[Ord. 423, 3/15/2005]
1.
Completed application for certificate of appropriateness.
2.
Completed building permit and/or zoning permit application when applicable.
3.
The following items may be required at the discretion of the Historic Building Inspector:
A.
Photographs of existing building or structure affected by proposed exterior work and photographs of adjacent buildings and/or structures.
B.
Plans, elevations, details and other descriptive drawings of proposed work at minimum ¼ inch=1 foot 0 inch scale.
C.
Material and product data indicating nature of new materials proposed.
D.
Samples of proposed new and/or replacement materials. (Samples shall be brought by applicant to HARB meeting.)
E.
Claim of economic hardship with required support information.