Plans submitted for plan review prior to the effective date
of the new permit fee ordinance may be issued under the old permit
fee schedule for 90 days. After the 90 day grace period, all permits
will be issued under the new permit fee schedule.
|
Total Valuation2
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 2,000.00
|
$290.00 (2.5 hourly units)
|
$2,000.01 to 100,000.00
|
$290.00 + (0.02186 x valuation2 exceeding
$2,000.00)
|
$100,000.01 and greater
|
$2,432.28 + (0.00973 x valuation2 exceeding $100,000.00)
|
Total Valuation2, 3
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$406.00 (3.5 hourly units)
|
$1,000.01 to 2,000.00
|
$638.00 (5.5 hourly units)
|
$2,000.01 to 50,000.00
|
$638.00 + (0.03792 x valuation2, 3 exceeding $2,000.00 to $50,000.00)
|
$50,000.01 to 500,000.00
|
$2,458.16 + (0.02085 x valuation2, 3 exceeding $50,000.00 to $500,000.00)
|
$500,000.01 to 20,000,000.00
|
$11,840.66 + (0.01112 x valuation2, 3 exceeding $500,000.00 to $20,000,000.00)
|
$20,000,000.01 to 40,000,000.00
|
$228,680.66 + (0.007418 x valuation2, 3 exceeding $20,000,000.00 to 40,000,000.00)
|
$40,000,000.01 to 100,000,000.00
|
$377,040.66 + (0.003512 x valuation2, 3 exceeding $40,000,000.00 to 100,000,000.00)
|
Greater than $100,000,000.00
|
$587,760.66 + (0.002279 x valuation2, 3 exceeding $100,000,000.00)
|
1
|
Total building permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
3
|
The portion of the valuation allocable to permanent equipment
for buildings in Section 16.90.030(A)(2) shall be calculated using
the following schedule:
|
Actual Permanent Equipment Value
|
Valuation Used
|
---|---|
Up to $5,000,000
|
100% of actual equipment value
|
$5,000,001 to 10,000,000
|
75% of actual equipment value
|
$10,000,001 to 20,000,000
|
50% of actual equipment value
|
Over $20,000,000
|
25% of actual equipment value
|
Total Valuation
|
Plan Review Fee (minimum fee based on current hourly BI-II rate)
|
---|---|
$40,000,000.01 to 100,000,000.00
|
$150,872.26 + (0.000514 x valuation2, 3 exceeding $40,000,000.00 to 100,000,000.00)
|
Greater than $100,000,000.00
|
$181,712.26 + (0.000022 x valuation2, 3 exceeding $100,000,000.00)
|
2
|
Rounded up to the next multiple of $1,000.00.
|
3
|
The portion of the valuation allocable to permanent equipment
for buildings in Section 16.90.030(A)(2) shall be calculated using
the following schedule:
|
Actual Permanent Equipment Value
|
Valuation Used
|
---|---|
Up to $5,000,000
|
100% of actual equipment value
|
$5,000,001 to 10,000,000
|
75% of actual equipment value
|
$10,000,001 to 20,000,000
|
50% of actual equipment value
|
Over $20,000,000
|
25% of actual equipment value
|
Total Valuation2
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$116.00 equal to 1 hour at current BI-II rate
|
$1,000.01 to 10,000.00
|
$116.00 + (0.02224 x valuation2 exceeding
$1,000.00 to $10,000.00)
|
$10,000.01 and greater
|
$316.16 + (0.01390 x valuation2 exceeding
$10,000.00)
|
Total Valuation2
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$174.00 equal to 1.5 hours at current BI-II rate
|
$1,000.01 to 10,000.00
|
$174.00 + (0.02855 x valuation2 exceeding
$1,000.00 to $10,000.00)
|
$10,000.01 and greater
|
$430.95 + (0.01390 x valuation2 exceeding
$10,000.00)
|
Total Valuation2
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$116.00 x 50% equal to 1 hour at current BI-II rate
|
$1,000.01 to 10,000.00
|
($116.00 + (0.02224 x valuation2 exceeding
$1,000.00 to $10,000.00)) x 50%
|
$10,000.01 and greater
|
($316.16 + (0.01390 x valuation2 exceeding
$10,000.00)) x 50%
|
Total Valuation2
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$232.00 x 50% equal to 2 hours at current BI-II rate
|
$1,000.01 to 10,000.00
|
($232.00 + (0.02224 x valuation2 exceeding
$1,000.00 to $10,000.00)) x 50%
|
$10,000.01 and greater
|
($432.16 + (0.01390 x valuation2 exceeding
$10,000.00)) x 50%
|
1
|
Total building permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
Actual Permanent Equipment Value
|
Valuation Used to Calculate the Fees
|
---|---|
Up to $5,000,000
|
100% of actual equipment value
|
$5,000,001 to 10,000,000
|
5,000,000 + (75% of the actual equipment valuation between 5
and 10,000,000)
|
$10,000,001 to 20,000,000
|
8,750,000 + (50% of the actual equipment valuation between 10
and 20,000,000)
|
Over $20,000,000
|
13,750,000 + (25% of actual equipment value > 20,000,000)
|
Total Valuation2
|
Fee1 (minimum fee based on current
hourly BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$104.40 (0.9 hourly units)
|
$1,000.01 to 10,000.00
|
$104.40 + (0.025 x valuation2 exceeding
$1,000.00 to $10,000.00)
|
$10,000.01 and greater
|
$329.40 + (0.015 x valuation2 exceeding
$10,000.00)
|
1
|
Total permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
$1.00 to 2,000.00
|
$208.80 (1.8 hourly units)
|
$2,000.01 to 10,000.00
|
$208.80 + (0.025 x valuation2 exceeding
$2,000.00 to $10,000.00)
|
$10,000.01 and greater
|
$408.80 + (0.015 x valuation2 exceeding
$10,000.00)
|
1
|
Total permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
$1.00 to 3,000.00
|
$313.20 (2.7 hourly units)
|
$3,000.01 to 10,000.00
|
$313.20 + (0.025 x valuation2 exceeding
$3,000.00 to $10,000.00)
|
$10,000.01 and greater
|
$488.20 + (0.015 x valuation2 exceeding
$10,000.00)
|
1
|
Total permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
$1.00 to 5,000.00
|
$348.00 (minimum 3 hourly units)
|
$5,000.01 and greater
|
$348.00 + (0.02 x valuation2 exceeding $5,000.00)
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
All Sign Sizes/Values
|
$290.00 (2.5 hourly units)
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
All Sign Sizes
|
$174.00 (1.5 hourly units)
|
1
|
Total permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$232.00 (2.0 hourly units)
|
$1,000.01 to 10,000.00
|
$232.00 + (0.02365 x valuation2 exceeding
$1,000.00 to 10,000.00)
|
$10,000.01 and greater
|
$444.85 + (0.01947 x valuation2 exceeding
$10,000.00)
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
$1.00 to 1,000.00
|
$348.00 (3.0 hourly units)
|
$1,000.01 to 10,000.00
|
$348.00 + (0.02000 x valuation2 exceeding
$1,000.00 to 10,000.00)
|
$10,000.01 and greater
|
$528.00 + (0.01947 x valuation2 exceeding
$10,000.00)
|
Total Valuation2
|
Fee1 (minimum fee based on hourly
BI-II rate)
|
---|---|
$1.00 to 2,000.00
|
$290.00 (2.5 hourly units)
|
$2,000.01 and greater
|
$290.00 + (0.01947 x valuation2 exceeding
$2,000.00)
|
1
|
Total permit fee.
|
2
|
Rounded up to the next multiple of $1,000.00.
|
Application and inspection fee (minimum 3.5 hourly units)
|
$406.00
|
System Size - Kilowatts
|
Solar Fees (minimum fee based on hourly BI-II rate)
|
---|---|
1 kW to 8 kW
|
$232.00 for 1 kW plus $35.00 for each additional system kW up
to 8 kW (2 hourly units)
|
9 kW to 15 kW
|
$477.00
|
16 kW and greater
|
$477.00 plus $15.00 per additional kW over 15kW
|
System Size - Kilowatts
|
Solar Fees (minimum fee based on hourly BI-II rate)
|
---|---|
1 to 17 kW
|
$348.00 for 1 kW plus $35.00 for each additional system kW up
to 17 kW (3 hourly units + $35.00 per kW)
|
18 kW to 50 kW
|
$943.00
|
51 kW and above (up to 250 kW)
|
$943.00 plus $7.00 for each additional system kW up to 250 kW
|
251 kW and greater
|
$2,343.00 plus $5.00 for each additional system kW over 250kW
|
System Size - Kilowatts
|
Fee (minimum fee based on current hourly BI-II rate)
|
---|---|
1 to 10 kW
|
$812.00 (7 hourly units)
|
11 kW to 1.0 MW
|
$812.00 + 1 hourly unit for each additional 10 kW or portion
thereof
|
1 MW and greater
|
$12,296.00 + 25 hourly units for each additional MW or portion
thereof
|
Reroofs (fee based on 3 square increments):
|
Hourly Unit Rate ($116.00)
| ||||
---|---|---|---|---|---|
Add 0.2 units per 3 Square
|
Add 0.12 unit per 3 Square (35 & above)
|
Add 0.08 units per 3 Square (61 & above)
| |||
Squares
|
Total Fee
|
Squares
|
Total Fee
|
Squares
|
Total Fee
|
1 to 10 (base fee of 1.5 fee units)
|
$174.00
|
35 to 37
|
$373.52
|
62 to 64
|
$494.16
|
11 to 13
|
$197.20
|
38 to 40
|
$387.44
|
65 to 67
|
$503.44
|
14 to 16
|
$220.40
|
41 to 43
|
$401.36
|
68 to 70
|
$512.72
|
17 to 19
|
$243.60
|
44 to 46
|
$415.28
|
71 to 73
|
$522.00
|
20 to 22
|
$266.80
|
47 to 49
|
$429.20
|
74 to 76
|
$531.28
|
23 to 25
|
$290.00
|
50 to 52
|
$443.12
|
77 to 79
|
$540.56
|
26 to 28
|
$313.20
|
53 to 55
|
$457.04
|
80 to 82
|
$549.84
|
29 to 31
|
$336.40
|
56 to 58
|
$470.96
|
83 to 85
|
$559.12
|
32 to 34
|
$359.60
|
59 to 61
|
$484.88
|
86 to 88
|
$568.40
|
(Reroof permit fees do not include fees for structural repairs
or additional roof work.)
|
|
Units
|
Fee
|
---|---|---|
HVAC replacement (includes electrical disconnect)
| ||
Split system or rooftop
|
3
|
$348.00
|
Package/ground
|
2.5
|
$290.00
|
Condenser only, furnace only or wall-mount heater
|
2
|
$232.00
|
Add 1/2 hour for each of the following:
|
|
|
New/replaced ducting system
|
0.5
|
$58.00
|
New/replaced gas piping
|
0.5
|
$58.00
|
New/replaced electrical branch circuit
|
0.5
|
$58.00
|
2nd HVAC system on same property and same permit
|
Fee at 50% of above calculation
| |
Water Heater
| ||
Gas or electric replacement
|
0.71
|
$83.00
|
New cut-in or replacement with change in energy source
|
0.9
|
$104.40
|
New tankless water heater
|
0.9
|
$104.40
|
2nd water heater on same permit
|
0.5
|
$58.00
|
Electric Panels
| ||
200 amp (& less) single phase replacement
|
1.0
|
$116.00
|
Additional distribution panel
|
0.5
|
$58.00
|
Panel repair (such as a breaker replacement)
|
1
|
$116.00
|
Issuance of each supplemental permit (permit change)
|
$116.00 (1 hourly unit)
|
Inspection outside of normal business hours1
|
Directly billed based upon current labor rates with 3 hourly
unit minimum
|
Inspections for which no fee is specifically indicated3
|
Directly billed based upon current labor rates
|
Each re-inspection
|
$174.00 (based on 1.5 hourly units)
|
Administrative fee, temporary certificate of occupancy
|
$232.00 (based on 2 hourly units)
|
Issuance of duplicate certificate of occupancy
|
$116.00 (minimum of 1 hourly unit plus research time)
|
Permit research and written responses
|
Directly billed based upon current labor rates
|
Additional plan review required by changes, additions, or revisions
to approved plans2
|
Directly billed based upon current labor rates
|
Plan review for miscellaneous permits2
|
Directly billed based upon current labor rates
|
Boundary adjustment reviews2
|
Directly billed based upon current labor rates
|
Pre-application building reviews
|
Directly billed based upon current labor rates
|
Un-finaled permit investigations2
|
Directly billed based upon current labor rates
|
Expedited plan reviews
|
Normal plan review fees plus directly billed based upon current
labor rates
|
Filing fee for Building Board of Appeals
|
$500.00
|
Filing fee for Joint City/County Disabilities Appeals Board
|
$250.00
|
Abatement of building code violation(s)3
|
Directly billed based upon current labor charges plus all other
associated costs to abate the violation including, but not limited
to, fencing, board-up, repair, demolition, mailings, postings, recordings,
appeals, Hearing Officer costs, inspection warrants, attorneys' fees,
administrative costs and collection costs
|
Scan fee for approved plans and submittal documents
|
Electronic copies of all approved plan pages and documents shall
be provided to the County of Sacramento Building Permits and Inspection
by the applicant. The electronic submittal will be in a standard PDF
format on acceptable electronic media. If the applicant chooses to
have the County scan all documents into our records, a charge of $5.00
per plan page for paper larger than 11″ x 17″; $1.00 for 8.5″ x 14″
and/or 1″1 x 17″ and $0.50 per standard 8.5″ x 11″ document page will
be charged
|
1
|
Minimum charge: Three hours.
|
2
|
Minimum charge: One-half hour.
|
3
|
Minimum charge: One hour.
|