All development proposals shall be served by a public wastewater disposal system, including both collection and treatment facilities as follows:
A. 
For the issuance of a building permit, preliminary plat approval, or other land use approval the disposal system for the project site has been approved by the Department as being consistent with adopted rules and regulations of the applicable government, agency, or district;
B. 
For the issuance of a certificate of occupancy for a building or change of use permit, the approved wastewater disposal system is installed to serve each building or lot;
C. 
For recording a final plat, final short plat or binding site plan the approved wastewater disposal system is installed or bonded to serve each lot respectively; and
D. 
For a zone reclassification the timing of installation of required wastewater system improvements is contained in the approving ordinance.
(Ord. 238 Ch. VI § 2(A), 2000; Ord. 299 § 1, 2002)
All development proposals shall be served by an adequate public water supply system as follows:
A. 
For the issuance of a building permit, preliminary plat approval or other land use approval, the applicant can demonstrate that:
1. 
The existing water supply system available to serve the site complies with the requirements of adopted rules and regulations of the applicable government, agency, or district.
2. 
The proposed improvements to an existing water system or a proposed new water supply system have been reviewed by the Department and determined to comply with the design standards and conditions specified above;
B. 
Prior to issuance of a certificate of occupancy for a building or change of use permit, the approved water system and any system improvements are installed to serve each building or lot respectively;
C. 
For recording a final plat, final short plat or binding site plan, either the approved water supply system or system improvements shall be installed or bonded to serve each lot, within two years of recording; and
D. 
For a zone reclassification the timing of installation of required water system improvements is included in the approving ordinance.
(Ord. 238 Ch. VI § 2(B), 2000; Ord. 669 § 1 (Exh. A), 2013)
All new development shall be served by adequate fire protection as set forth below:
A. 
The site of the development proposal is served by a water supply system that is consistent with the provisions of Chapter 15.05 SMC;
B. 
The development proposal has adequate access to a street system or fire lane system that provides life safety/rescue access, and other adopted fire protection requirements for buildings;
C. 
The timing of installation of required fire protection improvements for development proposals shall be stated in the project approval or approving ordinance, and installed prior to occupancy. The improvements may be secured with a bond or similar security upon approval from the Director and the Fire Marshal.
(Ord. 238 Ch. VI § 2(C), 2000; Ord. 555 § 1 (Exh. 1), 2009)