[Ord. No. 246, 10/11/2023]
1. 
The Township Engineer or his designee shall inspect all phases of the installation of the permanent stormwater management facilities as deemed appropriate by the Township Engineer.
2. 
During any stage of the work, if the Township Engineer or his designee determines that the permanent stormwater management facilities are not being installed in accordance with the approved drainage plan, the Township may revoke any existing permits or other approvals and issue a cease-and-desist order until a revised drainage plan is submitted and approved, as specified in this Part.
3. 
A final inspection of all stormwater management facilities shall be conducted by the Township Engineer or his designee and to confirm compliance with the approved drainage plan prior to the issuance of any occupancy permit.