The subdivider shall agree to make improvements installed to permanent line and grade and to the satisfaction of the City Engineer in accordance with the provisions of this title and with the specifications on file in the offices of the City Clerk, the Planning Commission, and the City Engineer, and such improvements shall be made at the expense of the subdivider. The construction and placing of public improvements shall not be commenced before the final map is approved. The improvements which the subdivider shall agree to make prior to acceptance and approval of the final subdivision map by the City Council shall include the following:
A.
Street grading, installation of curbs and gutters, provisions for drainage and construction of drainage structures necessary to the proper use and drainage of the streets and/or to the public safety and convenience;
B.
Paving of streets and alleys as required;
C.
Installation of sidewalks as required;
D.
Provision for a water system with mains of sufficient size and having a sufficient number of outlets to furnish adequate water supply for each lot of the subdivision in accordance with the standards adopted by the City and with sufficient fire hydrants, gated connections and appurtenances to provide adequate fire protection in accordance with the standards of the Fire Department of the City;
E.
Sanitary sewer facilities and connections for each lot to a sewage system approved by the City Engineer and the sanitary district concerned;
F.
An approved type of street lighting system;
G.
Planting of trees as required;
H.
Installation of street signs as required;
I.
Installation of a system of monuments and bench marks approved by the City Engineer;
J.
The payment of such fees as established by the City Council pursuant to resolution to cover the pro rata share of the cost of traffic signals as required by the City;
K.
Installation of paths and trails including directional signing.
(Ord. 143-76 § 2, 1976)