A.
Zoning clearance shall be required prior to the issuing of building permits, and shall be issued by the persons designated by the City Administrator as "Planning Director or designee," after it has been determined that any proposed construction is in conformity with the regulations set forth in this title and applicable sections of the General Plan.
B.
Zoning clearance shall consist of a stamp of approval and a signature of the Planning Director or designee, along with appropriate notes placed upon all copies of the applicant's plot plan, which are required for application for a building permit. No building permit shall be issued until the plot plan has been approved and stamped by the Director or designee.
C.
The Planning Director or designee shall not accept and approve plot plans which do not contain all information needed to clearly indicate the proposed construction, its use and its exact placement on the property, and a legal description sufficient to locate the property on the City's zoning map and County's Assessor's Parcel Map.
D.
A fee set by resolution shall accompany the application.
(Ord. 189 Art. 5 §1(A), 1980; Ord. 206 §1, 1981; Ord. 2018-476 §2)