The fees required by this chapter shall at a minimum cover:
A. Administrative and clerical costs. Unless otherwise required to provide
an escrow account as part of a subdivision or land development application,
the developer shall establish an escrow account as defined in the
Township Fee Schedule and execute a professional services agreement
with the Township to cover the costs connected with drainage plan
review and inspection.
B. The review of the drainage plan, including the BMP operations and
maintenance plan, by the Township.
E. The inspection of required controls and improvements during construction.
F. The final inspection upon completion of the controls and improvements
required in the drainage plan.
G. Any additional work required to monitor and enforce any permit provisions,
regulated by this chapter, correct violations, and assure the completion
of stipulated remedial actions.
H. The Township may require an "as-built survey" of all stormwater BMPs
including a survey of any detention/retention basin prior to installation
of liner and/or topsoil as applicable, as well as basin stage storage
calculations, and an explanation of any discrepancies with the drainage
plan.