A chemical toilet or water closet shall be available on each construction site and shall remain in place until construction is completed. One such toilet or closet shall be provided for each compliment of twenty workers or fraction thereof. Such toilets or closets shall be placed no less than twenty-five feet inside any property line of the building site. Any chemical toilet shall be cleaned a minimum of one time per week. Where construction is being performed at multiple locations on a project site, such toilets shall be not more than five hundred feet apart.
(Ord. 1114 § 1, 1980)