A final plat meeting all the requirements of state law, this title, and city regulations must be submitted to the city council for approval within five years of the preliminary plat approval.
A. An applicant for a preliminary plat who files a written request with the community development director at least 45 days before the expiration of this five-year period or the one-year extension of the five-year period may be granted a one-year extension by the city council upon a showing that the applicant has attempted in good faith to submit the final plat within five years. Nothing in this section prevents the city from allowing other extensions of time, not to exceed five years, which may contain additional or altered conditions and requirements.
B. Final Plat Requirements.
1. Letter from the applicant to the community development director requesting the preliminary plat be finalized.
2. Final walk-through of the streets, utilities, and infrastructure by the city staff, owner, and contractor must be completed and approved.
3. Letter of acceptance from the city for the water/sewer system and the road/storm sewer system or other public improvements.
5. One set of as-built utility and street construction plans on a 24-inch by 36-inch four-mil single-matted mylar.
6. One AutoCAD file. Release (specified by community development director) of the as-built drawings and plat is required by the city. Must be standard AutoCAD menu, standard fonts, surveyed in accordance with Washington South (3602) State Plane (NAD 83/91) coordinates and NAVD 88 elevations, and drawn on a 1:1 scale. All changes from the original plat and construction drawings must be noted and identified.
7. One PDF file of the plat map.
8. Final plat map meeting recording standards of the office of the Benton County auditor printed on 22- by 30-inch sized sheets and shall show all courses and distances necessary to restake any portion of the plat from the map. All surrounding property shall be labeled in dotted lines whether platted or otherwise.
9. The finished plat must show the description of the property platted, acknowledgments, dedication, approval by public works director and community development director and certificate of the engineer who platted the property. All certificates must be dated when signed, e.g.:
I, ___________________________, a registered land surveyor, do hereby certify that the plat of ____________________ is based upon an actual survey and subdivision of Section _______, Township ________, Range _______, that the distances and angles are shown thereon correctly and the monuments have been set and lot corners staked on the ground as shown on the plat. |
________________________________Surveyor's Signature |
10. Official seals of attesting officers and the surveyor who platted the property shall be placed on the plat tracing.
11. The original plat map must have signature blocks for the following city officials:
b. Community development director.
12. After the plat has been approved, the original plat map shall be filed for record in the office of the Benton County auditor. A digital copy of the recorded plat map without watermark shall be provided to the community development department within 30 days of recording.
(Ord. 325 § 1, 1979; Ord. 30-93 § 1, 1993; Ord. 34-94 § 1, 1994; Ord. 13-95 § 2, 1995; Ord. 14-00 § 1, 2000; Ord. 17-18 § 1, 2018; Ord. 2-24 § 1, 2024)