Unless the context otherwise dictates, the following words and
phrases shall have the meaning hereinafter set forth:
"Customer-generator"
means a customer who utilizes solar, wind, or solar/wind
hybrid electric generation, where the generation is located on the
customer premises, to offset no more than 100 percent of the customer's
annual electrical load, meeting Rule 21, city policies and state laws
and regulations.
"KVA"
means kilovolt-ampere.
"kWh"
means kilowatt hour.
"Roseville electric"
means the city's electric department, where authority for
actions and approvals specified in this chapter is vested with the
electric utility director.
"Service"
means the service provided by the city to a customer related
to and including the supply, transformation, transmission and/or distribution
of electricity.
"System"
means the network of electrical equipment owned and operated
by the city used to deliver electrical energy to various locations.
Words and phrases having technical meanings, commonly understood
by those persons familiar with the sale, distribution and handling
of electrical energy shall have the same meanings as are generally
given such words and phrases by such persons.
|
(Prior code § 8.30; Ord. 1299 § 1, 1975; Ord.
3381 § 1, 1999; Ord. 3430 § 3, 1999; Ord. 4792 §
1, 2009; Ord. 5266 § 1, 2013)
Rate classifications for sale of service to customers are as
follows:
A. The
residential rate is the rate charged for service to customers in single-family
and multiple-family dwellings for noncommercial use.
B. The
general service rates are the rates charged for service to customers
engaged in all general service non-residential activities, whether
commercial or noncommercial in nature, and the general service rate
classifications are described as follows:
1. Small
General Service (GS-1). The GS-1 rate applies to service to customers
with metered monthly energy usage less than 8,000 kWh and with metered
demand not exceeding 20 kW in a monthly billing period for six or
more separate monthly billing periods in the prior calendar year.
2. Medium
General Service (GS-2). The GS-2 rate applies to customers with metered
monthly energy usage greater than 8,000 kWh or with metered demand
greater than 20 kW during six or more monthly billing periods in the
prior calendar year, and not greater than 500 kW in six or more separate
monthly billing periods in the prior calendar year.
3. Large
General Service (GS-3). The GS-3 rate applies to customers with metered
demand greater than 500 kW during six or more monthly billing periods
in the prior calendar year, and not greater than 1,000 kW in six or
more separate monthly billing periods in the prior calendar year.
4. Very
Large General Service (GS-4). The GS-4 rate applies to customers with
metered demand greater than 1,000 kW during six or more monthly billing
periods in the prior calendar year.
C. Solar,
Wind, and/or Solar/Wind Hybrid Net Metering Rates. These rates shall
apply to all eligible solar, wind, and/or solar/wind hybrid electric
generation interconnected in parallel to the city distribution system,
meeting all of Roseville Electric's Rule 21 terms and conditions.
Failure to satisfy Roseville Electric's Rule 21 terms and conditions
will result in the solar, wind, and/or solar/wind hybrid electric
generation being deemed ineligible for these rates and may cause the
solar, wind, and/or solar/wind hybrid electric generation to be prevented
from parallel operation by Roseville Electric. Net metering rates
are available on a first come, first served basis until that time
when the total installed solar, wind, and/or solar/wind hybrid electric
generation net metered generating capacity within the Roseville Electric
service territory exceeds the maximum installed kW amount allowable
as established by the city pursuant to its policies and state laws.
1. Net
Metering Rate 1 (NM-1). The NM-1 rate applies to eligible residential
customer-generators and small nonresidential solar customer-generators
with a maximum annual demand (kW) of 10 kW or less. The NM-1 rate
is available to customers until the total customer net meter installations
exceed a five percent capacity cap, as stated herein. Roseville Electric's
five percent capacity cap will be reached when the total kilowatt
(kW) demand of customer installed net meter installations reach five
percent of Roseville Electric's distribution system historical peak
demand. Effective October 1, 2018, the NM-1 rate will be closed to
new customers without an active solar building permit.
a. NM-1 Transition Period. Customers eligible for the NM-1 rate shall
remain on the NM-1 rate until October 1, 2028, or through a period
of 20 years from the last date of interconnection of the eligible
renewable energy generation facility, whichever is later. After the
NM-1 rate is closed, existing NM-1 customers can expand their existing
system by up to 10 percent and remain on the NM-1 rate.
2. Standard
Net Metering. Nonresidential customer-generators with a maximum annual
demand greater than 10 kW are not eligible for the NM-1 rate. These
customer-generators default to the standard net metering procedures
as outlined in the Municipal Code and Roseville Electric Rule 21.
Standard net metering is available to customers until the total customer
net meter installations exceed a five percent capacity cap, as stated
herein. Roseville Electric's five percent capacity cap will be reached
when the total kilowatt (kW) demand of customer installed net meter
installations reach five percent of Roseville Electric's distribution
system historical peak demand. Effective October 1, 2018, the standard
net metering rate will be closed to new customers without an active
solar building permit.
a. Standard Net Metering Transition Period. Customers eligible for standard
net metering shall remain on the standard net metering rate until
October 1, 2028 or through a period of 20 years from the last date
of interconnection of the eligible renewable energy generation facility,
whichever is later. After the standard net metering rate is closed,
existing standard net metering customers can expand their existing
system by up to 10 percent and remain on the standard net metering
rate.
3. Roseville
solar 2.0 rate (RS-2) is applicable to customer-generators with eligible
renewable generation such as solar, wind, and/or solar/wind hybrid
electric system interconnections of less than one megawatt (1 MW)
once the NM-1 rate and standard net metering are closed to new customers
as noted above.
D. The
outdoor lighting rate is the rate charged to customers for service
provided to unmetered outdoor lighting facilities, other than facilities
for lighting of public streets.
E. The
street lighting rate is the rate charged to customers for service
provided to unmetered city-owned lights for lighting public streets.
F. The
traffic signal rate is the rate charged to customers for service provided
to all city-owned traffic signals and associated equipment.
G. Determination
of the applicable rate classification as described herein for new
customers will be determined by Roseville Electric in accordance with
generally accepted engineering standards.
(Prior code § 8.31; Ord. 1299 § 1, 1975; Ord.
1620 § 1, 1982; Ord. 2411 § 1, 1991; Ord. 2710 §
1, 1993; Ord. 4792 § 1, 2009; Ord. 4898 § 2, 2010; Ord. 5872 § 1, 2017)
Time of use billing seasons and daily periods are defined as
follows:
Winter
(Bills with meter read dates October through May)
|
Off Peak
|
10:00 p.m. to 7:00 a.m. Monday through Friday (except holidays)
and all day Saturday, Sunday, and holidays
|
On Peak
|
7:00 a.m. to 4:00 p.m. and 7:00 p.m. to 10:00 p.m. Monday through
Friday (except holidays)
|
Super Peak
|
4:00 p.m. to 7:00 p.m. Monday through Friday (except holidays)
when the winter super peak rate is identical to the winter on peak
rate
|
Summer
(Bills with meter read dates June through September)
|
Off Peak
|
10:00 p.m. to 7:00 a.m. Monday through Friday (except holidays)
and all day Saturday, Sunday and holidays
|
On Peak
|
7:00 a.m. to 4:00 p.m. and 7:00 p.m. to 10:00 p.m. Monday through
Friday (except holidays)
|
Super Peak
|
4:00 p.m. to 7:00 p.m. Monday through Friday (except holidays)
|
Holidays are defined as New Year's Day, Martin Luther King Day,
Presidents' Day, Memorial Day, Labor Day, Columbus Day, Veterans'
Day, Thanksgiving Day, and Christmas Day.
(Ord. 2411 § 2, 1991; Ord. 2577 § 1, 1992; Ord. 2710 § 1, 1993; Ord. 3381 § 1, 1999; Ord.
4527 § 1, 2007; Ord. 4792 § 1, 2009; Ord. 5589 §
1, 2015)
A. Effective June 1, 2024, the residential rate applied to service within
a monthly billing period and charged to residential customers shall
be as follows:
1.
For each residential customer meter:
a.
Basic service charge: a basic service charge of $30.00 per meter,
per billing month.
b.
Energy charge applied to electricity consumption in kWh in accordance
with the following tiers:
i.
Tier 1—Up to 500 kWh: $0.1176 per kWh;
ii.
Tier 2—Greater than 500 kWh: $0.1568 per kWh.
c.
California renewable energy requirement surcharge: $0.0056 per
kWh.
d.
California greenhouse gas emission reduction requirement surcharge:
$0.0002 per kWh.
e.
Hydroelectric adjustment: the annually adjusted charge or credit on residential billings that will be applied from July 1 to June 30 each fiscal year, as provided in Section
14.24.052 of this chapter.
f.
Energy cost surcharge: effective February 1, 2023 to December
31, 2024 an energy cost surcharge of $0.01354 per kWh on residential
metered energy. The energy cost surcharge is not applicable to senior
citizen rate reduction, low-income rate reduction, and medical support
rate reduction customers.
B. Effective January 1, 2025, the residential rate applied to service
within a monthly billing period and charged to residential customers
shall be as follows:
1.
For each residential customer meter:
a.
Basic service charge: a basic service charge of $30.00 per meter,
per billing month.
b.
Energy charge applied to electricity consumption in kWh:
i.
Tier 1—Up to 500 kWh: $0.1469 per kWh;
ii.
Tier 2—Greater than 500 kWh: $0.1912 per kWh.
c.
California renewable energy requirement surcharge: $0.0056 per
kWh.
d.
California greenhouse gas emission reduction requirement surcharge:
$0.0002 per kWh.
e.
Hydroelectric adjustment: the annually adjusted charge or credit on residential billings that will be applied from July 1 to June 30 each fiscal year, as provided in Section
14.24.052 of this chapter.
(Prior code § 8.34; Ord. 1229 § 1, 1975; Ord.
1338 § 1, 1976; Ord. 1408 § 1, 1978; Ord. 1507 §
1, 1980; Ord. 1655 § 1, 1982; Ord. 1707 § 1, 1983; Ord. 1764 § 1, 1984; Ord. 1813 § 1, 1984; Ord.
1911 § 1, 1985; Ord. 1984 § 1, 1986; Ord. 2296 §
1, 1990; Ord. 2411 § 1, 1991; Ord. 2577 § 1, 1992; Ord. 2710 § 1, 1993; Ord. 2995 § 1, 1996; Ord.
3075 § 1, 1997; Ord. 3091 § 1, 1997; Ord. 3381 §
1, 1999; Ord. 3552 § 1, 2000; Ord. 3588 § 1, 2000; Ord. 3637 § 1; Ord.
3702 § 1, 2001; Ord. 3731 § 1, 2001; Ord. 3749 §
1, 2001; Ord. 4007 § 2, 2003; Ord. 4181 § 1, 2005; Ord. 4397 § 1, 2006; Ord. 4605 § 2, 2008; Ord.
4725 § 1, 2009; Ord. 4792 § 1, 2009; Ord. 5166 §
1, 2013; Ord. 5589 § 2, 2015; Ord. 6415 § 1, 2021; Ord. 6592 § 1, 2022; Ord. No. 6820, 6/5/2024)
A. Effective June 1, 2024, the general service rates applied to service
within a monthly billing period and charged to general service customers
shall be as follows:
1.
Small General Services (GS-1) Rate. The GS-1 monthly rates on
monthly billings will be as follows:
Basic Service Charge
|
$44.00 per meter, per month
|
Energy Charge
|
Winter
|
$0.1150 per kWh
|
Summer
|
$0.1330 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
Energy Cost Surcharge
|
Effective February 1, 2023 to December 31, 2024 an energy cost
surcharge of $0.01235 per kWh
|
2.
Medium General Service (GS-2) Rate. The GS-2 monthly rates on
monthly billings will be as follows:
Basic Service Charge
|
$65.00 per meter, per month
|
Demand Charge
|
$6.16 per kW
|
Energy Charge
|
Winter
|
$0.1186 per kWh
|
Summer
|
$0.1427 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
Energy Cost Surcharge
|
Effective February 1, 2023 to December 31, 2024 an energy cost
surcharge of $0.01143 per kWh
|
3.
Large General Service (GS-3) Rate. TOU rates are mandatory for all customers receiving service in the GS-3 rate classification. Customers not having the necessary equipment to meter consumption on a TOU basis will be charged at the GS-2 rate until the necessary equipment is installed. Customers with facilities where the necessary TOU equipment is infeasible or impractical to employ, as determined by Roseville Electric, will be billed at the GS-2 rate. Discounts for primary services are provided pursuant to Section
14.24.050(D).
The GS-3 monthly rates on monthly billings will be as follows:
Basic Service Charge
|
$561.00 per meter, per month
|
Demand Charge
|
Winter
|
$6.60 per kW
|
Summer
|
$11.57 per kW
|
Energy Charge
|
Winter
|
Off Peak
|
$0.0801 per kWh
|
On Peak
|
$0.1045 per kWh
|
Super Peak
|
$0.1045 per kWh
|
Summer
|
Off Peak
|
$0.1045 per kWh
|
On Peak
|
$0.1287 per kWh
|
Super Peak
|
$0.1652 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
Energy Cost Surcharge
|
Effective February 1, 2023 to December 31, 2024 an energy cost
surcharge of $0.00992 per kWh
|
4.
Very Large General Service (GS-4) Rate. TOU rates are mandatory for all customers receiving service in the GS-4 rate classification. Discounts for primary services are defined in Section
14.24.050(D).
The GS-4 TOU monthly rates on monthly billings will be as follows:
Basic Service Charge
|
$641.00 per meter, per month
|
Demand Charge
|
Winter
|
$6.71 per kW
|
Summer
|
$11.51 per kW
|
Energy Charge
|
Winter
|
Off Peak
|
$0.0789 per kWh
|
On Peak
|
$0.1009 per kWh
|
Super Peak
|
$0.1009 per kWh
|
Summer
|
Off Peak
|
$0.1028 per kWh
|
On Peak
|
$0.1249 per kWh
|
Super Peak
|
$0.1635 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
Energy Cost Surcharge
|
Effective February 1, 2023 to December 31, 2024 an energy cost
surcharge of $0.00843 per kWh
|
B. Effective January 1, 2025, the general service rates applied to service
within a monthly billing period and charged to general service customers
shall be as follows:
1.
Small General Service (GS-1) Rate. The GS-1 monthly rates on
monthly billings will be as follows:
Basic Service Charge
|
$44.00 per meter, per month
|
Energy Charge
|
Winter
|
$0.1422 per kWh
|
Summer
|
$0.1642 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
2.
Medium General Service (GS-2) Rate. The GS-2 monthly rates on
monthly billings will be as follows:
Basic Service Charge
|
$65.00 per meter, per month
|
Demand Charge
|
$6.16 per kW
|
Energy Charge
|
Winter
|
$0.1433 per kWh
|
Summer
|
$0.1724 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
3.
Large General Service (GS-3) Rate. TOU rates are mandatory for all customers receiving service in the GS-3 rate classification. Customers not having the necessary equipment to meter consumption on a TOU basis will be charged at the GS-2 rate until the necessary equipment is installed. Customers with facilities where the necessary TOU equipment is infeasible or impractical to employ, as determined by Roseville Electric, will be billed at the GS-2 rate. Discounts for primary services are provided pursuant to Section
14.24.050(D).
The GS-3 monthly rates on monthly billings will be as follows:
Basic Service Charge
|
$561.00 per meter, per month
|
Demand Charge
|
Winter
|
$6.60 per kW
|
Summer
|
$11.57 per kW
|
Energy Charge
|
Winter
|
Off Peak
|
$0.0975 per kWh
|
On Peak
|
$0.1272 per kWh
|
Super Peak
|
$0.1272 per kWh
|
Summer
|
Off Peak
|
$0.1272 per kWh
|
On Peak
|
$0.1566 per kWh
|
Super Peak
|
$0.2010 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
4.
Very Large General Service (GS-4) Rate. TOU rates are mandatory for all customers receiving service in the GS-4 rate classification. Discounts for primary services are defined in Section
14.24.050(D).
The GS-4 TOU monthly rates on monthly billings will be as follows:
Basic Service Charge
|
$641.00 per meter, per month
|
Demand Charge
|
Winter
|
$6.71 per kW
|
Summer
|
$11.51 per kW
|
Energy Charge
|
Winter
|
Off Peak
|
$0.0950 per kWh
|
On Peak
|
$0.1215 per kWh
|
Super Peak
|
$0.1215 per kWh
|
Summer
|
Off Peak
|
$0.1238 per kWh
|
On Peak
|
$0.1504 per kWh
|
Super Peak
|
$0.1969 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
C. Aggregation of Demand. Accounts with multiple GS-3 service, or a
combination of GS-3 and GS-4 service that combine to exceed 1,000
kW of billed demand in any six months of the prior calendar year will
receive a discount of $0.003 per kWh on the GS-3 service total monthly
billed energy.
D. Primary Service. Service provided at 12,000 volts or higher under
delivery arrangements approved by Roseville Electric shall receive
a discount of two percent of the energy and demand charges.
E. Contract Rates. The city reserves the right to negotiate and provide,
by contract, service at rates other than those specified in the municipal
code.
F. Standby Service Rate.
1.
Applicability. This service is applicable to any general service
customer who utilizes, in whole or in part, generating facilities,
as defined in Roseville Electric Rule 21 standards for interconnection,
other than solar, wind or solar/wind hybrid customer-owned generating
facilities, to supply all or part of such customer's power requirements,
and where:
a.
Based upon the manufacturer's nameplate rating the generating
facilities do not exceed 100 percent of their projected demand as
determined by Roseville Electric.
b.
Pursuant to Rule 21 standards for interconnection, generating
facilities are connected to the city's electrical distribution
system. The customer shall not operate such customer-owned generating
facilities in parallel with the city's electrical system unless
otherwise approved in advance by Roseville Electric.
An interconnection agreement between the city and customer is
required for service under this rate, when the customer-owned generating
facilities are interconnected with the city's electrical system.
|
2.
Effective January 1, 2017 the standby service charge ($/kW of
"rated capacity" per month) shall be as follows:
Secondary voltage
|
$6.71
|
Primary voltage
|
$6.58
|
"Rated capacity" is a fixed kilowatts value determined
by the manufacturer's rating of the generator unit. In addition
to the auxiliary or standby service rate, the city will continue to
bill for all applicable charges under the appropriate rate schedule,
including, but not limited to, basic service, energy and demand charges.
G. Demand/kWh Criteria. Service provided under general service rates shall be periodically evaluated for compliance with rate classification monthly demand and/or kWh criteria. If the monthly demand and/or kWh criteria are not satisfied, the service may be transferred to the appropriate general service rate effective with the next available billing cycle. Exceptions are at the discretion of Roseville Electric or by a customized customer contract (if applicable). Compliance with monthly demand/kWh criteria shall be determined in accordance with Section
14.24.020 rate classification.
H. Advanced Metering Service Charge. The advanced metering service charge is required for all GS-2 customers who have access to the city's online energy profiler system. GS-2 service, whose maximum demand is equal to or greater than 250 kW in two or more summer months (as defined in Section
14.24.021) in the prior calendar year, will receive a special load profile meter, and the ability to remotely access usage data. Customers with facilities where the necessary metering equipment is infeasible or impractical to employ, as determined by Roseville Electric, will be exempted from this charge. The city will charge a monthly service fee of $42.00 to cover maintenance, software support and related expenses.
(Prior code § 8.35; Ord. 1229 § 1, 1975; Ord.
1338 § 2, 1976; Ord. 1408 § 2, 1978; Ord. 1507 §
2, 1980; Ord. 1655 § 1, 1982; Ord. 1707 § 2, 1983; Ord. 1764 § 2, 1984; Ord. 1813 § 2, 1984; Ord.
1911 § 1, 1985; Ord. 1984 § 1, 1986; Ord. 2294 §
1, 1990; Ord. 2411 § 1, 1991; Ord. 2577 § 1, 1992; Ord. 2710 § 1, 1993; Ord. 2847 § 1, 1995; Ord.
2991 § 1, 1996; Ord. 3091 § 2, 1997; Ord. 3121 §
1, 1997; Ord. 3144 § 1, 1997; Ord. 3214 § 1, 1998; Ord. 3381 § 1, 1999; Ord. 3552 § 11, 2000; Ord.
3588 § 1, 2000; Ord. 3637 § 1, 2001; Ord. 3702 §
1, 2001; Ord. 3731 § 2, 2001; Ord. 3731, §§ 2-10, 2001; Ord. 3749 § 2, 2001; Ord. 3875 § 1, 2002; Ord. 4007 § 2, 2003; Ord.
4181 § 1, 2005; Ord. 4397 § 1, 2006; Ord. 4527 §
1, 2007; Ord. 4605 § 2, 2008; Ord. 4725 § 1, 2009; Ord. 4792 § 1, 2009; Ord. 5166 § 1, 2013; Ord.
5266 § 2, 2013; Ord. 5589 § 3, 2015; Ord. 6415 §
2, 2021; Ord. 6592 § 2, 2022; Ord. No. 6820, 6/5/2024)
A. Net Metering Rate. For solar, wind, and/or solar/wind hybrid electric
generation located on the premises of the end user customer-generator,
where the customer-generator's own electricity demand is located,
interconnected behind the electric meter of record:
1.
Net metering is available for solar, wind, and/or solar/wind
hybrid electric generation systems, where the generating system meets
no more than 100 percent of the customer-generator's annual energy
(kWh) usage but is less than or equal to 1,000 kW, as defined in Roseville
Electric Rule 21 standards for interconnection.
2.
The solar and/or wind electric generating system must operate
in parallel with the city's electric utility system, and designed
to offset part of but no more than 100 percent of the customer-generator's
meter of record total annual kilowatt-hour electric load.
3.
All eligible customer-generators receiving service under net
metering rates shall pay all applicable electric monthly basic service
charges and other charges identified by state law and/or city ordinance
as a mandatory charge according to the terms and conditions of the
rate which the customer-generator would be assigned to, or be eligible
for, if the customer-generator was not an eligible customer-generator
over a normal billing cycle.
4.
The net metering solar, wind, and/or solar/wind hybrid electric
generation rate on billings shall be as follows:
a.
For all net metering customer-generators, any net surplus kilowatt-hours
generated during the previous billing cycle shall be carried over
to the following billing period as a monetary value, calculated according
to the customer-generator's applicable rate based energy charge.
Net credit values will be offset by future energy charges or will
appear as a net dollar based surplus energy value at the end of the
customer-generator's annual period.
b.
For eligible NM-1 customer-generators who are net generators
at the end of their annual period, the net energy surplus compensation
rate shall be applied to any net surplus kWh remaining.
c.
Eligible customer-generators will receive compensation for the
annual surplus as a credit applied toward the next annual period,
unless the customer elects to receive surplus compensation by check.
5.
For all other net metering customer-generators, any monetary
credits associated with net annual energy surplus generation at the
end of the customer-generator's annual period shall have no value.
6.
All net metering customer generators will receive annualized
billing, with any monthly credits valued at the applicable tariff
energy value.
7.
For energy payments due within any monthly billing period where
an amount, or net amount, is due for energy consumption:
a.
NM-1 Net Metering Rate with Surplus. The customer-generator
has the option to pay any amount due for net energy consumption, or
defer payment for net energy consumption until the end of the annual
period, or cessation of city provided electric service.
b.
All Other Net Metering Customers. The customer-generator must
pay any amount due for net energy consumption upon receipt of the
monthly bill.
8.
Net Metering Rate with Surplus (NM-1). The NM-1 rate applies
to residential customer generators and small non-residential customer-generators
with a maximum yearly demand (kW) of 10 kW or less. Annual net surplus
kWh for these eligible customer-generators shall be valued using the
net surplus energy compensation rate. Effective on electric service
utility billings generated on or after:
a.
June 1, 2024, the net surplus energy compensation rate shall
be $0.1176 per kWh energy charge.
b.
January 1, 2025, the net surplus energy compensation rate shall
be $0.1469 per kWh energy charge.
B. Roseville Solar 2.0 Rate. For eligible renewable generation such
as solar, wind, and/or solar/wind hybrid electric located on the premises
of the end user customer-generator where the customer-generator's
own electricity demand is located, interconnected behind the electric
meter of record:
1.
Roseville solar 2.0 is available where the generating system
meets no more than 100 percent of the customer-generator's annual
energy (kWh) usage but is less than or equal to 1,000 kW, as defined
in Roseville Electric Rule 21 standards for interconnection.
2.
The generating system must operate in parallel with the city's
electric utility system, and be designed to offset part of, but no
more than 100 percent, of the customer-generator's meter of record
total annual kilowatt-hour electric load.
3.
All eligible customer-generators receiving service under the
Roseville solar 2.0 rate shall pay all applicable electric monthly
basic service charges and other charges identified by state law and/or
city ordinance as a mandatory charge according to the terms and conditions
of the rate which the customer-generator would be assigned to, or
be eligible for, if the customer-generator was not an eligible customer-generator
over a normal billing cycle.
4.
The Roseville solar 2.0 rate on billings shall be as follows:
a.
All energy (kWh) delivered and received after the customer-generator
serves its own instantaneous load shall be measured by a multi-register
meter.
b.
The customer-generator will be billed consumption charges for
the energy delivered to the customer by Roseville Electric Utility,
based on the customer's applicable rate.
c.
In the event the energy generated by the customer exceeds the
energy consumed, Roseville Electric Utility will receive that energy
and the customer will receive a credit which shall be compensated
at the surplus energy compensation rate.
d.
The customer-generator must pay any amount due for energy consumption
upon receipt of the monthly bill.
5.
Roseville Solar 2.0 Rate. The Roseville solar 2.0 rate applies
to eligible customer-generators. Monthly customer generated kWh received
by the utility shall be compensated at the surplus energy compensation
rate:
a.
July 6, 2024, the surplus energy compensation rate shall be
$0.0691 per kWh. This rate is subject to revision by the city council
as energy prices and system requirements change.
C. For customer-generators where the generating system is over 1,000
kW, the surplus energy compensation rate will be determined on a case-by-case
basis.
D. The customer must comply with conditions and terms set forth by the
city and Roseville Electric Rule 21 requirements for safe and efficient
interconnection with the city's electrical system.
(Ord. 6415 § 3, 2021; Ord. 5872 § 2, 2017; Ord. 5589 § 4, 2015; Ord. 5266 § 3, 2013; Ord.
5166 § 1, 2013; Ord. 4898 § 2, 2010; Ord. 4792 §
1, 2009; Ord. 4527 § 1, 2007; Ord. 4397 § 1, 2006; Ord. 4181 § 2, 2005; Ord. No. 6820, 6/5/2024; Ord. No. 6820, 6/5/2024)
A. Effective
on billings as of July 1, 2009, a hydroelectric adjustment will be
implemented for all residential and general service electric billings.
1. Purpose.
The hydroelectric adjustment is calculated annually, effective July
1st through June 30th of each year, and is based on the cost impacts
associated with varying hydroelectric energy supplies.
2. Definitions.
"Annual forward market price"
means the estimated relevant future energy price for electricity
delivered to North Path 15 (electricity market hub for Roseville electricity
purchases). If North Path 15 is no longer available, a suitable replacement
will be used as determined by Roseville Electric.
"Rate stabilization fund"
means the fund established in accordance with Roseville Electric
financial policies and adopted by the city council for the purpose
of providing financial reserves to respond to the effects of major
economic contingencies.
3. Calculation.
The calculated hydroelectric adjustment will be determined by the
following method, no later than June 30th of each year:
a. Hydroelectric energy delivery forecast minus annual expected energy
from hydroelectric resources = energy variance.
b. Energy variance times annual forward market price = budget impact.
c. Budget impact divided by annual budgeted retail revenue = calculated
hydroelectric adjustment percentage.
Total service charges to customers for a monthly billing period
will be increased or decreased by the calculated hydroelectric adjustment
percentage.
If the calculated hydroelectric adjustment is a positive number,
i.e., due to lower than annual expected energy from hydroelectric
resources, a hydroelectric adjustment charge, not to exceed five percent
will be implemented.
If the calculated hydroelectric adjustment is a negative number,
i.e., due to higher than annual expected energy from hydroelectric
resources, and the rate stabilization fund balance is estimated to
remain above the maximum policy level for the following 12 months,
a hydroelectric adjustment credit, not to exceed five percent, will
be implemented.
(Ord. 4725 § 2, 2009; Ord. 4792 § 1, 2009; Ord. 5166 § 1, 2013; Ord. 5589 § 5, 2015; Ord.
6640 § 1, 2023)
A. Purpose.
The residential smart meter opt out rate is intended to provide an
alternative metering option for single-family residential customers
who do not want a smart meter installed on their premises. Roseville
Electric will install a non-communicating meter for opt-out customers
that will be manually read monthly.
B. Customers
choosing to opt out of the smart meter program will be charged a one-time
fee as adopted in the City of Roseville fee book and a monthly charge
established below to recover the costs of manual meter reading and
processing of their electric usage.
C. Effective
with the smart meter program implementation, customers choosing to
opt out of the program will be charged $15.00 per meter per month.
For customers who participate in the senior citizen rate reduction,
low-income rate reduction, and medical support rate reduction programs,
the monthly opt-out rate will be $7.50 per meter.
D. Eligibility.
In order to qualify to opt out of the smart meter program, the following
conditions apply:
1. Single-family
residences, which may include townhomes and condominiums that are
individually metered, as well as duplexes and half-plexes, are eligible.
2. Customers
with a net metering rate (NM-1) are not eligible.
3. Customers
who have a history of meter tampering or unauthorized use of energy
are not eligible.
4. Customer
opt out does not transfer to new service addresses. The customer will
be required to opt out and pay the one-time fee for each premises.
5. Customers
can opt in at any time after opt out. However, opt out will no longer
be available for that customer at their current residence. There are
no costs associated with opt in.
(Ord. 6611 § 1, 2023)
A. Outdoor Lighting Rate. All unmetered service including outdoor lighting
service, will be charged in accordance with engineering determinations
made by Roseville Electric. Service furnished under this rate may
be discontinued at any location where the city's overhead facilities
are relocated, converted to underground, or the space on the pole
utilized by the light is needed by the city for other facilities.
The outdoor lighting the monthly billing will be as follows:
1.
Effective June 1, 2024.
Rate Code
|
Rate ($/month)
|
---|
FL03
|
$8.57
|
FL14
|
$57.76
|
FL23
|
$150.30
|
FL27
|
$412.00
|
100W Sodium Vapor
|
$6.56
|
175W Mercury Vapor
|
$9.73
|
200W Sodium Vapor
|
$14.52
|
400W Mercury Vapor
|
$22.52
|
400W Sodium Vapor
|
$22.52
|
2.
Effective January 1, 2025.
Rate Code
|
Rate ($/month)
|
---|
FL03
|
$9.97
|
FL14
|
$67.20
|
FL23
|
$174.86
|
FL27
|
$479.32
|
100W Sodium Vapor
|
$7.63
|
175W Mercury Vapor
|
$11.32
|
200W Sodium Vapor
|
$16.89
|
400W Mercury Vapor
|
$26.20
|
400W Sodium Vapor
|
$26.20
|
B. Street Lighting Rate. Consumption on city-owned streetlights is not
metered. The base charge is set using estimated consumption. For the
city-owned street lighting account, the monthly billing will be as
follows:
1.
Base Charge.
a.
Effective June 1, 2024, a charge of $19,499.96 per month.
b.
Effective January 1, 2025, a charge of $22,686.14 per month.
C. Traffic Signal Rate. For all city-owned traffic signal electric service,
the monthly billing will be as follows:
1.
Effective June 1, 2024.
Customer Charge
|
$35.10 per meter, per month
|
Energy Charge
|
$0.0451 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
2.
Effective January 31, 2025.
Customer Charge
|
$35.10 per meter, per month
|
Energy Charge
|
$0.0604 per kWh
|
California Renewable Energy Requirement Surcharge
|
$0.0056 per kWh
|
California Greenhouse Gas Emission Reduction Requirement Surcharge
|
$0.0002 per kWh
|
Hydroelectric Adjustment
|
Annually adjusted charge or credit on billings that will be applied from July 1 to June 30 each fiscal year, as prescribed in Section 14.24.052
|
D. City-Owned Electric Vehicle Charging Rate.
1.
Effective June 1st, 2024 the rate for city-owned electric vehicle
charging stations will be $0.1635 per kWh plus associated vendor fees
(which may change without notice according to vendor terms and conditions).
2.
Effective January 1, 2025 the rate for city-owned electric vehicle
charging stations will be $0.1902 per kWh plus associated vendor fees
(which may change without notice according to vendor terms and conditions).
E. Pole Attachment Rate. This rate applies to general service accounts
attached to unmetered Roseville assets where the consumption of electricity
is small or can be predetermined with reasonable accuracy by reference
to the capacity of equipment served and the hours of operation. Roseville
Electric will calculate electricity consumption in lieu of providing
metering equipment.
1.
Effective June 1, 2024.
Basic Service Charge
|
$13.28 per attachment, per month
|
Energy Charge
|
$0.1431 per kWh
|
2.
Effective January 1, 2025.
Basic Service Charge
|
$13.28 per attachment, per month
|
Energy Charge
|
$0.1570 per kWh
|
F. All rates in subsection
A of this section will increase or decrease at the same percentage as the percentage change applied to the rates for the GS-1 rate classification.
G. Energy Cost Surcharge. Effective February 1, 2023 to December 31,
2024 an energy cost surcharge of $0.00350 per kWh will be applied
to all metered energy by customers defined in this section.
H. Energy Cost Surcharge. Effective February 1, 2023 to December 31,
2024 an energy cost surcharge of $1431.19 per month will be applied
to the street lighting rate defined in this section.
(Ord. 1620 § 2, 1982; Ord. 1813 § 3, 1984; Ord. 1911 § 1, 1985; Ord. 1984 § 1, 1986; Ord.
2296 § 1, 1990; Ord. 2411 § 1, 1991; Ord. 2577 §
1, 1992; Ord. 2710 § 1, 1993; Ord. 4792 § 1, 2009; Ord. 5166 § 1, 2013; Ord. 5589 § 6, 2015; Ord.
5999 § 1, 2018; Ord. 6415 § 4, 2021; Ord. 6592 §
3, 2022; Ord. 6643 § 9, 2023; Ord. No. 6820, 6/5/2024)
Charge for service delivered outside the corporate limits of
the city may include a surcharge on the applicable residential or
general service charge.
(Prior code § 8.36; Ord. 1299 § 1, 1975; Ord.
3430 § 3, 1999; Ord. 4792 § 1, 2009)
Subject to the conditions listed below, single-phase or three-phase
service will be supplied as required by the customer in accordance
with the appropriate rates.
A. Voltage
supply will be designated by the director.
B. Single-phase
service will not be supplied to customers whose meter demand exceeds
100 KVA.
C. Three-phase
service will not be supplied to motor loads of less than seven and
one-half horsepower or other three-phase devices of less than seven
and one-half horsepower, except where three-phase secondary facilities
are available at the service location of the customer, or where the
customer for three-phase service contributes the net estimated installed
cost of such facilities (exclusive of meter and service costs), or
such part of the net estimated installed cost as the director may
consider equitable, considering all of the circumstances.
D. Alternating
current service of approximately 60-cycle frequency will be supplied
at the following nominal voltages:
Secondary Voltages
|
Primary Voltages
|
---|
Single Phase
|
Three Phase
|
Three Phase
|
|
208Y/120
|
2400Δ (1)
|
120/240
|
140Δ /120
|
4160Δ (1)
|
|
480Δ (1)
|
4160Y/2400 (1)
|
208Y/120
|
480Y/277
|
12,000Y
|
These voltages will be provided to existing customers
who are currently being supplied at this level. No new customers will
be served at these voltages. Customers with service changes (such
as service upgrades) that are currently served at these voltages may
be required to have their service voltages changed to a standard voltage.
E. Frequency
and service voltage will be kept, whenever possible, within reasonable
limits, but no guarantee concerning such frequency or service voltage
shall be made.
(Prior code § 8.40; Ord. 1299 § 1, 1975; Ord.
2769 § 1, 1994)
Effective on billings as of July 1, 2009, customers who enroll in Roseville Electric's green energy program, Green Roseville, and pay the program cost to receive 100 percent of their metered energy from Green Roseville renewable energy purchases, will be exempt from the environmental compliance charges described in Sections
14.24.040 and
14.24.050.
(Ord. 3436 § 1, 1999; Ord. 4725 § 1, 2009; Ord. 4792 § 1, 2009)
Community solar is a voluntary program open to residential customers.
Customers can select to participate in either the community
solar 100 percent or community solar 50 percent programs. Customers
with community solar 100 percent will offset their consumption with
energy from local solar. Customers with community solar 50 percent
will offset 50 percent of their consumption with energy from local
solar.
Customers choosing to participate in Roseville community solar
will pay all charges defined in the customer's applicable rate class.
In addition, participants will pay the Roseville community solar rate
and receive the community solar credit outlined below.
Community solar customers will be charged the community solar
rate and credited the community solar credit. Community solar charges
and credits shall be established using the customer's total monthly
kWh metered consumption and their selected participation rate.
Customers enrolled in the low income rate reduction program as defined in Section
14.24.079 can participate in Roseville community solar 100 percent and receive community solar low income rate reduction credit.
Community solar rates and credits, effective July 1, 2018:
100% Participation
|
|
Rate
|
$0.10 per kWh
|
Credit
|
$0.08 per kWh
|
50% Participation
|
|
Rate
|
$0.05 per kWh
|
Credit
|
$0.04 per kWh
|
Low Income Rate Reduction 100%
|
|
Rate
|
$0.10 per kWh
|
Credit
|
$0.10 per kWh
|
(Ord. 5998 § 1, 2018)
A. This
rate reduction was closed to new applicants effective June 1, 1998.
B. Effective
January 14, 2000, all customers receiving the senior citizen rate
reduction will receive a credit of 12 percent of charges calculated
using standard residential rates.
(Ord. 2123 § 2, 1988; Ord. 2734 § 2, 1994; Ord. 3091 § 3, 1997; Ord. 3207 § 1, 1998; Ord.
3381 § 1, 1999)
A. Any person who requires an in-home medical support device and is
paying for service at standard residential rates may apply for the
following residential rate.
1.
Effective January 1, 2004 all qualifying persons who are eligible
to receive the medical support rate reduction shall receive a reduction
equal to 50 percent of charges calculated using standard residential
rates for the first 500 kWh of usage per monthly billing period and
20 percent of charges for all charges calculated using standard residential
rates for usage in excess of 500 kWh.
2.
Effective June 1, 2024, all qualifying persons who are eligible
to receive the medical support rate reduction shall receive a $15.00
reduction to the monthly the basic service charge.
B. Applications for reduced rates shall be made on forms supplied by
the city and shall be submitted to utility customer care who shall
review the applications and determine eligibility for reduced rates.
The application shall be executed under penalty of perjury and be
accompanied by the statement of a treating physician certifying the
need for the in-home medical support device. The reduced rate shall
terminate in the event the person requiring the use of the in-home
medical support device no longer resides at the residential address
receiving electricity at reduced rates. Persons who have been qualified
to receive the reduced rate shall submit such documentation as the
utility director may specify annually thereafter to certify continuing
qualification as required by this section.
C. For the purposes of this section, a "medical support device" is defined
as any medical device requiring utility-supplied electrical energy
for its operation and which is regularly required to support the life
of a person residing in a residential dwelling, including respirators,
iron lungs, hemodialysis machines, suction machines, pressure pads
and pumps, electrostatic and ultrasonic nebulizers, IPPB machines,
electric nerve stimulators, aerosol tents, compressors and motorized
wheelchairs. A "medical support device" shall also include electric
heating or air conditioning for paraplegic, hemiplegic and quadriplegic
persons and electric heat or air conditioning for persons with multiple
sclerosis.
D. For the purposes of this section, a "qualifying person" is defined
as any person having a verifiable gross annual income of no greater
than that specified by the U.S. Department of Housing and Urban Development
as "low income" for Placer County.
E. The utility director may adopt such rules and regulations, consistent
herewith, which he deems necessary to properly carry out the provisions
of this section.
(Ord. 2894 § 1, 1995; Ord. 3091 § 4, 1997; Ord. 3381 § 1, 1999; Ord. 4007 § 2, 2003; Ord.
4792 § 1, 2009; Ord. 6643 § 10, 2023; Ord. No.
6810, 5/1/2024)
A. Effective July 1, 1998, any household with a total income no greater
than 200 percent of the Federal Poverty Level (FPL) issued by the
Department of Health and Human Services (HHS) may apply for a 20 percent
rate reduction of all charges in the standard residential rate. Applications
for reduced rates shall be on forms supplied by the city. All information
required to be given on such forms shall be supplied by the applicant
on behalf of the household under penalty of perjury. Effective June
1, 2024, all qualifying persons who are eligible to receive the low-income
rate reduction shall receive a $15.00 reduction to the monthly the
basic service charge.
B. Reduced rates shall be granted to qualifying household which file
applications with the utility director. A change of address terminates
the special rate provided in this section, but a new application at
a new address may be made and the reduced rate shall be allowed, if
the requirements set out in this section are satisfied.
C. For the purposes of this section, a "qualifying household" is defined
as any household with a verifiable gross household income no greater
than 200 percent of the Federal Poverty Level (FPL) issued by the
Department of Health and Human Services (HHS).
D. This rate reduction replaces the senior citizen rate reduction in Section
14.24.075 for new applicants. Current senior citizen rate reduction participants may choose to remain on the existing senior reduced rate or apply for the low-income rate reduction.
E. No household may participate in more than one city electric rate
reduction program concurrently.
(Ord. 3207 § 2, 1998; Ord. 3381 § 1, 1999; Ord. 6376 § 1, 2021; Ord. No. 6810, 5/1/2024)
A. Interference with Quality of Service. In any instance in which the director determines that any customer, because of noncompliance with any provision of this chapter, or any reasonable rule or regulation promulgated by the director pursuant to Section
14.24.170 has caused an interference with the quality of service received by that person or other customers, the director may require such customer to provide such additional or special equipment as may be required to eliminate such interference.
The customer may provide such additional equipment at his own
expense, or the city may, upon approval of the superintendent, provide
such equipment if the customer agrees:
1. To
pay the cost of such equipment; or
2. To
rent such equipment from the city at such monthly rate as the director
shall deem appropriate.
In the event a customer refuses to install the equipment necessary
to eliminate such interference, the director may discontinue service
to such customer until such time as the necessary equipment is procured.
|
B. Phase
Balancing. For three-wire single-phase, or three-wire three-phase,
or four-wire combination single-phase and three-phase services supplied,
the load must be balanced as nearly as practicable between two sides
or several phases, respectively. In no case is the load on one side
of a three-wire single-phase service to be greater than twice that
on the other, nor the load on any one phase of a three-phase star
service to be greater than twice that on any other phase.
(Prior code § 8.41; Ord. 1299 § 1, 1975)
When a customer desires voltage control within unusually close
limits, the director may require the customer to provide, at his or
her own expense, such additional equipment as required. Upon approval
of the director, the customer may obtain the necessary equipment from
the city by payment of the cost therefor, or may rent the same from
the city at a monthly rental charge determined by the director.
(Prior code § 8.42(a); Ord. 1299 § 1, 1975)
The city will serve, at the applicable rate and without additional
compensation, welding equipment of the limited input type which conforms
to the standards of the National Electrical Manufacturers' Association
(NEMA), and which has a maximum input (primary) current rating not
exceeding 12 amperes at 120 volts, or 50 amperes at 208 or 240 volts.
Welding equipment which does not meet the standards of NEMA
or which exceeds in input rating 12 amperes at 120 volts, or 50 amperes
at 208 or 240 volts, will also be served at the applicable rate without
additional charge, provided that service to such welding equipment
has no detrimental effect on service to neighboring customers.
(Prior code § 8.42(b); Ord. 1299 § 1, 1975)
Motor generator sets and rectifiers shall be considered as power
apparatus and shall be rated, for the purposes of determining charges,
on the input rating as set by the manufacturer, or at the election
of the director, by actual test.
(Prior code § 8.42(c); Ord. 1299 § 1, 1975)
All motor installations shall have protective devices or be
built to provide equivalent protection as follows:
A. Motors
that cannot safely receive full rated voltage at starting shall have
a device to insure that, upon failure of voltage, such motors will
be disconnected.
B. Suitable
overload and overcurrent protection shall be provided for each motor,
so as to disconnect the motor in cases of overheating.
C. Phase
reversal and open phase protection is required for all installations
involving elevators, hoists, or similar equipment in order to disconnect
motors in the event of phase reversal or opening of one phase.
(Prior code § 8.42(d); Ord. 1299 § 1, 1975)
A. Automatically
controlled, single-phase motorized equipment shall comply with all
applicable NEMA standards and shall be equipped with motors having
locked rotor currents not in excess of the following:
1. 100
amperes at 120 volts for residential use;
2. 200
amperes at 120 volts for commercial use;
3. 170
amperes at 208 volts for residential use;
4. 300
amperes at 208 volts for commercial use;
5. 170
amperes at 240 volts for residential use;
6. 340
amperes at 240 volts for commercial use;
B. Manually
controlled, single-phase motorized equipment, shall be equipped with
motors having locked rotor currents not in excess of the following:
1. 100
amperes at 120 volts for residential use;
2. 200
amperes at 120 volts for commercial use;
3. 170
amperes at 208 volts for residential use;
4. 300
amperes at 208 volts for commercial use;
5. 200
amperes at 240 volts for residential use;
6. 340
amperes at 240 volts for commercial use.
C. Motors
having locked rotor currents in excess of those allowed by paragraphs
A and B above, may be permitted upon written approval of the director.
(Prior code § 8.42(e) (1); Ord. 1299 § 1, 1975; Ord. 3789 § 1, 2002; Ord.
3850 § 1, 2002)
A. Automatically
controlled, three-phase motors shall comply with all applicable NEMA
standards and shall have maximum locked rotor currents not in excess
of the following:
1. 770
amperes at 208 volts;
2. 673
amperes at 240 volts;
3. 337
amperes at 480 volts.
Maximum permissible current values listed apply to the installation
of a single motor.
|
B. Manually
controlled, three-phase motors shall comply with all applicable NEMA
standards and shall have maximum locked rotor currents not in excess
of the following:
1. 1554
amperes at 208 volts;
2. 1346
amperes at 240 volts;
3. 673
amperes at 480 volts;
4. 135
amperes at 2400 volts;
Maximum permissible current values listed apply to an installation
of a single motor.
|
C. Three-phase motors to be used for large loads or when special conditions exist may have locked rotor currents in excess of those allowed by subsections
A and
B of this section, upon approval of the superintendent.
D. Motors having maximum locked rotor currents exceeding those stated in subsections
A and
B of this section, may be operated if used in conjunction with current-limiting devices designed to limit the starting current to the above-specified maximum values.
E. Current-limiting
devices may be omitted on the smaller motors of a group installation
where such omission will not result in a starting current in excess
of the allowable starting current of the largest motor in the group.
(Prior code § 8.42(e) (2); Ord. 1299 § 1, 1975)
In case of neon, luminous, gaseous, or mercury vapor lamps or
tubes, electrical welders, and other devices having low power factors,
a customer may be required to provide, at his own expense, power factor
corrective equipment to increase the power factor of any such device
to not less than 95 percent.
(Prior code § 8.42(f); Ord. 1299 § 1, 1975)
The director may cause service to be discontinued under any
of the following conditions:
A. Failure
to pay for all or any portion of electrical service as directed by
the director of finance;
B. Where
any equipment or wiring of any customer is unsafe, in the opinion
of the director, or in violation of any provision of this chapter
or any provision of the city code or any other applicable ordinance
or law. In the event the director determines that any equipment or
wiring is imminently dangerous to the public health, safety and welfare,
the electrical service may be terminated without notice to the customer,
and shall not thereafter be restored until the defective and unsafe
condition is remedied;
C. When
the operation of equipment of a customer is detrimental to the electric
service received by other customers;
D. When
the customer has tampered with any equipment of the system or has
attempted to defraud the system;
E. Upon the refusal of the customer to comply with any provisions of this chapter or any reasonable rule or regulation promulgated by the director pursuant to Section
14.24.230.
(Prior code § 8.43; Ord. 1299 § 1, 1975)
A customer rate may receive temporary service upon application
to the director upon prior payment of the estimated cost to the system
of installing and removing all facilities connected with the temporary
service, and upon payment, as the director may require, of additional
sums necessary for the system to continue to provide such temporary
service.
(Prior code § 8.44; Ord. 1299 § 1, 1975)
All customers receiving electrical energy from the system do
so with the express understanding that:
A. Neither
the system, the city, nor its agents or employees shall be liable
for any interruption of service or any insufficiency of supply of
electrical energy, or any loss or damage of any kind or character
caused thereby, or due to any condition existing within any wiring
or equipment owned by or under the control of any customer; and
B. The
system may suspend, when necessary, delivery of electrical energy
in order to make any necessary repairs to the system; and
C. In
case of shortage of supply, the system will apportion such supply
to all customers in the manner deemed most efficient and equitable
by the director, but without any prior commitment concerning the apportionment
of any available supply.
(Prior code § 8.45; Ord. 1299 § 1, 1975)
A. Individual
Applications and Advance Notice. Extensions of electric lines will
be constructed, owned, operated and maintained by the city at the
request of a customer in accordance with this and other applicable
city rules and regulations and as determined by the director.
B. Extensions
Subject to Right-of-Way or Easements. Customer-requested electric
line extensions will be constructed only in satisfactory easements
provided without cost to the city.
C. Extensions
Required to be Underground.
1. All
extensions of facilities will be underground except:
a. When the director determines that underground installation is impractical;
or
b. When the service is of a temporary nature; or
c. The facilities are intended to be used at subtransmission or transmission
voltages.
2. Customer Construction Responsibilities. In addition to costs and responsibilities for electric service pursuant to this section and Section
14.24.200, the customer shall provide all trenching, excavation, backfill, compaction, grading, marking of property lines in accordance with the specifications and requirements of the city. Additional materials and installations, depending on the type of development, are required as follows:
a. New Residential Subdivisions. Furnish and install secondary service
conduit and conductor from service box to house.
b. Commercial Electric Utility Installations Including Commercial and
Industrial Development, Apartments, Condominiums, Townhomes and Mobile
Homes.
i. Furnish and install all materials not installed by city electric
crews which shall include, but not be limited to, transformer vaults
or pads, primary junction boxes and covers, conduit for primary cable
and riser poles including conduit strap for riser poles in accordance
with City of Roseville specifications for commercial construction.
ii. Furnish and install all street-lighting in accordance with the City
of Roseville specifications for commercial construction.
iii.
Furnish and install secondary service conduit and conductor.
c. Customers are responsible for design, installation and maintenance
of streetlight facilities on private roadways and private property.
3. Development
Fees. Distribution facility extensions will be installed, owned and
maintained by the city. A customer will be required to make a nonrefundable
payment, prior to construction, equal to the amount of the city's
estimate of the cost of distribution facilities to and within the
development (sometimes known as contribution in aid of construction
or direct charge), and council authorized administrative and general
expenses.
D. Special
Service Request. A customer requesting special service, for example,
service at a voltage not presently available in an area or requesting
capacity for intermittent use, may obtain such service if, in the
sole judgment of the director, it is practical to supply such service
without adverse effect on the existing system or other customers.
The customer will be required to make a non-refundable payment, prior
to construction, equal to the city cost estimate of the special services.
E. Capacity
Increase. A customer increasing the capacity of the main switchboard,
service entrance equipment/main circuit breaker will be required to
make a non-refundable payment equal to the estimated cost of any necessary
increase in capacity of the distribution system to supply the additional
capacity.
F. Modification
of Existing System. A customer wanting to modify the city's existing
system for the customer's benefit may have the city do so provided:
1. Such
modification has no adverse effect on the city's system or existing
customers;
2. The
customer makes a non-refundable payment, prior to engineering, equal
to the estimated amount of engineering design services;
3. The
customer makes a non-refundable payment, prior to construction, equal
to the estimated amount of such modification;
4. Work
is done at the city's convenience.
G. Non-Contiguous
Developments. The city will extend its facilities to serve non-contiguous
developments within city limits provided:
1. The
customer makes a non-refundable payment, prior to construction, equal
to the city's cost estimate of the supply extension(s) necessary to
serve the development;
2. The
customer obtains, at no cost to the city, satisfactory easements for
the extension.
(Prior code § 8.46; Ord. 1299 § 1, 1975; Ord.
2394 § 1, 1991; Ord. 2407 § 1, 1991; Ord. 2710 §
1, 1993)
A. In
the event of disputed city utility charges, the owner or occupant
of any premises may within 20 days of billing, appeal city utility
charges by depositing the amount billed with utility customer care
and making a written application to the utility director or designee
stating the circumstances and requesting an adjustment in the charges.
The utility director or designee may, upon such application, find
that the charges are unjust, inequitable or otherwise inappropriate
as applied to the particular premises. The utility director or designee
may adjust an individual bill or make a permanent adjustment as required
by the circumstances.
B. The
decision of the utility director or designee may be appealed to the
Roseville public utility commission by filing a written request with
the utility director or designee within 20 days of the original decision.
C. The
decision of the Roseville public utility commission may be appealed
to the city council by the owner, the occupant or the city by filing
a written request with the city clerk within 20 days of the Roseville
public utility commission's decision.
(Ord. 3430 § 4, 1999; Ord. 6643 § 11, 2023)
A. Service
in Areas Supplied by Overhead Facilities.
1. Primary
Voltage (12,000 Volts) and Secondary Voltage (600 Volts or Less) Service.
In areas served through overhead facilities, the city will provide
and install a service drop from its pole line to the first point of
attachment on the property of the customer as approved by the director.
The customer shall pay to the city, in advance of construction, a
non-refundable sum equal to the city's estimated cost of such service.
2. Underground
Service From Overhead Facilities. In areas supplied by overhead facilities
only, when the director requires or the customer desires underground
service, such service shall be supplied to the customer provided the
customer pays for all distribution facilities to and on his property
according to a design and under specifications approved by the director.
3. Overhead
Service at Transmission Voltage (60,000 Volts). Service at this voltage
level is available only at certain locations in the city and on specific
approval of the director. The customer shall pay to the city, in advance
of construction, a non-refundable sum equal to the city's estimated
cost of providing such service. The director shall determine specific
requirements for this type of service at time of application.
B. Service
in Areas Supplied by Underground Facilities.
1. Below
600 Volts.
a. Single-Family Residential Subdivision. The customer shall install,
own and maintain conduit and conductor from the customer's service
equipment (conduit from conduit stub in foundation) to the city's
distribution equipment. The customer shall pay to the city, in advance
of construction, a non-refundable sum equal to the city's estimated
cost of the service system throughout the development. All trenching
excavation, backfill and compaction shall be furnished by the customer.
b. Multifamily Residential, Mobile Home Parks, Commercial and Industrial
Developments. The customer shall furnish, install, own and maintain
all conduit, cable, etc., from the customer service equipment to the
city's distribution facilities per city and inspecting agency requirements.
The customer shall pay to the city, in advance of construction, nonrefundable
sum equal to the city's estimated cost, including terminations of
the service conductors at the service end point in the distribution
facilities of such service.
2. Primary
Underground Service (12,000 Volts). The city will install, own and
maintain conductor from the customer's service equipment to the city's
distribution equipment. The customer shall pay to the city, in advance
of construction, a non-refundable sum equal to the city's estimated
cost of the service. All trenching, excavation, backfill, compaction,
conduit and substructure installation shall be furnished by customer
to the city's specifications. Customer service equipment shall be
approved by the city and shall include three phase gang-operated switch,
protection devices, cable termination devices pursuant to city requirements
and provisions for metering equipment pursuant to the Electric Utility
Service Entrance Rules Committee standards and the requirements of
the director.
3. Underground
Service (60,000 Volts). Underground service at the 60,000 volts voltage
level is not available.
C. Electrical
Service Inspections. No new or newly rewired electrical installations
will be energized by the city without a signed electrical inspection
tag from the chief building inspector.
D. Service
Connections.
1. The
city will not connect to any one building more than one service of
each voltage classification, either overhead or underground, except:
a. For the city's operating convenience;
b. Where such additional service may be warranted because of load requirements;
c. Where the customer is required by law to have certain emergency services.
2. Connection
of service to, or disconnection from, the city's lines shall be made
only as authorized by the city.
E. Ownership
of Facilities.
1. All
facilities installed on a customer's premises, including, not limited
to, poles, conductors, transformers, meters, etc., which are furnished
by the city in order to render service, shall remain the sole property
of the city.
2. The
customer shall not charge the city rent or any other charge for the
facilities placed on the customer's premises or for access to such
facilities.
F. Right
of Access.
1. The
city shall have the right of access to the customer's premises, at
all reasonable hours for any purpose related to the furnishing of
electric service, including, but not limited to, meter reading, testing,
inspection, construction, maintenance and repair of facilities.
2. Service may be refused or disconnected pursuant to Section
14.24.160 if permanent safe accessibility is not provided by the customer.
3. Upon
termination of service, the city shall have the right of access to
the service premises to remove its facilities.
4. The
customer shall obtain and provide the city with all necessary easements
as required by the city.
G. Customer
Responsibilities.
1. It shall be the duty of each customer upon whose premises the city has installed facilities as described in subsections
E and
F of this section to insure that such facilities are not damaged, destroyed or interfered with and, in the case of any defect in any such facilities, to notify the city.
2. The
customer shall, at his own risk and expense, furnish and install,
inspect and keep in good and safe condition, all facilities required
for receiving electrical energy from facilities of the city and for
utilizing such energy, including all necessary protective devices.
The system, the city or its agents or employees shall not be responsible
for or liable for any loss or damage occasioned by any condition or
defect in any facility or equipment owned by any customer.
H. Metering
Installations.
1. Location.
a. All meters and metering equipment, except cabinets, will be supplied
and installed by the city upon the service premises at a location
approved by the director.
b. All meters shall be safety accessible to authorized employees of
the city at all times for inspection, testing and reading.
c. The city may require a customer to relocate a metering installation,
at customer's expense, if any existing meter location becomes inaccessible
or for other operational needs.
2. No
person shall tamper with any meter or break the seal on any meter
or cause electricity to bypass any meter.
I. Conflict
with Equipment and Facilities. Conflicts occurring when equipment
or facilities installed by the city including, but not limited to,
metering equipment becomes obstructed, covered, inaccessible, or exposed
to traffic, as a result of landscaping, screening, fencing and driveway
widening caused by the customer property owner and/or occupant of
the property on which or adjacent to which the equipment and facilities
were originally installed, shall be corrected as specified or carried
out by the director at the cost of the customer.
J. Tree
Trimming (Line Clearing). The electric department may, from time to
time, trim, clear away and, if necessary, cut down trees and brush
in the vicinity of its overhead lines within its easements.
(Prior code § 8.47; Ord. 1299 § 1, 1975; Ord.
2394 § 1, 1991; Ord. 2407 § 1, 1991)
Notwithstanding any provision of Section
14.24.190 or
14.24.200 calling for advance payment, the city may from time to time allow for payments to be made over time under circumstances, criteria, terms and conditions established by the director and approved by the city council.
(Ord. 2407 § 2, 1991)
A. Meter
Tests.
1. Any
customer may request the city electric utility to test the customer's
electric meter. An energy service provider may request the city electric
utility to test the electric meter or recording device of its contracted
customer. The customer shall be notified of any request for a meter
test made by their energy service provider. No payment or deposit
will be required from the requester of the test except that when a
request is made to test a meter within six months after date of installation
of the meter, or more often than once in six months thereafter, a
deposit to cover the reasonable cost of the test will be required
of the requester. The amount so deposited will be returned to the
requester if the meter is found, upon test, to register more than
two percent fast or slow under conditions of normal operation. Within
a reasonable time after a request is made the director shall conduct
a test of the meter to determine whether or not it is functioning
properly. A report giving the results of the test will be supplied
to the customer and, if requested, to the energy service provider,
by the director within a reasonable time after the completion of the
test.
2. The
requester shall have the right to require the city electric utility
to conduct the test in his or her presence or, if the requester so
desires, in the presence of an expert or other representative appointed
by the requester; provided, however, that the test shall be conducted
during normal city working hours.
3. No
meter will be placed in service or allowed to remain in service which
has on average an error in excess of more than two percent of registration
under conditions of normal operation.
B. Adjustment
of Bills for Meter Error. Where, as the result of any meter test,
a meter is found to be non-registering or incorrectly registering,
the city may render an adjusted bill to the customer for the amount
of any undercharge of city electric utility charges, without interest,
and shall issue a refund or credit to the customer for the amount
of the overcharge, without interest. Adjusted billings shall be computed
back to the date that the city determines the meter error commenced,
except that the period of adjustment shall not exceed one year for
a refund or undercharge. An adjusted bill shall be computed in accordance
with the following:
1. Fast
Meter. If a meter is found to be registering more than two percent
fast, the city will refund to the customer the amount of the overcharge
based on corrected meter readings if available, or the city's estimate
of the correct energy usage either for the known period of meter error,
not to exceed one year or, if the period of error is not known, for
the period during which the meter was in use, not to exceed one year.
2. Slow
Meter. If a meter for residential service is found to be registering
more than 25 percent slow, or if a meter for nonresidential service
is found to be registering more than two percent slow, the city may
bill the customer for the amount of the undercharge based on corrected
meter readings if available or the city's estimate of the energy usage
for the known period of meter error or, if the period of meter error
is not known, for the period the meter was in use, not to exceed three
months for residential service and six months for all other classes
of service.
3. Non-Registering
Meter. If a meter is found to be non-registering, the city may bill
the customer for the city's estimate of the electric service used
but not registered, not to exceed 12 months for all classes of service.
The bill will be computed on the basis of information including, but
not limited to, available meter readings, records of historical use
and the general characteristics of the customer's load and operation.
C. Adjustment
of Bills for Billing Error. Where the city overcharges or undercharges
a customer as the result of a billing error, the city may render an
adjusted bill for the amount of the city electric overcharge or undercharge,
without interest, and shall issue a refund or credit to the customer
for the amount of the overcharge, without interest, for the same periods
as for meter error. Estimated bills for the "billing error" use period
may be determined by the director based on the following:
1. Accurately
metered subsequent use, normally 30 days or more (where 30 days is
not available for reasons such as the customer discontinues service
after correction of the "billing error" use condition but prior to
the completion of 30 days the director may use a shorter period);
or
2. Accurately
metered use prior to the onset of the "billing error" use, normally
one year or more (the director may use less than one year when it
is the only appropriate or available recorded prior usage); or
3. Accurately
metered use from a remote check meter; or
4. The
customer's equipment and hours of operation; or
5. The
known percent error in metering attributable to the "billing error"
use condition as determined by the director; or
6. Annual
use profile of like customers (percent of annual use); or
7. Any
combination of the methods listed above; or
8. Other
reasonable and supportable billing methodology when none of the aforementioned
billing techniques is appropriate under the circumstances.
In accordance with Section 14.24.195, the customer has the right to dispute the city's estimate of the "billing error" usage on which the bill is based. However, the customer may be required to provide supporting information to substantiate this dispute.
|
(Prior code § 8.48; Ord. 1299 § 1, 1975; Ord.
2394 § 1, 1991; Ord. 2407 § 1, 1991; Ord. 2655 §
1, 1992; Ord. 3430 § 3, 1999; Ord. 6643 § 12, 2023)
Where the city determines that there has been unauthorized use
of any electric service, the city may bill the customer for such use
based on city's estimate of the amount of unauthorized use for up
to three years. Such estimated billing shall indicate unauthorized
use for the most recent three years.
(Ord. 2655 § 2, 1992; Ord. 3430 § 3, 1999)
Any person violating any provision of this chapter with the exception of Section
14.24.240, shall be guilty of infraction as that term is now or may hereafter be defined by the laws of the State of California.
(Prior code § 8.51; Ord. 1299 § 1, 1975)
The director is authorized and directed to promulgate such rules
and regulations as are reasonably necessary to carry out the specific
provisions and the intent of this chapter. Such rules and regulations
shall be in written form and available to any customer.
A. In
the event any customer is aggrieved by reason of any electric utility
department rule or regulation such customer may bring such matter
to the attention of the director, making a written application stating
the circumstances and requesting a specific remedy.
B. The
decision of the director may be appealed to the Roseville public utility
commission by filing a written request with the director within 20
days of the director's decision.
C. The
decision of the Roseville public utility commission may be appealed
to the city council by the owner, the occupant or the city by filing
a written request with the city clerk within 20 days of the Roseville
public utility commission's decision.
(Prior code § 8.52; Ord. 1299 § 1, 1975; Ord.
3430 § 3, 1999)
It is unlawful and a misdemeanor for any person to resell any
energy received from the system, except that a landlord may charge
a tenant the amount which the landlord must pay for electrical energy.
(Prior code § 8.50; Ord. 1299 § 1, 1975)
It is unlawful for any person to transmit or deliver electric energy or capacity to ultimate consumers or end users for use within the city, including the transmission or delivery by an end user or consumer of electric energy purchased outside the city to him, her or itself; or to transmit or deliver electric energy or capacity for profit at retail within the city or from retransmission or redelivery within the city. This section shall not apply to energy or capacity sold, transmitted, or delivered by the city or pursuant to a valid city franchise. Nothing in this section shall prohibit sale of energy or capacity by an electric utility to another electric utility for later resale or transmission to consumers or end users (i.e., wholesale sale, delivery or transmission), or transmission of electric energy through the city without delivery, sale, or transmission to consumers or end users for use within the city. This section shall not apply to the purchase or sale of electric energy or capacity from or by an energy service provider registered with the city and operating pursuant to Section
14.24.270, and transmitted or delivered by the city. The sale of electric energy or capacity by electric service providers other than the city to ultimate consumers or end users for use within the city shall be conducted in accordance with the Roseville customer choice program rules and regulations. This section shall not apply to customer-generators utilizing solar electric generation located at or on the customer generator's premises, designed to offset no more than 100 percent of the customer-generator's annual electric load located at or on that customer-generator's premises. Such generation shall meet all Roseville Electric Rule 21 standards for interconnection, city policies, and state laws and regulations.
(Ord. 2087 § 1, 1988; Ord. 3430 § 3, 1999; Ord. 5266 § 4, 2013)
It is unlawful for any customer or person to utilize within
the city electric energy which is received from any source other than
the city electric utility, a utility having a valid city electric
franchise applicable for service to that person, an energy service
provider registered with the city and authorized to provide electric
energy to that person, or which that customer-generator provides for
him or herself in accordance with Roseville Electric Rule 21 standards
for interconnection, city policies and state laws and regulations.
(Ord. 2087 § 2, 1988; Ord. 3430 § 3, 1999; Ord. 5266 § 5, 2013)
The city manager is authorized to develop and implement a customer
choice program to offer electric customers direct access to generation
services.
(Ord. 3430 § 4, 1999)