“Valuation”means the determination of value made by the building official. In determining the applicable fee based on valuation, total valuation shall be determined based on current nationally recognized valuation tables, such as R.S. Means cost data publications, Dodge cost data publications or the current valuation data published by the International Conference of Building Officials. In determining the valuation for permit and plan review fees, the valuation includes the total value of all construction work for which the permit is issued, including all finish work, painting, roofing, electrical, plumbing, heating, ventilation and air conditioning, elevators, fire systems and any other permanent fixtures.
(Ord. 98-0020 § 1 (KCC 27.04.050); Ord. 99-0058 § 1)