Drilling and production site conditional use permit: $10,000.00
per pad site + $3.00 per notification.
(Ordinance 2011-12-6D, sec. 2.04,
adopted 12/6/11)
(a) Well
permit: $10,000.00 per well + $3.00 per notification.
(b) Annual
well inspection: $5,000.00 per well, annually.
(c) Amended
well permit: $7,500.00 per well + $3.00 per notification.
(d) Amended
well permit inspection fee: $2,000.00 per well.
(e) Permit
transfer fee: $1,000.00 per well permit.
(Ordinance 2011-12-6D, sec. 2.04,
adopted 12/6/11)
(a) Regulated
pipeline permit: $5,000.00 per regulated pipeline.
(b) Unregulated
pipeline permit: $3,000.00 per unregulated pipeline.
(Ordinance 2011-12-6D, sec. 2.04,
adopted 12/6/11)
(a) Seismic
survey permit: $500.00 per survey.
(b) Oil
and gas insurance requirements review fee: $1,500.00.
(c) Revolving
account for each drilling and production site: $50,000.00 minimum
balance.
(d) Appeal
and takings determination application fees: $1,000.00 per request
+ $3.00 per notification.
(e) Road
damage fees shall be assessed based on the conditions of the road
repair agreement previously executed by the town and the applicant.
(Ordinance 2011-12-6D, sec. 2.04,
adopted 12/6/11)