The following statements, documents and other data, and as many additional copies thereof as may be required, shall be filed with the final map:
A. The names, addresses and telephone numbers of the record owners and subdivider and persons preparing the final map;
B. A guarantee of title or letter from a title company certifying that the signatures of all persons whose consent is necessary to pass a clear title to the land being subdivided and all acknowledgments thereto appear and are correctly shown on the proper certificates and are correctly shown on the final map, both as to consents for the making thereof and the affidavit of dedication;
C. A traverse sheet in a form approved by the town engineer giving lot areas, latitudes, departures and coordinates and showing the mathematical closures;
D. The engineer or surveyor under whose supervision the survey has been made shall furnish the town engineer field notes as required by Chapter
14.40 (Surveys and Monuments);
E. The complete plans, profiles, cross sections, specifications and applicable permits for the construction and installation of improvements as required by Chapter
14.44;
F. A finished grading plan. Submission of a finished grading plan may be waived by the town engineer when he determines that the submission of said plan is not required for proper grading, flood hazard mitigation and erosion control of the subdivision;
G. The agreement to make improvements and the security for such improvements as required by Chapter
14.44;
H. All protective covenants, conditions, restrictions or affirmative obligations in the form in which the same are to be recorded when approval thereof by an attorney of the town has been required as a condition of approval of the tentative map;
I. 1. Any offer of dedication by separate instrument and accompanying title report as may be provided or required as a condition of approval of the tentative map. The dedication instrument and title report shall conform to the requirements of Section
14.24.060 and shall be processed in accordance with the provisions of Section
14.28.110 that relate to instruments of dedication and accompanying title reports;
2. Whenever an offer of dedication by separate instrument accompanies a final map, the final map shall not be accepted for filing by the town engineer unless such offer of dedication has been approved for recordation as provided in Section
14.28.110;
J. All other data required by law or as a condition of approval of the tentative map, including plans, reports, agreements, permits, fees, security or other requirements;
K. A petition signed by a minimum of seventy percent of owners of the proposed project requesting formation of a benefit assessment district to maintain repair and replace in perpetuity the public improvements intended for town acceptance for maintenance.
(Ord. 185 § 1, 1998; Ord. 214, 2004)