The work of constructing, laying, replacing, maintaining, repairing or removing all pipelines and appurtenances authorized under the provisions of this chapter in, over, under, along or across any street shall be conducted with the least possible hindrance to the use of the street for purposes of travel. As soon as such work is completed, all portions of the street which have been excavated or otherwise damaged thereby shall promptly and in a workmanlike manner be repaired, replaced or restored and placed in as good condition as before the commencement of such work and shall be done to the satisfaction of the Director at the expense of the franchisee, and in accordance with the terms and conditions of any City ordinance, resolution or regulation. For streets that have been rehabilitated within three years prior to the proposed work, the City shall require the resurfacing, or other treatment, of the entire lane widths of the street as directed by the Director. For those streets that have not been rehabilitated by the City within three years prior to the proposed work, the restoration shall be in full compliance with City requirements. All restoration, repair or replacement work shall be done to the satisfaction of the Director at the expense of the franchisee in accordance with all applicable law. In the event that the franchisee shall fail or neglect to make such highway repair, replacement or restoration work, 10 days after notice therefor has been given franchisee by the Director, the City may repair, replace or restore said highway at the expense of franchisee. Franchisee agrees to pay to the City the cost of performing such work. The amount so chargeable shall be the direct cost of such work plus the current rate of overhead being charged by the City for reimbursable work.
(2319-10/78, 3889-9/10)