(A)
No connection to the City sewer system shall be made until the connection has been approved by the Director of Utilities. The owner of the premises to be served shall provide all information required by the Director of Utilities, supplemented by any plans, specifications, or other information which, in the judgment of the Director of Utilities, is pertinent to the location and use of the premises. Separate connections may be required for each building of a single premises or for separation of industrial wastewater from sanitary sewage
(B)
The wastewater discharge permit shall be issued upon final inspection and acceptance of construction of the connection and, when required, upon the application and issuance of a wastewater discharge permit.
(Ord. 3895 § 3, 2008)