The applicant should provide a financial guarantee to the Borough
for the timely installation and proper construction of all stormwater
management controls as required by the approved stormwater plan and
this chapter equal to the full construction cost of the required controls
as required by the approved SWM Site Plan and this chapter in accordance
with the provisions of Sections 509, 510, and 511 of the Pennsylvania
Municipalities Planning Code.