After the approval or conditional approval of a tentative parcel
map and prior to the expiration of such map, a subdivider may cause
the real property included within the tentative parcel map, or any
part thereof, to be subdivided by complying with the procedures contained
in this chapter.
(Ord. 87-10)
The parcel map shall be prepared by or under the direction of
a registered civil engineer or licensed land surveyor, shall show
the location of streets and property lines bounding the property and
shall conform to all of the following provisions:
A. The
provisions of Section 66445 of the Act.
B. Shall
be based upon a field survey made in conformity with the Land Surveyors
Act.
(Ord. 87-10)
A parcel map shall be processed in accordance with the procedure made applicable to final map by Chapter
24.54.
(Ord. 87-10)