(A)
This section applies to all development or redevelopment of land that is subject to this chapter. All developers and property owners proposing development or redevelopment that require City approval shall follow the requirements in this section.
(B)
Specific projects or activities may be exempt from all or part of the informational requirements listed below.
(1)
Individual lots with land disturbance less than one acre that are developed within a larger permitted project site shall submit the following information for an individual lot plot plan prior to issuance of a site improvement permit or building permit:
(a)
A site layout for the subject lot and all adjacent lots showing building pad location, dimensions, and elevations, and the drainage patterns and swales.
(b)
Erosion and sediment control plan that, at a minimum, includes the following measures:
(i)
Installation and maintenance of a stable construction site access.
(ii)
Installation and maintenance of appropriate perimeter erosion and sediment control measures prior to land disturbance.
(iii)
Minimization of sediment discharge and tracking from the lot.
(iv)
Cleanup of sediment that is either tracked or washed onto roads. Bulk clearing of sediment shall not include flushing the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all applicable statutes and rules.
(v)
Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent surface stabilization.
(vi)
Self-monitoring program including plan and procedures.
(c)
Certification of compliance stating that the individual lot plan is consistent with the site improvement permit, as approved by the City of Angola, for the larger project.
(d)
Upon request, provide the name, address, telephone number, and list of qualifications of the trained individual in charge of the mandatory stormwater pollution prevention self-monitoring program for the project site.
(i)
The individual lot operator is responsible for installation and maintenance of all erosion and sediment control measures until the site is stabilized.
(Ord. 1751-2024)