A.
Minimum road frontage. Despite any provision contained in this Zoning chapter to the contrary, no building permit shall be issued for the construction or the erection of any building or structure on a parcel of property unless that parcel has road frontage on a public street consisting of at least 75% of the minimum required lot width. Nothing herein shall be construed to allow a flag lot, which lots are prohibited.
B.
General area and bulk requirements; accessory uses and structures.
(1)
Encroachments in required yards.
(a)
Projections.
[1]
Ordinary projections of window sills, belt courses, cornices, eaves and other similar architectural features shall be permitted to encroach no more than three feet.
[2]
An arbor, open trellis, or flagpole shall be permitted to encroach into any yard. Clothes-drying equipment shall be permitted to encroach within a rear yard.
[3]
An awning or movable canopy shall be permitted to project not more than four feet into any required yard.
(b)
Location of accessory buildings.
[1]
No accessory building in any district shall be located in any required front or side yard, except in conformity with the district requirements.
[2]
An accessory building shall be permitted in a required rear yard, subject to the following:
[a]
The aggregate ground area covered by accessory buildings in any rear yard, including the ground area covered by any attached accessory buildings such as a deck, shall not exceed 25% of the rear yard in any residence district or 50% of the rear yard in any business or industrial district.
[b]
No accessory building shall be closer than provided by the requirements of each district to any principal building unless it is attached thereto and is a part of such principal building.
(2)
Fire escapes. No exposed fire escapes shall be permitted on any side of a building fronting to a street.
(3)
Storage in yards.
(a)
Temporary storage containers and dumpsters. Containers, including but not limited to moving, shipping, portable and storage containers, trailers, dumpsters, and similar structures, are not permitted on any property in the Village of Hillburn for more than seven successive days except in accordance with the following standards:
[1]
Containers are allowed only upon issuance of a temporary permit from the Code Enforcement Officer for a time period not to exceed six months. The Code Enforcement Officer may extend the permit for up to two additional time periods of no more than three months each where the owner demonstrates a continuing need for temporary storage, e.g., home construction and repair or similar circumstance.
[2]
Containers shall be used only for the temporary storage of goods in the ownership or used by the occupants of the lot upon which the container is located.
[3]
The Code Enforcement Officer shall prohibit any type of storage which the Code Enforcement Officer deems is hazardous or flammable. The general contents of the storage container shall be described in the temporary permit application.
[4]
The container shall not be stored in any required yard unless the Code Enforcement Officer determines there is no other reasonable location in which to store said container.
(4)
Dumpsters and trash containers. All properties within the Village of Hillburn shall be kept free of litter and debris and shall maintain trash receptacles and containers on-site. Trash receptacles and dumpsters shall remain closed at all times and be designed so as to prevent the release of refuse or other materials stored therein. Except for a temporary dumpster which may be allowed in accordance with this Zoning chapter, and refuse containers associated with a one-family or two-family residence, all permanent dumpsters and refuse areas associated with any other use shall be screened from view with a six-foot-high opaque fence, or year-round vegetative screening no less than six feet high at the time of planting. After the effective date of this Zoning chapter, a permanent dumpster or trash container with a capacity of three cubic yards and greater shall be installed only in a location on a site with a principal use which has received site plan or special use permit approval. No dumpster or similar container shall be located within 25 feet of an adjoining residential lot line or residential building.
C.
Height exceptions. The height limitations of this chapter shall not apply to the following structures:
(1)
Church spires, belfries, cupolas, domes not used for human occupancy, chimneys, ventilators, skylights, water tanks, bulkheads and other necessary mechanical appurtenances usually carried above the roof level, a parapet wall or cornice for ornament, extending above such height limit not more than four feet, or a radio or television receiving antenna serving residences.
(2)
In nonresidential zoning districts only, radio or television receiving towers or dishes.
D.
Buffer area requirements for district boundaries.
(1)
Except as provided in Subsection D(2) below, where a lot in the Local Shopping Nonresidential Zoning District abuts a lot in a residential zoning district, there shall be provided along such abutting line on the nonresidential district lot a buffer at least equal in width to that required in the abutting residential district, but in no instance less than 50 feet, which shall be in addition to any required yard. The buffer area shall remain undisturbed and shall not be used for storage of any material or goods, parking area, road, driveway, or other improvements, and the Planning Board, in its discretion, may require that the buffer area be suitably landscaped with year-round plantings no less than six feet in planting height. The Planning Board may also require a solid fence no less than six feet in height. The Planning Board shall establish the location of the landscape materials and fence within the buffer, and the buffer shall extend the full length of the shared property line of the two lots. The Planning Board may modify the requirement that the fence or hedge be extended the length of the common lot line to ensure adequate sight distance is maintained.
(2)
Where a lot in the General Commercial, Regional Economic Development or Light Industrial District abuts a lot in a residential district, there shall be provided along such abutting line on the nonresidential district lot a buffer at least equal in width to that required in the abutting residential district, but in no instance less than 75 feet, which shall be in addition to any required yard. The buffer area shall remain undisturbed and shall be not be used for storage of any material or goods, parking area, road, driveway, or other improvements, and the Planning Board, in its discretion, may require that the buffer area be suitably landscaped with year-round plantings no less than six feet in planting height. The Planning Board may also require a solid fence no less than six feet in height. The Planning Board shall establish the location of the landscape materials and fence within the buffer, and the buffer shall extend the full length of the shared property line of the two lots. The Planning Board may modify the requirement that the fence or hedge be extended the length of the common lot line to ensure adequate sight distance is maintained.
E.
Land disturbance activities; excavations; soil mining; quarrying. Excavations, soil mining, soil processing, quarrying, blasting and similar activities as a principal use are prohibited. Land disturbance activities, excavations, soil mining, and/or quarrying are hereby prohibited except in association with land development activities associated with a use otherwise allowed as a permitted use or special use in the district within which it is located. Further, any land disturbance activity adversely affecting natural drainage or structural safety of adjoining buildings or lands is hereby prohibited. All land disturbance activity regulated herein shall be in accordance with Subsection E(1) below. The Planning Board shall require from any applicant, prior to the issuance of a permit for any activity approved under this section, a performance bond, cash escrow or other arrangement acceptable to the Planning Board, upon the advice of the Village Attorney and Village Engineer, to ensure that emergency measures could be taken by the Village at the applicant's expense should the applicant fail within the time specified to initiate appropriate conservation action which may be required. Within 180 days of the completion of the land disturbance activity, such bond, cash escrow or other legal arrangement, or the unexpended portion thereof, shall be refunded to the applicant or terminated, as appropriate.
(1)
Land Disturbance Activity for construction of buildings.
(a)
Land disturbance activity in connection with the construction on the same lot of a building for which site plan or subdivision approval has been granted showing limits of disturbance, and a building permit has been issued, shall be permitted in any district.
(b)
No land disturbance activity shall exceed the limit of disturbance shown on an approved site plan or subdivision plan.
(c)
In the event that building construction is not completed and the building permit thereof expires, the premises shall be cleared of any rubbish, building materials, or other unsightly accumulations, and any excavation for a building, basement, foundation, utility or otherwise of a depth greater than two feet below grade shall be filled and the topsoil replaced, or all such excavations shall be entirely surrounded by a substantial fence at least six feet high that will effectively block access to the area. Where necessary, suitable gates will be installed and provided with locks. Such clearing, filling and/or fencing shall be completed not later than the expiration date of the building permit.
(2)
Conservation of natural resources. The purpose of this regulation is to conserve the land, water and other natural resources of the Village and promote the public health and welfare of the people by establishing requirements for the control of erosion and sedimentation and by establishing procedures whereby these requirements shall be administered and enforced.
(3)
Administration. The Planning Board is hereby authorized to issue land disturbance permits for activities permitted under this section. Land disturbance permits may only be issued in relation to work to be performed pursuant to an approved subdivision plat, special use permit, or site plan and for a use allowed by right or by special use permit in the district in which the activity is located.
(4)
Erosion and sediment control plans. The plans required by this section shall comply to all applicable erosion, sediment control and flood control regulations adopted by the Village of Hillburn, Village of Ramapo, the County of Rockland, and New York State. The more restrictive requirements shall prevail.
(5)
Regulated land disturbance activities.
(a)
No person shall engage in any land disturbance activity, as defined in § 250-7 of this Zoning chapter, until an erosion and sediment control plan for such land disturbance activity has been reviewed and approved by the Planning Board and the Planning Board has approved a land disturbance permit.
(b)
Whenever a land disturbance activity is proposed to be conducted by a contractor performing construction work pursuant to a construction contract, the preparation, submission and approval of the required erosion and sediment control plan shall be the responsibility of the owner of the land.
(c)
No approval for a land disturbance permit may be issued until the regulations implementing the New York State Environmental Quality Review Act have been complied with.
(6)
Action on erosion and sediment control plans.
(a)
The Planning Board shall approve any erosion and sediment control plan submitted to it only if it determines that the plan meets the conservation standards of the control programs and if the person responsible for carrying out the plan certifies that he will properly perform the measures included in the plan and will comply with the provisions of this chapter. The time frame for approval shall be the same time frame as site plan approval or subdivision approval.
(b)
The approved plan may be changed in the following cases:
[1]
When inspection by the Village has revealed the inadequacy of the plan to accomplish the erosion and sediment control objectives of the plan, and appropriate modifications to correct the deficiencies are agreed to by the owner/applicant and the Village.
[2]
Where the person responsible for carrying out the approved plan finds that, because of a change in circumstances, the approved plan cannot be carried out effectively and the proposed amendments to the plan are agreed to by the owner/applicant and the Village.
(7)
Issuance of land disturbance permit.
(a)
Except as provided herein, no person shall engage in any land disturbance activity until a land disturbance permit has been issued by the Planning Board. Initial applications are to be filed with the Code Enforcement Officer.
(b)
The Planning Board shall not issue any land disturbance permit unless the applicant therefor submits with its application a filing fee in an amount to be determined by the Village Board, an engineering proposal in accordance with this section, and an erosion and sediment control plan and certification that such plan will be followed.
[1]
Maps. The applicant shall submit five copies of a map at a scale of one inch equals no more than 50 feet, showing all lands proposed for excavation and all land within 200 feet thereof, with exact locations of all buildings, streets, utilities, drainage or other easements, watercourses, lot lines, block and lot numbers and names of the landowners. Such map shall also show the present topography at two-foot contour intervals. The map shall be signed by a licensed engineer or land surveyor for certification of its accuracy.
[2]
The applicant shall also submit to the Planning Board five copies of the proposed plan of excavation at the same scale as above showing the proposed finished elevations at two-foot contour intervals and the proposed drainage plan.
[3]
The proposed finished grading plan shall show the land to be smooth-graded, the topsoil respread to a minimum depth of four inches and slopes no greater than 30%.
(8)
Monitoring, reports and inspections.
(a)
The Village shall periodically inspect the land disturbance activities to ensure compliance with the approved plan and to determine that the measures required in that plan are effective in controlling erosion. The right of entry to conduct such inspections shall be expressly reserved in the permit.
(b)
If the Village determines that the permit holder has failed to comply with the plan, the Code Enforcement Officer shall immediately serve upon the permit holder, by registered or certified mail, or by personal service or by posting on the property in a conspicuous place, a notice to comply. Such notice shall set forth specifically the measures needed to comply and shall specify the time within which such measures shall be completed. If the permit holder fails to comply within the time specified, he may be subject to the revocation of his permit; furthermore, he shall be deemed to be in violation of this chapter and, upon conviction, shall be subject to the revocation of his permit. The remedies as set forth above shall not be the exclusive remedy for a violation of this section, and the Village reserves the right to avail itself of any legal method of terminating activity violative of this provision.
(9)
A land disturbance permit shall be valid for one year from the date of approval but may be extended at the discretion and approval of the Planning Board for one additional period not to exceed one year.
F.
Tree preservation. The trees and forested lands in the Village of Hillburn are important natural resources that benefit the Village and make it a desirable place for both residents and visitors. Trees help to naturally control flooding, filter pollutants and prevent soil erosion, protect watersheds including the Ramapo Sole Source Aquifer, enhance air quality, provide a natural noise barrier, provide habitat for wildlife, and yield advantageous microclimates, thereby reducing energy consumption. The removal of trees can cause deprivation of these benefits and change the ecological and woodland character of the Village. Properly located and planted trees are an effective means of providing sight and noise barriers. Replacing trees removed during construction is necessary to assist in soil conservation and establishing and maintaining suitable and acceptable drainage, since development usually creates new drainage patterns, and the growth of trees and their roots are integral to these new drainage patterns and their stability.
(1)
For purposes of this section, a "regulated tree" is hereby defined as a tree with a diameter of eight inches or more measured at least four feet above ground level or trees planted by the Village of Hillburn pursuant to the shade tree regulations or planted pursuant to subdivision or other applicable regulations or ordinances or local laws. The moving, removal, poisoning, lopping, or otherwise irreversible and intentional damage of a regulated tree on any property shall be allowed only by issuance of a tree removal permit approved by the Planning Board, and subject to the provisions set forth herein.
(2)
Nothing herein shall be construed to permit clear-cutting or timber harvesting as a principal use within the Village of Hillburn. Said uses are prohibited.
(3)
Before a tree removal permit is issued, the applicant shall submit five copies of a tree plan to the Planning Board at a scale of one inch equals no more than 50 feet, or such scale approved by the Planning Board, showing the following:
(a)
The tree plan shall be included in the proposed development plans and shall include maps prepared with sufficient detail to illustrate the location and general characteristics of the existing vegetation before requested development and of revegetated areas after completion of the development as follows:
[1]
Detail the location of tree stands, rock outcroppings, stone walls, streams, lakes, ponds, wetlands and other water bodies, all regulated trees as defined herein, and all other natural features throughout the entire parcel(s) to be developed. Such map shall provide the existing topography at two-foot contour intervals. The map shall be signed by a licensed engineer or land surveyor for certification of its accuracy.
[2]
Delineate an envelope on each parcel(s) or portion of property anticipated to be disturbed, outside of which will be considered an area of nondisturbance by development and construction activities.
[3]
Detail, within the proposed area of disturbance, regulated trees as to general genus (i.e., oak, pine, etc.) and identify the number and species of individual trees having eight inches caliper at DBH.
(b)
All trees that are identified and described above that are proposed to be removed shall be clearly detailed on such map.
(c)
The tree plan shall demonstrate how required buffers, open space and trees to be saved will be protected during construction, whether with safety fencing or other approved alternative, the sequence of which is approved by the Planning Board.
(d)
The tree plan shall designate buffer zones of at least 15 feet along all perimeters of any regulated tree to be protected, as well as critical root zones around existing trees, where trees will not be removed or disturbed except as permitted herein.
(e)
All lands proposed for removal of regulated trees and all land within 200 feet thereof, with exact locations of all buildings, streets, utilities, drainage or other easements, watercourses, lot lines, block and lot numbers and names of the landowners.
(f)
The proposed finished elevations at two-foot contour intervals and the proposed drainage plan. The proposed finished grading plan shall show the land to be smooth-graded, the topsoil respread to a minimum depth of four inches and slopes no greater than 30°.
(4)
No approval shall be granted until the regulations implementing the New York State Environmental Quality Review Act have been complied with.
(5)
The Planning Board shall decide on the application within 62 days of receipt of a complete tree removal permit. The Planning Board may, as a condition of approval, require the replanting of trees of a specimen and size determined to be suitable to the property as mitigation.
(6)
The applicant shall be required to furnish a performance bond, cash escrow or other such arrangement as may be acceptable to the Planning Board, upon the advice of the Village Attorney and Village Engineer, to be sufficient to guarantee completion of the plan. Such security shall be released only upon certification by the Village Engineer that all requirements of this subsection have been complied with.
(7)
A tree removal permit issued for the removal of a regulated tree shall not exceed a period of one year from the date of approval, but such permit may be extended for an additional one year upon approval of the Planning Board.
(8)
One copy of the approved plan shall be returned to the applicant by the Village Clerk, together with the tree removal permit, upon the payment of a fee to be established by the Board of Trustees.
(9)
The following properties and uses shall be exempt from the provisions of this section:
(a)
Removal of a regulated tree incidental to highway or public utility construction or maintenance conducted by a state, county or local agency or a public utility company.
(b)
Issuance of a building permit, provided that the regulated tree is located within the area of disturbance within which the improvement is to be located. The applicant shall have obtained site plan approval or a land disturbance permit, as applicable.
(c)
Removal of a regulated tree from a parcel of property performed by the Village of Hillburn or a property owner where the Village has determined the tree is dead or poses imminent danger to the health, safety and welfare of any residence or street in the Village. A record of proof of such removal shall be on file at Village Hall.
(d)
Removal of a regulated tree by a developer pursuant to site or subdivision approval of the Planning Board or other approval issued by applicable section of the Village of Hillburn Code, provided said tree removal has been shown on said plans.
G.
Performance standards and prohibited uses.
(1)
Notwithstanding any other provision of this Zoning chapter, uses with the following characteristics are prohibited in all districts:
(a)
Any use which is noxious, offensive or objectionable by reason of the emission of smoke, dust, gas, odor or other form of air pollution; or by reason of the deposit, discharge or dispersal of liquid or solid wastes in any form, in any manner or amount, so as to cause permanent damage to the soil or any stream or to adversely affect the surrounding area; or by reason of the creation of noise, vibration, electromagnetic or other disturbance perceptible beyond the boundaries of the lot on which it is situated; or by reason of illumination by artificial light or light reflection beyond the limits of the lot on or from which such light reflection emanates; or which involves any dangerous fire, explosive, radioactive or other hazard; or which can cause injury, annoyance or disturbance to any of the surrounding properties or to their owners and occupants; and any other process or use which is unwholesome and noisome and may be dangerous or prejudicial to health, safety or the general welfare. See also Chapter 154, Noise, of the Code of the Village of Hillburn.
(2)
The following uses are prohibited in all Districts:
(a)
Open or partially enclosed storage of junk, refuse, paper, scrap metal, abandoned motor vehicles, and storage of unregistered vehicles.
(b)
The cooking, distillation, processing and incineration of animal products, including but not limited to food cannery plant, slaughterhouse, stockyards, fat rendering, soap manufacture, glue manufacture, tannery, paper manufacture, paint and varnish manufacture, creosote and creosote products manufacture.
(c)
The production of corrosive and noxious chemicals, including but not limited to acids, acetylene gas, ammonia, chlorine, and bleaching compounds.
(d)
The use of hammer mills, rolling mills or drop forges in any industrial process, and the testing or operation of jet engines and automotive screw machines.
(e)
The production, processing and storage of coal, coal tar, petroleum and asphalt products, including but not limited to coke manufacture, illuminating gas production, petroleum refining, bulk gasoline and petroleum storage, asphalt products, linoleum manufacture, oil cloth manufacture, and roofing material manufacture.
(f)
The extraction, preparation and processing of dust-producing mineral products, including but not limited to abrasive, lime, fertilizer, plaster, crushed stone, and stone-cutting products.
(g)
The smelting and reduction of metallic ores, including but not limited to blast furnace, open-hearth and electric furnace, and nonferrous metal smelting.
(h)
The manufacture and storage of explosive products, including but not limited to dynamite and commercial explosives, trinitrotoluene (TNT) and military explosives and fireworks.
(i)
Microwave receiving and transmitting towers.
(j)
Excavations, soil mining and quarrying as a principal use.
(k)
Automobile washing facilities.
(l)
Dumps, sanitary landfills, transfer stations, recycling facilities, construction and demolition dumps, resource-recovery facilities and junkyards, except those operated by the Village or when operated by an entity under contract with the Village to operate such a facility.
(m)
Trailer parks and mobile parks. Trailer parks and camps and mobile home parks are prohibited in all zoning districts.
This list is intended to be illustrative and not exhaustive. Any use which the Zoning Board of Appeals determines is similar in nature to the above uses and/or which meets the characteristics as described in Subsection (1)(a) above shall be a prohibited use. |
H.
Federal flood hazard area regulations. Within the Village of Hillburn there exist certain special flood hazard areas subject to periodic inundation which may result in loss of life and property, health and safety hazards, disruption of commerce and government services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare. Adherence to Chapter 130, Flood Damage Prevention, of the Village of Hillburn Code shall be a requirement of any building permit, or any approval granted by the Planning Board or variance issued by the Zoning Board of Appeals.
I.
Rockland County stream regulations.
(1)
Statement of purpose. Within the Village of Hillburn there exist certain streams shown on the Official Map of Rockland County, so designated to assist in the alleviation of recurring flood damage to public and private property and the prevention of danger to the public health and safety.
(2)
Authority. The Legislature of the State of New York enacted the Rockland County Stream Control Law under authority of Chapter 846 of the Laws of 1975, granting to the Rockland County Drainage Agency the authority to issue permits for the performance of any construction work, maintenance of any structure, maintenance of any channel obstruction or placing of any fills within streams or within 100 feet from such streams as defined by the Rockland County Drainage Agency or for changing the location, cross section, course or current of any stream which is shown on the Official Map of Rockland County.
(3)
Requirements in county streams. The Planning Board shall not approve any final site plan or final subdivision plat or special use permit for property under the jurisdiction of the Rockland County Drainage Agency until the requirements of that agency have been met.
J.
Environmental quality review.
(1)
Purpose. It is the purpose of the New York State Environmental Quality Review Act (SEQRA) to assure that consideration of environmental factors is incorporated into the planning and decisionmaking process at the earliest possible time. It is further the purpose of said regulations to assure that the procedure for such is consistent with the New York State Environmental Quality Review Act, as set forth in Article 8 of the Environmental Conservation Law. See also Chapter 105, Environmental Quality Review, of the Code of the Village of Hillburn.
(2)
K.
Environmental constraints. In order to limit development in areas with severe environmental limitations, the following regulations shall apply in all zoning districts. Development shall be situated so as to avoid being located on these features to the maximum extent.
(1)
Land under water: applicable prior to development. No portion of a parcel may be counted as part of any minimum lot area if subject to the following: ponds, locally designated wetlands; that portion of any stream under the jurisdiction of the Rockland County Drainage Agency; within the Federal Emergency Management Agency's designated 100-year floodplain; within an area subject to a management or land use plan under the "wild, scenic and recreational river" designation; that portion of any freshwater wetland so designated by the New York State Department of Environmental Conservation; and that portion of any freshwater wetland regulated by the U.S. Army Corps of Engineers.
(2)
(3)
Rock outcrops: applicable prior to development. Not more than 50% of the area of that portion of a parcel with rock outcrops in excess of 50 square feet in size may be counted as part of the minimum lot area of a parcel.
L.
Fences and walls.
(1)
Fences or walls surrounding any portion of a front yard shall not exceed four feet in height, except that, within 20 feet of a street line, the height shall not exceed 3 1/2 feet.
(2)
A solid fence not more than six feet in height is permitted other than in a front yard. A solid fence is any fence with a solid or nonpermeable or opaque area exceeding 75% of its total area (uniformly distributed). Existing rock walls that serve as fences are permitted.
(3)
Fences and walls shall have their finished decorative face directed to the abutting property. No supports, posts or bracing shall be placed on the side of the fence that faces any abutting lot, street, road or public right-of-way. No fence shall project beyond any property line.
(4)
Height. Fence height shall be measured from the natural grade along the base thereof. Where a fence is installed on top of a berm or retaining wall, the height shall be deemed to include the height of the underlying berm or wall. Fences shall be provided with a gate or other means of access to the enclosed space for emergency purposes.
(5)
Separation requirements. The minimum distance between a fence and a shared lot line shall be 18 inches unless it is established to the satisfaction of the Code Enforcement Officer that the fence is intended to be a common fence. In the case of a common fence, the Building Department may require proof of a recorded agreement between the contiguous lot owners to ensure future maintenance and repair of the common fence, including future owners.
(6)
Street right-of-way. All fencing must be contained within the confines of the owner's property, and at no time shall such fence be constructed upon lands of the Village. Access to municipal easements and right-of-way on any property shall be maintained and not obstructed without approval of the Village Board. The minimum distance between a fence and a municipal easement and/or right-of-way and/or municipally owned property line shall be five feet unless it is established to the satisfaction of the Code Enforcement Officer that a fence may be located closer than five feet without detriment to sight distance, easements, or other need for access. The Village Board may require a gate or other appropriate means to access any easement or right-of-way.
(7)
Prohibited materials. No person shall be permitted to erect or cause to be erected any barbed wire, razor, chain-link except with closed loop at the top, electrically charged, short pointed metal, poultry, turkey wire, or any similar type fence. A chain-link fence shall not be permitted within any front yard. Tarpaulin, canvas, cardboard and other impermanent materials are prohibited fence materials.
(8)
Preexisting noncompliance. Any fence legally in existence on the effective date of this Zoning chapter shall be permitted to remain, provided that such fence is maintained. At such time that the fence is removed, altered or reconstructed, any new fence shall conform to these provisions.
(9)
Corner lot exception. Upon approval of the Planning Board, a corner lot may be permitted to have a fence within one front yard. In said yard, it shall be installed at the required yard setback line.
(10)
Maintenance. Fences, walls and other minor constructions shall be maintained in safe, good and substantial condition and in sound structural condition.
M.
Corner lots. On a corner lot, each lot line which abuts a street shall be deemed to be a front lot line, and the required yard along both lot frontages shall be a required front yard. The applicant shall elect or so designate on the plan which of the remaining two required yards shall be the required side yard and the required rear yard unless said yards have been determined during subdivision plan review and approval.
