Annexation fees (voluntary): $500.00.
(Ordinance 2022-0426-03 adopted 4/26/22)
Temporary use permit
$315.00
Zoning change
$500.00, $50.00 5/acre
Planned unit development (PUD)
$2,500.00
PUD zoning change
$225.00
Conditional use
$325.00
(Ordinance 2022-0426-03 adopted 4/26/22)
 
Base
Per Lot
 
Preliminary plat
$1,350.00
$25.00
$20.00/acre
Final plat
$1,000.00
$25.00
 
Vacation of plat
$480.00
 
 
Replat of subdivision
$1,000.00 or 75% of preliminary plat
$25.00
 
Minor plat
$750.00
 
 
Administrative revisions
$750.00
$25.00
 
(Ordinance 2022-0426-03 adopted 4/26/22)
Engineering fee
Cost of service or $250.00, whichever is greater
(Ordinance 2022-0426-03 adopted 4/26/22)
 
Base
Additional Fees
Site plan review
$1,000.00
$75.00 per acre
Minor deviations/design
$240.00
 
Conditional certificate of completion
$240.00
 
(Ordinance 2022-0426-03 adopted 4/26/22)
 
Base
Additional fees
Residential
$74.75
 
Commercial
 
 
1–10,000 sq. ft.
$1,000.00
 
10,001–30,000 sq. ft.
$2,500.00
 
30,001–50,000 sq. ft.
$8,000.00
 
Above 50,001 sq. ft.
$19,000.00
$0.50 per each 10,000 sq. ft.
(Ordinance 2022-0426-03 adopted 4/26/22)
Residential
Base $75.00 + $0.40 per sq. ft.
Commercial
Base $1,200.00 + $0.50 per sq. ft.
(Ordinance 2022-0426-03 adopted 4/26/22)
Move-in permit
$120.00
Demolition
$60.00
Above-ground pool (with pump) + inspections
$60.00
In-ground pool + inspections
$120.00
Mobile food establishments (MFE) permit
$275.00
Miscellaneous permit*
$110.00
(Ordinance 2022-0426-03 adopted 4/26/22)
New construction
$74.75
Reinspection
$74.75
Engineering inspection
3% of total permit fee
(Ordinance 2022-0426-03 adopted 4/26/22)
Application fee – signs
$75.00
Signs (building or freestanding)
$5.00 per sq. ft.
Sign variance – approved per sq. ft.
$10.00
Commercial banner
$75.00
(Ordinance 2022-0426-03 adopted 4/26/22)
Cost of meter + 10%
(Ordinance 2022-0426-03 adopted 4/26/22)
($2,000.00 x LUE factor = Fee)
Residential Service w/ 5/8" meters
LUE Factor
Single-family residential
1
Two-family residential
1.8
Three-family residential
2.4
Nonresidential Services and Residential Services with meters greater than 5/8"
Meter Size (inch)
Type
LUE Factor
5/8"
Positive displacement
1
3/4"
Positive displacement
1.5
1"
Positive displacement
2.5
1-1/2"
Positive displacement
5
2"
Positive displacement
8
2"
Compound
8
2"
Turbine
10
3"
Compound
16
3"
Turbine
24
4"
Compound
25
4"
Turbine
42
6"
Compound
50
6"
Turbine
92
8"
Compound
80
8"
Turbine
160
10"
Compound
115
10"
Turbine
250
12"
Turbine
330
Additional fees may apply.
(Ordinance 2020-0225-03 adopted 2/25/20)
($2,000.00 x LUE factor = Fee)
Residential Service w/ 5/8" meters
LUE Factor
Single-family residential
1
Two-family residential
1.8
Three-family residential
2.4
Nonresidential Services and Residential Services with meters greater than 5/8"
Meter Size (inch)
Type
LUE Factor
5/8"
Positive displacement
1
3/4"
Positive displacement
1.5
1"
Positive displacement
2.5
1-1/2"
Positive displacement
5
2"
Positive displacement
8
2"
Compound
8
2"
Turbine
10
3"
Compound
16
3"
Turbine
24
4"
Compound
25
4"
Turbine
42
6"
Compound
50
6"
Turbine
92
8"
Compound
80
8"
Turbine
160
10"
Compound
115
10"
Turbine
250
12"
Turbine
330
Additional fees may apply.
(Ordinance 2020-0225-03 adopted 2/25/20)
Owner’s/Operators Permit
(sexually oriented business license)
Original
$3,000.00
First renewal
$2,250.00
Second renewal
$1,500.00
Third and subsequent renewals
$750.00
Employee License
Original
$300.00
First renewal
$250.00
Second and subsequent renewals
$100.00
(Ordinance 2020-0225-03 adopted 2/25/20)
Permits
$12.00 per permit
Policy, development, and subdivision applications
7% of the total calculated fee
(Ordinance 2021-1207-07 adopted 12/7/21)
Discovery fee
$100.00
Development agreement fee
$1,500.00
Utility agreement fee
$600.00
SPA fee
$600.00
(Ordinance 2022-0426-03 adopted 4/26/22)