The charge for providing a hydraulic analysis will be billed on a time and materials basis, with a minimum deposit of $ 2,577.00.
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
Upon submitting the first set of plans to the District.
Parcel Maps (Per Water Sheet)
$1,222.00
Improvements Plans (Per Water Sheet)
$770.00
Grading/Building Plans and Conflict Check (Per Water Sheet)
$155.00
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
Charges for inspection will be billed on a time and materials basis.
Engineers Cost Estimate $50,000 or Less
10% of Approved Engineers Cost Estimate
$2,592 per Water Main Shutdown
$1,555 per Recycled Water Inspection
$1,555 per County Health Department Inspection
Night Work @ 1.5 X Hourly Rate
Sunday/Holiday Work @ 2.0 X Hourly Rate
Engineers Cost Estimate Greater than $50,000
$5,185 + 3% of Approved Engineers Cost Estimate
$2,592 per Water Main Shutdown
$1,555 per Recycled Water Inspection
$1,555 per County Health Department Inspection
Night Work @ 1.5 X Hourly Rate
Sunday/Holiday Work @ 2.0 X Hourly Rate
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
A deposit will be required for a fire flow test. The deposit will be based upon the job estimate. The payment does not guarantee that a test will be taken. If it is determined that due to restrictions at the site no test can be taken, the District will return the deposit.
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024)
Installation of Recycled Water Meter (all sizes)
Time and Materials
Recycled Water Plan Check – Miscellaneous
$1,690.00
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
Reduce 1″ to 3/4″
$705.00
Reduce 1 1/2″ to 3/4″
$767.00
Reduce 1 1/2″ to 1″
$751.00
Reduce 2″ to 3/4″
$1,192.00
Reduce 2″ to 1″
$1,068.00
Reduce 2″ to 1 1/2″
$1,928.00
*
Meter Reductions for meters larger than 2″ will require a deposit and will be billed on a time and materials basis.
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024)
With Existing 3/4″ Service**
$7,585.00
With Existing 1″ Service
$2,198.00
*
A dual water meter is a 3/4″ water meter for domestic use and a 1″ water meter for fire sprinklers.
**
An existing 3/4″ water service will be upgraded to a 1″ copper water service by District forces.
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
With Additional Work
$1,918.00
Stand-Alone
$3,142.00
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
Description
INDEX
Current Fee
Fees As Of 7/1/2025
Variance
Installation Fee
CCI
$250.00
$259.00
$9.00
Relocation Fee
CCI
$165.00
$171.00
$6.00
Construction Hydrant Rental Fee (Monthly)
CCI
$82.00
$85.00
$3.00
(Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
The following charge will be paid at the time of application for service.
A. 
INSTALLATION OF POTABLE WATER METER (SERVICE INSTALLED BY DISTRICT)**:
Installation of Potable Water Meter (Service Installed by District)**
Description
INDEX
Current Fee
Fees As Of 7/1/2025
Variance
3/4-inch Meter
CCI
$6,465.00
12 feet or less
$4,650.00
>12 feet and <32 feet
$7,750.00
>32 feet or Trench Moratorium, Concrete Street)
Deposit - Minimum $12,000
3/4-inch to 1-inch Dual Meter
CCI
$7,315.00
12 feet or less
$5,500.00
>12 feet and <32 feet
$8,600.00
>32 feet or Trench Moratorium, Concrete Street)
Deposit - Minimum $12,000
1-inch Meter
CCI
$6,756.00
12 feet or less
$4,950.00
>12 feet and <32 feet
$8,050.00
>32 feet or Trench Moratorium, Concrete Street
Deposit - Minimum $12,000
1.5-inch Meter
CCI
$9,180.00
12 feet or less
$7,365.00
>12 feet and<l32 feet
$10,465.00
>32 feet or Trench Moratorium, Concrete Street
Deposit - Minimum $15,000
2-inch Meter*
CCI
$9,030.00
12 feet or less
$7,215.00
>12 feet and <32 feet
$10,315.00
>32 feet or Trench Moratorium, Concrete Street
Deposit - Minimum $15,000
Notes:
*
Installation of water meters larger than 2" will require a deposit and will be billed on a time and materials basis.
**
Distances shall be based on GIS, Record Drawings, or Field Verification if Required.
B. 
INSTALLATION OF POTABLE WATER METER (SERVICE INSTALLED BY DEVELOPER):
Installation of Potable Water Meter (Service Installed by Developer)
Description
INDEX
Current Fee
Fees As Of 7/1/2025
Variance
3/4-inch Meter
CCI
$805.00
$834.00
$29.00
3/4-inch with 1-inch Fire Dual Meter
CCI
$1,160.00
$1,202.00
$42.00
1-inch Meter
CCI
$850.00
$881.00
$31.00
1.5-inch Meter
CCI
$1,300.00
$1,348.00
$48.00
2-inch Meter*
CCI
$2,040.00
$2,115.00
$75.00
Notes:
*
Installation of water meters larger than 2" will require a deposit and will be billed on a time and materials basis.
(Res. No. 2020-02, adopted 5/20/20; Res. No. 2024-02, 3/20/2024, eff. July 1, 2024; Res. No. 2025-04, 4/16/2025, eff. July 1, 2025)
Description
INDEX
Current Fee
Fees As Of 7/1/2025
Variance
1 unit
CPI
$50.00
$51.00
$1.00
2 units, 1 meter
CPI
$50.00
$51.00
$1.00
3 units, 1 meter
CPI
$50.00
$51.00
$1.00
4 units, 1 meter
CPI
$50.00
$51.00
$1.00
5 or more units, 1 meter
CPI
$50.00
$51.00
$1.00
2 meters, one property
CPI
$50.00
$51.00
$1.00
Agricultural & Combination Meters
CPI
$50.00
$51.00
$1.00
(Res. No. 2025-04,4/16/2025, eff. July 1, 2025)