Within the period of Planning and Zoning Commission approval of the subdivision master plan or preliminary plat, the subdivider shall cause to be prepared a final plat and construction plans of that land platted in the subdivision master plan or preliminary plat, and incorporating any and all changes, modifications, alterations, corrections, and conditions imposed by the Planning and Zoning Commission in approving the subdivision master plan or preliminary plat.
(Ordinance 601 adopted 2/5/07; Ordinance 648 adopted 10/4/10)