The following items shall be included in the SWM site plan:
A. Appropriate sections from the Subdivision and Land Development Ordinance, and other applicable local ordinances, shall be followed
in preparing the SWM site plans.
B. The municipality shall not approve any SWM site plan that is deficient
in meeting the requirements of this chapter. At its sole discretion
and in accordance with this article, when a SWM site plan is found
to be deficient, the municipality may either disapprove the submission
and require a resubmission, or in the case of minor deficiencies,
the municipality may accept submission of modifications.
C. Provisions for permanent access or maintenance easements for all physical SWM BMPs, such as ponds and infiltration structures, as necessary to implement the operation and maintenance (O&M) plan discussed in §
125-401E(9).
D. The following signature blocks:
(1)
A statement, signed by the Township Engineer, that the SWM site
plan complies with the Township Stormwater Management Ordinance (this
chapter), as follows:
"I, (Township Engineer), on this date
(Signature Date), has reviewed and hereby certifies
that the SWM site plan meets all design standards and criteria of
the Londonderry Township Stormwater Management Ordinance."
(2)
A statement, signed by all landowners, acknowledging that the
stormwater BMPs are fixtures that cannot be altered or removed without
prior approval by the Township.
"Acknowledgment of Permanence of BMPs:
|
I/we, the undersigned landowners, hereby represent that no person
shall modify, remove, fill, landscape, or alter any Stormwater Management
BMPs, facilities, areas, or structures without the written approval
of Londonderry Township.
|
__________
|
__________
|
Date
|
Landowner(s)"
|
(3)
A statement, signed by all landowners, referencing the operation
and maintenance (O&M) agreement and stating that the O&M agreement
is part of the stormwater management site plan, as follows:
I/we, the undersigned landowners, hereby acknowledge that an
operation and maintenance agreement has been entered into with the
Township and shall be part of the stormwater management site plan.
|
__________
|
__________
|
Date
|
Landowner(s)
|
(4)
The following signature block for the qualified professional
preparing the stormwater management plan:
"I __________________, hereby certify that the stormwater management
site plan meets all design standards and criteria of the Londonderry
Township Stormwater Management Ordinance.
|
_____
|
__________
|
Date
|
Qualified Professional Signature"
|
E. The SWM site plan shall provide the following information:
(1)
Maps or plan sheets. Map(s) or plan sheets of the site shall be submitted on minimum twenty-four-inch by thirty-six-inch sheets and shall be prepared in a form that meets the requirements for recording at the Chester County Office of the Recorder of Deeds and the requirements of the operation and maintenance (O&M) plan and O&M agreement (Article
V). If the SALDO has additional or more stringent criteria than this chapter, then the SALDO criteria shall also apply. Unless otherwise approved by the Municipal Engineer, the contents of the maps or plan sheets shall include, but not be limited to:
(a)
A listing of all regulatory approvals required for the proposed
project and the status of the review and approval process for each.
Final approval or adequacy letters must be submitted to the municipality
prior to (or as a condition of) the municipality's issuing final
approval of the SWM site plan. Proof of application or documentation
of required permit(s) or approvals for the programs listed below shall
be part of the SWM site plan, if applicable:
[1]
NPDES permit for stormwater discharges associated with construction
activities;
[2]
PADEP permits as needed:
[a] PADEP joint permit application;
[b] Chapter 105 (Dam Safety and Waterway Management);
[c] Chapter 106 (Floodplain Management);
(b)
PennDOT highway occupancy permit;
(c)
Erosion and sediment control plan letter of adequacy; and
(d)
Any other permit under applicable state or federal regulations.
(2)
A location map, with a scale of one inch equals 2,000 feet or
greater, showing the site location relative to highways, municipal
boundaries, or other identifiable landmarks.
(3)
The name of the project, tax parcel number(s), and the names,
addresses and phone numbers of the owner of the property, the applicant,
and firm preparing the plan.
(4)
Signature and seal of the qualified professional(s) responsible
for preparation of the maps and plan sheets.
(5)
The date of SWM site plan submission and revision dates, as
applicable.
(6)
A graphic and written scale of one inch equals no more than
50 feet.
(8)
Legal property boundaries, including:
(a)
The total project property boundary and size with distances
marked to the nearest foot and bearings to the nearest degree.
(b)
Boundaries, size and description of purpose of all existing
easements and deed-restricted areas of the project property, with
distances marked to the nearest foot and bearings to the nearest degree.
(9)
Existing natural resources and natural or man-made hydrologic
features that are located within the site or receiving discharge from,
or that may otherwise be impacted by, the proposed regulated activity,
including but not limited to:
(a)
All existing natural resources, hydrologic features and drainage
patterns including natural waterways, water bodies, wetlands, streams
(intermittent and perennial), ponds, lakes, vernal pools, etc., natural
infiltration areas and patterns, areas of significant natural evapotranspiration,
and other water features and aquatic resources.
(b)
Any existing man-made drainage features, BMPs, conveyances,
facilities, open channels, swales, drainage patterns, or other flood,
stormwater or drainage control features.
(c)
For the site, discharge points and locations of concentrated
flows and their drainage areas.
(d)
For named waters, show names and their watershed boundaries
within the site.
(f)
For the water bodies, streams and wetlands identified in §
125-401E(9)(a), label or otherwise show the following attributes, if applicable:
[1]
The designated use as determined by PADEP (25 Pa. Code Chapter
93);
[2]
Impairments listed on the PADEP "Integrated List" (as updated)
and the listed source and cause of impairment;
[3]
Name, date, and target pollutant(s) for any approved total maximum
daily load (TMDL); and
[4]
Drainages to water supply reservoirs.
(g)
Areas that are part of the Pennsylvania Natural Diversity Inventory
(PNDI) and a list of potential impacts and clearances received (for
regulated activities involving one acre or more proposed earth disturbance).
(h)
Woods, vegetated riparian buffers and other areas of natural
vegetation.
(i)
Topography using contours (with elevations based on established
bench marks) at intervals of two feet. In areas of slopes greater
than 15%, five-foot contour intervals may be used. The datum used
and the location, elevation and datum of any bench marks used shall
be shown.
(j)
Areas classified by the municipality as steep slopes.
(k)
Soil names and boundaries, general type of soils with hydrologic
soil group noted, and in particular note areas most conducive to infiltration
BMPs, such as groups A and B, etc., estimated permeabilities in inches
per hour, and location and other results of all soil tests and borings.
(l)
If present, areas with underlying carbonate geologic units,
existing sinkholes, subsidence or other karst features, and any associated
groundwater recharge areas with increased vulnerability to contamination.
(m)
Any contaminated surface or subsurface areas of the site.
(n)
Water supply wells:
[1]
Location of existing well(s) on the project property and delineation
of the(ir) recharge area(s) (if known), or a fifty-foot diameter assumed
recharge area;
[2]
Location of existing well(s) within 50 feet beyond the boundary
of the project property boundary (if public water supply is proposed
for the regulated activity); and
(o)
Current FEMA 100-year floodplain boundaries, elevations, and
floodway boundaries for any special flood hazard areas on or within
100 feet of the property.
Four copies of the SWM site plan shall be submitted as follows:
A. One physical and electronic copy to the municipality.
B. One physical and electronic copy to the Municipal Engineer.
C. One copy to the Chester County Conservation District (when applicable).
D. One copy to the Chester County Planning Commission (when applicable).
A modification to a submitted SWM site plan that involves a
change in SWM BMPs or techniques, or that involves the relocation
or redesign of SWM BMPs, or that is necessary because soil or other
conditions are not as stated on the SWM site plan as determined by
the municipality, shall require a resubmission of the modified SWM
site plan in accordance with this chapter.
A disapproved SWM site plan may be resubmitted, with the revisions
addressing the reasons for the municipality's prior disapproval,
to the municipality in accordance with this article. The applicable
review fee must accompany a resubmission of a disapproved SWM site
plan.
The municipality's approval of a SWM site plan authorizes the regulated activities contained in the SWM site plan for a maximum term of validity of five years following the date of approval. The municipality may specify a term of validity shorter than five years in the approval for any specific SWM site plan and such shorter term of validity shall be noted, in writing, to applicant as a condition of plan approval; provided, however, that if not so noted, the term of validity shall be five years. Terms of validity shall commence on the date the municipality signs the approved SWM site plan. If an approved SWM site plan is not completed within the term of validity, then the municipality may deem the SWM site plan disapproved and revoke any and all permits. SWM site plans that are considered disapproved by the municipality shall be resubmitted in accordance with §
125-405 of this chapter, and the applicant shall be prohibited from conducting any regulated activity until a newly approved plan is obtained.