Final Map (Potable)
|
$2,150.00
|
Parcel Map or Misc. Improvements (Potable)
|
$1,700.00
|
Encroachment
|
$650.00
|
Quitclaim
|
$665.00
|
Vacation
|
$1,000.00
|
Easement
|
$665.00
|
Engineers Cost Estimate $50,000 or Less
|
10% of Approved Engineers Cost Estimate
|
$2,500 per Water Main Shutdown
| |
$1,500 per Recycled Water Inspection
| |
$1,500 per County Health Department Inspection
| |
Night Work @ 1.5 X Hourly Rate
| |
Sunday/Holiday Work @ 2.0 X Hourly Rate
| |
Engineers Cost Estimate Greater than $50,000
|
$5,000 + 3% of Approved Engineers Cost Estimate
|
$2,500 per Water Main Shutdown
| |
$1,500 per Recycled Water Inspection
| |
$1,500 per County Health Department Inspection
| |
Night Work @ 1.5 X Hourly Rate
| |
Sunday/Holiday Work @ 2.0 X Hourly Rate
|
Installation of Recycled Water Meter (all sizes)
|
Time and Materials
|
Recycled Water Plan Check – Miscellaneous
|
$ 875.00
|
Reduce 1″ to 3/4″
|
$500.00
|
Reduce 1 1/2″ to 3/4″
|
$665.00
|
Reduce 1 1/2″ to 1″
|
$675.00
|
Reduce 2″ to 3/4″
|
$575.00
|
Reduce 2″ to 1″
|
$715.00
|
Reduce 2″ to 1 1/2″
|
$1,025.00
|
*
|
Meter Reductions for meters larger than 2″ will require
a deposit and will be billed on a time and materials basis.
|
With Existing 3/4″ or 1″ Service
|
$875.00
|
With Existing 3/4″ Service**
|
$4,875.00
|
With Existing 1″ Service
|
$1,635.00
|
*
|
A dual water meter is a 3/4″ water meter for domestic
use and a 1″ water meter for fire sprinklers.
|
**
|
An existing 3/4″ water service will be upgraded to a
1″ copper water service by District forces.
|
With Existing 3/4″ Service*
|
$9,624.00**
|
With Existing 1″ Service
|
$6,374.00**
|
*
|
An existing 3/4″ water service will be upgraded to a
1″ copper water service by District forces.
|
**
|
Cost includes installation fee, SDWD capacity fee and SDCWA
capacity fee.
|
With Additional Work
|
$1,025.00
|
Stand Alone
|
$2,000.00
|
Residential
|
Time and Materials
|
Commercial
|
Time and Materials
|
2″ or Smaller
|
Time and Materials
|
4″ or Larger
|
Time and Materials
|
2″ or Smaller
|
$660.00
|
4″ or Larger
|
$1,265.00
|
Meter Deposit
Water Deposit
Installation Fee*
TOTAL
|
$1,000.00
$250.00
$200.00
$1,450.00
|
*
|
Non-refundable fee.
|
**
|
Additional charges of $ 125.00 will be applied to relocate the
construction meter.
|
Size (Inches)
|
Installation Charges
|
SDWD Capacity Fees
|
CWA Capacity Fees
|
TOTAL
|
---|---|---|---|---|
3/4
|
$4,250.00
|
$3,300.00
|
$5,448.00
|
$12,998.00
|
3/4 – 1*
|
$4,875.00
|
$3,300.00
|
$5,448.00
|
$13,623.00
|
1
|
$4,375.00
|
$5,280.00
|
$8,717.00
|
$18,372.00
|
1 1/2
|
$5,600.00
|
$9,900.00
|
$16,344.00
|
$31,844.00
|
2
|
$5,650.00
|
$17,160.00
|
$28,329.00
|
$51,139.00
|
3**
|
|
$31,680.00
|
$52,301.00
|
|
4**
|
|
$54,120.00
|
$89,347.00
|
|
6**
|
|
$99,000.00
|
$163,440.00
|
|
8**
|
|
$171,600.00
|
$283,296.00
|
|
10**
|
|
$257,400.00
|
$424,944.00
|
|
*
|
3/4 – 1 is a dual water meter (3/4″ water meter
for domestic use and a 1″ water meter for fire sprinklers).
|
**
|
Installation of water meters larger than 2″ will require
a deposit and will be billed on a time and materials basis.
|
Updated SDCWA Capacity Fees 01/01/2020, Updated SDWD Fees and
Deposits 10/01/2019 Page 3 of 4
|
Size (Inches)
|
Installation Charges
|
SDWD Capacity Fees
|
CWA Capacity Fees
|
TOTAL
|
---|---|---|---|---|
3/4
|
$525.00
|
$3,300.00
|
$5,448.00
|
$9,273.00
|
3/4 – 1*
|
$925.00
|
$3,300.00
|
$5,448.00
|
$9,673.00
|
1
|
$650.00
|
$5,280.00
|
$8,717.00
|
$14,647.00
|
1 1/2
|
$935.00
|
$9,900.00
|
$16,344.00
|
$27,179.00
|
2
|
$1,185.00
|
$17,160.00
|
$28,329.00
|
$46,674.00
|
3**
|
|
$31,680.00
|
$52,301.00
|
|
4**
|
|
$54,120.00
|
$89,347.00
|
|
6**
|
|
$99,000.00
|
$163,440.00
|
|
8**
|
|
$171,000.00
|
$283,296.00
|
|
10**
|
|
$257,400.00
|
$424,944.00
|
|
*
|
3/4 – 1 is a dual water meter (3/4″ water meter
for domestic use and a 1″ water meter for fire sprinklers).
|
**
|
Installation of water meters larger than 2″ will require
a deposit and will be billed on a time and materials basis.
|