(a)
Water connections.
The following charges shall be made by the city for each and every water tap connection made to the city’s water mains:
1" (3/4" where applicable) service tap and meter | $850.00 |
2" service tap and meter | $1,750.00 |
1-1/2" service tap and meter (where applicable) | Actual cost |
Over 2" service tap, service line, meter and regulator | Actual cost |
(b)
Sewer connections.
The following charge shall be made by the city for each and every sewer connection made to the city’s sewer system: All sewer tap inspections: $10.00 each.
(1967 Code, sec. 29-25; Ordinance 914 adopted 5/17/99; Ordinance 994 adopted 10/18/04; Ordinance 1008 adopted 9/19/05; Ordinance 1136 adopted 9/8/15; Ordinance 1137 adopted 9/21/15; 2008 Code, sec. 74-172)