This chapter shall be known and may be cited as the "Whitehall Township Stormwater Management Ordinance," which satisfies regulatory requirements of the NPDES MS4 program as well as Act 167 requirements for the "Whitehall Township Watersheds." For purposes of this chapter, Whitehall Township Watersheds shall include the following:
A. 
Catasauqua Creek Watershed and Lehigh River Subbasin 4;
B. 
Coplay Creek Watershed and Lehigh River Subbasin 2;
C. 
Jordan Creek Watershed;
D. 
Bushkill Creek, Catasauqua Creek, Coplay Creek, Fry's Run, Hokendauqua Creek, Jordan Creek, Martins/Jacoby Creeks, Monocacy Creek, Nancy Run, Saucon Creek, Trout/Bertsch Creeks; and any future watershed adopted by the Township.
The Whitehall Township Board of Commissioners finds that:
A. 
Inadequate management of accelerated runoff of stormwater resulting from development throughout a watershed increases runoff volumes, flows and velocities, contributes to erosion and sedimentation, overtaxes the carrying capacity of streams and storm sewers, greatly increases the cost of public facilities to carry and control stormwater, undermines floodplain management and flood control efforts in downstream communities, reduces groundwater recharge, threatens public health and safety, and increases nonpoint source pollution of water resources.
B. 
A comprehensive program of stormwater management (SWM), including reasonable regulation of development and activities causing accelerated runoff, is fundamental to the public health, safety, and welfare and the protection of people of the commonwealth, their resources, and the environment.
C. 
Stormwater is an important water resource that provides groundwater recharge for water supplies and supports the base flow of streams.
D. 
The use of green infrastructure and low-impact development (LID) are intended to address the root cause of water quality impairment by using systems and practices which use or mimic natural processes to 1) infiltrate and recharge; 2) evapotranspire; and/or 3) harvest and use precipitation near where it falls to earth. Green infrastructure practices and LID contribute to the restoration or maintenance of predevelopment hydrology.
E. 
Federal and state regulations require certain municipalities to implement a program of stormwater controls. These municipalities are required to obtain a permit for stormwater discharges from their separate storm sewer systems under the National Pollutant Discharge Elimination System (NPDES) program.
F. 
Nonstormwater discharges to municipal separate storm sewer systems can contribute to pollution of waters of the commonwealth by the municipality.
The purpose of this chapter is to promote health, safety, and welfare within Whitehall Township and the Whitehall Township Watersheds by minimizing the harms and maximizing the benefits described in § 26-2 of this chapter, through provisions designed to:
A. 
Meet legal water quality requirements under state law, including regulations at 25 Pa. Code Chapter 93, to protect, maintain, reclaim, and restore the existing and designated uses of the waters of this commonwealth.
B. 
Preserve natural drainage systems.
C. 
Manage stormwater runoff close to the source, reduce runoff volumes and mimic predevelopment hydrology.
D. 
Provide procedures and performance standards for stormwater planning and management.
E. 
Maintain groundwater recharge to prevent degradation of surface water and groundwater quality and to otherwise protect water resources.
F. 
Prevent scour and erosion of stream banks and streambeds.
G. 
Provide proper operation and maintenance of all stormwater best management practices (BMPs) that are implemented within the municipality.
H. 
Provide standards to meet NPDES permit requirements.
The municipality is empowered to regulate land use activities that affect runoff by the authority of the Act of July 31, 1968, P.L. 805, No. 247, the Pennsylvania Municipalities Planning Code,[1] as amended, and/or the Act of October 4, 1978, P.L. 864 (Act 167), 32 P.S. § 680.1 et seq., as amended, the Stormwater Management Act, and the Township Code, as amended.
[1]
Editor's Note: See 53 P.S. § 10101 et seq.
All regulated activities and all activities that may affect stormwater runoff, including land development and earth disturbance activity, are subject to regulation by this chapter, including those areas of the municipality which are located within the Whitehall Township Watersheds, as delineated on an official map available for inspection at the municipal office. A map of each Whitehall Township Watershed at a reduced scale is included in Appendix A for general reference.[1] Where necessary, NPDES Phase II regulations ensure that all of the ordinance provisions required to meet the MS4 NPDES requirements apply across the entire municipality. The following activities are defined as regulated activities and shall be governed by this chapter:
A. 
Land development.
B. 
Subdivision.
C. 
Construction of new or additional impervious surfaces (driveways, parking lots, etc.).
D. 
Construction of new buildings or additions to existing buildings.
E. 
Diversion or piping of any natural or man-made stream channel.
F. 
Installation of stormwater systems or appurtenances thereto.
G. 
Regulated earth disturbance activities.
[1]
Editor's Note: Appendix A is on file in the Township offices.
A. 
Impervious cover. Any proposed regulated activity, except those defined in § 26-5E and F, which would create 10,000 square feet or less of additional impervious cover is exempt from the drainage plan preparation provisions of this chapter. All of the impervious cover added incrementally to a site above the initial 10,000 square feet shall be subject to the drainage plan preparation provisions of this chapter. If a site has previously received an exemption and is proposing additional development such that the total impervious cover on the site exceeds 10,000 square feet, the total impervious cover on the site proposed since the original ordinance date must meet the provisions of this chapter.
(1) 
The date of the municipal ordinance adoption of the original Delaware River Subbasins and Lehigh River Subbasins Watershed Act 167 Stormwater Management Plan Water Quality Update, dated April 2006, shall be the starting point from which to consider tracts as "parent tracts" in which future subdivisions and respective impervious area computations shall be cumulatively considered.
(2) 
For development taking place in stages, the entire development plan must be used in determining conformance with these criteria.
(3) 
Additional impervious cover shall include, but not be limited to, additional indoor living spaces, decks, patios, garages, driveways, storage sheds and similar structures, any roof, parking or driveway areas and any new streets and sidewalks constructed as part of or for the proposed regulated activity.
(4) 
Any additional areas proposed to initially be gravel, crushed stone, porous pavement, etc., shall be assumed to be impervious for the purposes of comparison to the exemption criteria. Any existing gravel, crushed stone or hard packed soil areas on a site shall be considered as pervious cover for the purpose of exemption evaluation.
B. 
Prior drainage plan approval. Any regulated activity for which a drainage plan was previously prepared as part of a subdivision or land development proposal that received preliminary plan approval from the municipality prior to the effective date of this chapter is exempt from the drainage plan preparation provisions of this chapter, except as cited in § 26-6C, provided that the approved drainage plan included design of stormwater facilities to control runoff from the site currently proposed for regulated activities consistent with ordinance provisions in effect at the time of approval and the approval has not lapsed under the Municipalities Planning Code.[1] If significant revisions are made to the drainage plan after both the preliminary plan approval and the effective date of this chapter, preparation of a new drainage plan, subject to the provisions of this chapter, shall be required. Significant revisions would include a change in control methods or techniques, relocation or redesign of control measures or changes necessary because soil or other conditions are not as stated on the original drainage plan.
[1]
Editor's Note: See 53 P.S. § 10101 et seq.
C. 
These exemptions shall not relieve the applicant from implementing such measures as are necessary to protect health, safety, property, and state water quality requirements. These measures include adequate and safe conveyance of stormwater on the site and as it leaves the site. These exemptions do not relieve the applicant from the responsibility to secure required permits or approvals for activities regulated by any other applicable code, rule, act or ordinance.
D. 
No exemptions shall be provided for regulated activities as defined in § 26-5E and F.
Any other ordinance provision(s) or regulation of the municipality inconsistent with any of the provisions of this chapter is hereby repealed to the extent of the inconsistency only.
In the event that a court of competent jurisdiction declares any section or provision of this chapter invalid, such decision shall not affect the validity of any of the remaining provisions of this chapter.
Approvals issued and actions taken under this chapter do not relieve the applicant of the responsibility to secure required permits or approvals for activities regulated by any other code, law, regulation or ordinance.
Notwithstanding any provisions of this chapter, including exemption and waiver provisions, any landowner and any person engaged in the alteration or development of land which may affect stormwater runoff characteristics shall implement such measures as are reasonably necessary to prevent injury to health, safety or other property. Such measures shall include such actions as are required to manage the rate, volume, direction and quality of resulting stormwater runoff in a manner which otherwise adequately protects health and property from possible injury.
Any permit or authorization issued or approved based on false, misleading or erroneous information provided by an applicant is void without the necessity of any proceedings for revocation. Any work undertaken or use established pursuant to such permit or other authorization is unlawful. No action may be taken by a board, agency or employee of the municipality purporting to validate such a violation.
A. 
If the municipality determines that any requirement under this chapter cannot be achieved for a particular regulated activity, the municipality may, after an evaluation of alternatives, approve measures other than those in this chapter, subject to § 26-12B and C.
B. 
Waivers or modifications of the requirements of this chapter may be approved by the municipality if enforcement will exact undue hardship because of peculiar conditions pertaining to the land in question, provided that the modifications will not be contrary to the public interest and that the purpose of the chapter is preserved. Cost or financial burden shall not be considered a hardship. Modification may be considered if an alternative standard or approach will provide equal or better achievement of the purpose of the chapter. A request for modifications shall be in writing and accompany the stormwater management site plan submission. The request shall provide the facts on which the request is based, the provision(s) of the chapter involved and the proposed modification.
C. 
No waiver or modification of any regulated stormwater activity involving earth disturbance greater than or equal to one acre may be granted by the municipality unless that action is approved in advance by the Department of Environmental Protection (DEP) or the delegated county conservation district.