All requests for use of streets, alleys, and thoroughfares to
support a private or commercial activity, which will require the roadway
to be changed, cut, or damaged in any way, or to bore under the roadway,
must be approved by the city council before any action may be started.
(Ordinance 2002-003, sec. 1, adopted 2/19/02)
Bore.
A technique to drill a passageway below the surface of a
roadway so the surface is undisturbed and its functional support is
not affected.
Change.
To construct, extend and maintain in, along, under and across
the present and future streets, alleys, highways and public grounds
and ways.
Cut.
To cut the roadway in such a fashion that the original material
is separated and is open to weather factors, and vehicle travel wear-and-tear
that will destroy the road surface quicker than the original surface
condition would allow.
Damage.
To change the surface of the original road material in such
a fashion that its support of vehicle traffic is impaired or degraded
and the roadway will degrade quicker than the original surface condition
would allow.
Public roadway.
Any present or future street, alley, highway, public grounds
and ways, and thoroughfares.
(Ordinance 2002-003, sec. 2, adopted 2/19/02)
(a) Application.
(1) Approval to do any work that will affect (change, cut, damage, or
bore under) a public roadway will require an application for a permit
from the city.
(2) The mayor will sign all approved permits.
(b) Consideration.
(1) All permit requests to be considered at the next regular city council
meeting must be received by the first Tuesday of a month.
(2) Permit requests that require consideration before the next regular
meeting must be submitted with a full explanation to the urgency of
the work, and how delay will damage the project. The mayor will make
the final decision for when the request will be considered.
(Ordinance 2002-003, sec. 3, adopted 2/19/02)
(a) Repair.
All roadways cut or damaged will be repaired
with similar materials and workmanship to the original surface.
(b) Return.
All repair of roadways will return the surface
to a condition that is the same as or better than the original surface
state.
(Ordinance 2002-003, sec. 4, adopted 2/19/02)
(a) City responsibility.
The city council will be responsible
for approving all work that will change, damage, or bore under, any
public roadway. The city will maintain records of all work performed
under public roadways and will provide appropriate information, upon
request, when any work is being considered and a permit applied for
to gain approval to do the work.
(b) Liability.
Although the city may approve private or
commercial work to be performed under a public roadway, the city accepts
no liability for future work that may rupture this private or commercial
service. Contractor accepts all liability to repair, alt-route, or
replace any damaged material due to future work. Any public work,
or work performed on behalf of the public, will be accomplished with
normal care, caution, and diligence. Every normal attempt will be
made to avoid damage to a private or commercial pipe or line, but
the contractor/owner retains responsibility for repair of damage.
(Ordinance 2002-003, sec. 5, adopted 2/19/02)
A new permit is required under the following conditions:
(2) Adding to action first approved;
(3) Converting from one method to another; or
(4) Increasing the area to be affected.
(Ordinance 2002-003, sec. 5, adopted 2/19/02)
(a) Fee.
(1) A road-cut request fee is $100.00.
(2) A road-bore request fee is $50.00.
(b) Payment.
All fees shall accompany a request for permit
at the time of application.
(c) Refund.
(1) A full refund shall be issued within five (5) days if a request is
denied.
(2) A full refund shall be issued when a request is to be held pending
action for more than forty-five days (45).
(Ordinance 2002-003, sec. 6, adopted 2/19/02)