by this article. Erosion and sediment control devices shall be installed and maintained in accordance with the city’s erosion control manual. General guidelines for erosion and sediment control are as follows:
(1) 
Maximum use shall be made of vegetation to minimize soil loss.
(2) 
Natural vegetation should be retained wherever possible.
(3) 
Where inadequate natural vegetation exists, or where it becomes necessary to remove existing natural vegetation, temporary controls should be installed promptly to minimize soil loss and ensure that erosion and sedimentation does not occur.
(4) 
Wherever possible during construction, erosion and sedimentation controls shall be used on hillsides to slow drainage flow rate.
(5) 
Erosion and sedimentation control elements should be implemented as soon as practical in the development process. Erosion and sedimentation controls shall be maintained by the responsible party. Erosion and sedimentation controls that are installed but not properly maintained in accordance with the city’s erosion control manual shall be considered a violation of this article.
(6) 
Waste or disposal areas and construction roads should be located and constructed in a manner that will minimize the amount of sediment entering streams.
(7) 
Frequent fording of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are necessary.
(8) 
When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the sediment transport into a stream.
(9) 
Should preventative measures fail to function effectively, the applicant shall act immediately to bring the erosion and/or siltation under control by whatever additional means are necessary.
(10) 
Erosion control devices shall be placed to trap any losses from stockpiled topsoil.
(11) 
The selection and timing of the installation of erosion controls shall be based upon weather and seasonal conditions that could make certain controls not practicable.
(12) 
Vegetation used for vegetative cover shall be suitable for local soil and weather conditions. Ground cover plants shall comply with listings from the Texas Agricultural Extension Service for North Central Texas.
(13) 
Runoff shall be diverted away from construction areas as much as possible.
(14) 
Stripping of vegetation from project sites shall be phased so as to expose the minimum amount of area to soil erosion for the shortest possible period of time. Phasing shall also consider the varying requirements of an erosion control plan at different stages of construction.
(15) 
Developers, builders, or owners of property shall install all utilities, including franchise utilities, before final acceptance of a subdivision, property and/or structure. Final acceptance will also be contingent upon having all necessary erosion control measures installed to minimize off-site sediment. A site may be accepted without erosion control measures if perennial vegetative cover is actively growing at the discretion of the director of public works.
(Ordinance 12-03 adopted 4/19/12)
(a) 
Prior to beginning any land-disturbing activity or upon the effective date of this article, a responsible party engaging in land-disturbing activity for nonresidential and multifamily construction projects shall submit an erosion control plan to the city for approval. The approved erosion control plan shall be implemented and erosion control devices shall be maintained as specified in the plan and the city’s erosion control manual. A responsible party engaging in nonresidential and multifamily activities shall comply with all other general requirements of this article.
(b) 
When construction or land-disturbing activities are conducted as part of a nonresidential or multifamily construction project, permanent erosion control shall be established prior to the occupancy of any nonresidential or multifamily structure. Phased occupancy will be allowed only when there are no outstanding erosion control violations for the project for which the request is made.
(Ordinance 12-03 adopted 4/19/12)
In addition to the other requirements of this article, when construction or land-disturbing activities are conducted as part of a residential subdivision project, the following shall apply:
(1) 
Erosion control plan.
Prior to approval of the final plat, the responsible party shall submit an erosion control plan for approval by the city. No inspection of any type may be performed on a project or portion thereof until a city-approved erosion control plan is implemented by the responsible party.
(2) 
Final acceptance.
Permanent erosion control devices and when applicable, temporary erosion control devices, as specified in the approved erosion control plan shall be installed and maintained prior to final acceptance of a subdivision. The developer for such subdivision shall continue to maintain all temporary erosion control devices until permanent erosion control has been established on all those lots within the subdivision for which a building permit has not been issued.
(3) 
Transfer of property by developer.
If the responsible party sells all or part of the lots in a subdivision to a purchaser, that purchaser becomes the responsible party for the subdivision or the lots sold and is liable for violation of this article. The sale of lots shall be logged within the SWPPP kept at the project site along with written proof of transfer of lots. As required by this article, the purchaser shall be required to comply with the city-approved erosion control plan and SWPPP.
(4) 
Stop-work orders/citation.
(A) 
The city shall inspect the erosion control devices located at a site for compliance with the approved erosion control plan submitted by a responsible party. If a responsible party fails to implement or maintain erosion control devices as specified in their approved erosion control plan, the city shall provide such party with written notice of noncompliance identifying the nature of the noncompliance. The responsible party shall have twenty-four (24) hours to bring their erosion control devices into compliance with the approved erosion control plan for the site to which notice of noncompliance was issued. Correction shall include sediment clean up, erosion control device repair, erosion control device maintenance and/or installation of additional erosion control devices to prevent reoccurrence of the violation. The 24-hour cure period may be extended for inclement weather or other factors at the discretion of the director of public works.
(B) 
At the end of the twenty-four (24) hour cure period, the city shall reinspect the site. If at the time of such reinspection, the erosion control devices at the site have not been brought into compliance with the approved erosion control plan, the city may issue a stop-work order and issue a citation for each violation of this article. To obtain a reinspection for removal of the stop-work order, a request for reinspection must be submitted.
(Ordinance 12-03 adopted 4/19/12)
Subject to the terms of its franchise agreement with the city, including but not limited to terms regarding permits, a franchised utility company engaging in land-disturbing activities within the city shall comply with the following:
(1) 
Erosion control plan.
Prior to beginning any land-disturbing activity or upon the effective date of this article, an erosion control plan shall be submitted for approval by the city.
(2) 
Stop-work order/citation.
(A) 
The city shall inspect the erosion control devices located at a site for compliance with the approved erosion control plan submitted for such site. If a responsible party fails to implement or maintain erosion control devices as specified in their approved erosion control plan, the city shall provide such party with written notice of noncompliance identifying the nature of such noncompliance. The responsible party shall have twenty-four (24) hours to bring their erosion control devices into compliance with the approved erosion control plan for the site where the violation occurred. Correction shall include sediment clean up, erosion control device repair, and erosion control device maintenance. The 24-hour cure period may be extended for inclement weather or other factors at the discretion of the director of public works.
(B) 
At the end of the 24-hour cure period, the city shall reinspect the site. If at the time of such reinspection, the erosion control devices at the site have not been brought into compliance with the approved erosion control plan, the city may issue a stop-work order and issue a citation for each violation of the city’s erosion control requirements. To obtain a reinspection for removal of the stop-work order, a request for reinspection must be submitted.
(Ordinance 12-03 adopted 4/19/12)
When land-disturbing activities are conducted on a residential lot for which a building permit must be issued, the responsible party shall comply with the following:
(1) 
Erosion control plan.
Prior to approval of a building permit for a residential lot by the city, the contractor or other responsible party obtaining the building permit shall submit an erosion control plan for approval by the city. No inspection may be performed on a project until a city-approved erosion control plan is implemented.
(2) 
Stop-work order/citation.
(A) 
The city shall inspect the erosion control devices located at a site for compliance with the approved erosion control plan submitted for such site. If a responsible party fails to implement or maintain erosion control devices as specified in their approved erosion control plan, the city shall provide such party with written notice of noncompliance identifying the nature of such noncompliance. The responsible party shall have twenty-four (24) hours to bring their erosion control devices into compliance with the approved erosion control plan for the site where the violation occurred. Correction shall include sediment clean up, erosion control device repair, erosion control device maintenance, and/or installation of additional erosion control devices to prevent reoccurrence of the violation. The 24-hour cure period may be extended for inclement weather or other factors at the discretion of the building official.
(B) 
At the end of the 24-hour cure period, the city shall reinspect the site and may assess a reinspection fee. If at the time of such reinspection, the erosion control devices at the site have not been brought into compliance with the approved erosion control plan, the city may issue a stop-work order and issue a citation for each violation of the city’s erosion control requirements. When a stop-work order has been issued, a reinspection fee shall be assessed. To obtain a reinspection for removal of the stop-work order, a request must be submitted therefor and a reinspection fee, as set by the building inspection department of the city, shall be paid.
(3) 
Removal of erosion control devices.
Upon establishing permanent ground cover on a lot, all temporary erosion control devices shall be removed.
(Ordinance 12-03 adopted 4/19/12)