Stormwater management controls and facilities as defined here
include all structural and nonstructural stormwater conveyance and
management controls including water quantity and quality, best management
practices.
The developer shall provide a financial guarantee to the municipality
for the timely installation and proper construction of all stormwater
management controls as required by the approved stormwater management
plan and this chapter equal to 110% of the construction cost of the
required controls.