The Director shall issue a permit upon approval of a site map and grading plan, interim plan: and where required, final plan, soil report, and geology report, deposit of appropriate security and payment of fees. Permit shall be issued subject to the following conditions:
A.
The permittee shall maintain a copy of the permit, approved plans and reports required under Section 21.12.020 on the worksite and available for public inspection during all working hours;
B.
The permittee shall, at all times, be in conformity with approved site map and grading plan, interim and final plans.
(Ord. 202-81 § 1, 1981)