As provided in Article 1 of this chapter, Planning Decision Authority, the Director, Planning Commission, and City Council have authority to act on applications for conditional use permits. Minor and major conditional use permits are established as follows:
(a) Minor Conditional Use Permits. The Director considers and makes decisions to approve, approve with conditions, or deny minor conditional use permit applications. The Director, at his or her discretion, may refer any such application for a minor conditional use permit to the Planning Commission for a decision, in which case the application shall be reviewed under the major conditional use permit procedures. Minor conditional use permits include the following:
(1) Any use in any zoning district indicated as requiring a minor conditional use permit in Article 2 of Chapter 3 of this title.
(2) A conditionally permitted use in any zoning district other than the RM zone in an existing building where the floor area is not increased by more than ten percent (10%), including cannabis manufacturing, but excluding all other uses of special concern as listed in Section
9-2.701.
(3) Exceeding limits for allowed projections above the tops of buildings pursuant to Section
9-4.202(c).
(4) Modifying features allowed in required yards pursuant to Section
9-4.301(e).
(5) Allowing required open spaces to be located in certain driveways, loading, and service areas pursuant to Section
9-4.303(a)(2)(b).
(6) Allowing off-street parking spaces to be located between the front lot line and the front wall of a building or its projection across the lot pursuant to Section
9-4.406(b)(3).
(7) Substitution, expansion, or reestablishment of certain nonconforming uses pursuant to Article 10 of Chapter 5 of this title.
(8) Preservation and reuse of a significant or residential structure pursuant to Article 12 of Chapter 5 of this title.
(9) Private property access from City parks, greenways, and other City property pursuant to Article 13 of Chapter 5 of this title.
(10) Any other use or situation indicated as requiring a minor conditional use permit in these planning regulations.
(b) Major Conditional Use Permits. A use or situation that requires a conditional use permit but does not qualify for a minor conditional use permit pursuant to subsection
(a) of this section shall be subject to a major conditional use permit. The Planning Commission considers and makes decisions to approve, approve with conditions, or deny major conditional use permit applications. A conditional use permit application that is combined with another permit application that requires Planning Commission approval shall be considered by the Planning Commission under the major conditional use permit process. A conditional use permit to demolish a significant or residential structure, pursuant to Article 12 of Chapter 5, shall be considered by the City Council under the major conditional use permit process.
(Sec. 3, Ord. 21-007, eff. Nov. 18, 2021; Sec. 3 (Exh. A) (part), Ord. 20-005, eff. May 21, 2020; Sec. 2 (Exh. A) (part), Ord. 13-001, eff. Mar. 7, 2013)