[Amended 8-23-2022 by Ord. No. 5739]
A.
Purpose. The purpose of this district is to permit the development of multifamily residential and professional office uses in close proximity to Union Station and Kean University to encourage land use compatibility, provide the opportunity for the development of supportive land uses around Union Station and to address the Township's affordable housing unmet need obligation. The MUOD District promotes affordable residential development opportunities in close proximity to the train station or other mixed-use areas along Morris Avenue.
B.
Location; requirements.
(1)
Location. The Mixed-Use Overlay District consists of the following tax parcels: Block 512, Lot 2.01, Block 606, Lots 4, 5, and 8, and Block 4401, Lot 1.
(2)
Use standards. Refer to the Schedule of Limitations (Attachment 4) for use standards.
(a)
Recreational/social amenities. Developments shall be required to include both interior and exterior common areas devoted to recreational, social and similar functions for residents and their guests, as set forth below:
[1]
At least 40 square feet per dwelling unit shall be devoted to interior common areas, such as but not limited to meeting rooms, community centers, fitness centers, indoor recreational areas, lounges, libraries, etc. Areas such as hallways, stairs, elevators, entrance lobbies, storage, mail areas, mechanical space or office space and similar areas shall not count towards meeting this requirement.
[2]
At least 40 square feet per dwelling unit shall be devoted to exterior common areas, such as but not limited to recreational areas, gardens, courtyards, plazas, decks, patios, etc. Such areas may be located at grade level, on building terraces or on the roof of the building. Lawn and landscaped areas shall not count towards meeting this requirement unless such areas are specifically designed to be part of the aforementioned features.
(3)
Performance standards.
(a)
There must exist approved public water and public sewer systems which shall be available to each unit prior to the issuance of the building permit for that unit.
(c)
For developments to be constructed over a period of years, a phasing plan shall be submitted as part of the preliminary plan for the entire concept.
C.
Area bulk and dimensional regulations. Refer to Schedule of Zoning Requirements (Attachment 5) for area, yard and bulk standards.