This article shall apply to new development or redsevelopment within the corporate limits of the city commencing on or after September 9, 2021.
For purposes of this section, New Development shall mean the construction of any primary structure or accessory structure, including the installation of permanent site improvements intended to support such construction on a lot that has not previously been improved with lawfully constructed structures.
For purposes of this section, Redevelopment shall mean:
A. The replatting of property that increases the number of buildable lots or otherwise increases development intensity;
B. A change from a legal nonconforming use to a conforming use;
C. The demolition of an existing structure and construction of a new structure; or
D. Any expansion of a structure that increases the building footprint or results in proposed disturbance, grading, trenching, or construction activity within the critical root zone of a protected or heritage tree.
Notwithstanding the foregoing, the removal of a protected tree or heritage tree shall require compliance with this article regardless of whether the proposed activity constitutes Redevelopment. Invasive trees or plants, as identified by the city, are not subject to protection under this article and do not require mitigation pursuant to this article.
(Ordinance 2025-O-650 adopted 1/9/2025; Ordinance 2026-O-665 adopted 4/9/2026)