[HISTORY: Adopted by the Town Board of the Town of Marilla as indicated in section histories. Amendments noted where applicable.]
GENERAL REFERENCES
Dog license fees — See Ch. 163, Art. I.
Uniform construction codes — See Ch. 209.
Subdivision of land — See Ch. 644.
Telecommunications facilities — See Ch. 657.
Zoning — See Ch. 700.
[Adopted 3-6-1997; amended 3-8-2007; 2-25-2020]
Fees for subdivision application and review shall be as follows:
A. 
Sketch plan review fee: $10 per lot.
B. 
Preliminary plat review fee.
(1) 
Review: $15 per lot.
(2) 
Public hearing fee: $250 per hearing.
(3) 
SEQR: paid by applicant.
(4) 
Reapplication fee: $250.
C. 
Final plat review fee.
(1) 
Review: $15 per lot.
(2) 
Public hearing fee: $250 per hearing.
(3) 
Reapplication fee: $250.
D. 
Payment in lieu of open space (if permitted): $300 per lot.
E. 
All projects involving the Town Engineering Firm: cost paid by applicant.
[Adopted 3-17-1998; amended 3-8-2007; 5-12-2011 by L.L. No. 3-2011; 2-25-2020; 12-30-2025]
All Building Permits are good for 1 year. Construction started before issuing of a Building Permit: fees are doubled.
A. 
Residential construction.
(1) 
All new construction: will be $0.60 per square foot.
(a) 
Porches, decks, fireplaces, garages and manufactured homes shall be included in the square footage.
(b) 
Renewal fee will be doubled of the initial fee.
(2) 
Additions/alterations:
(a) 
Up to 100 square feet: $60.
(b) 
Any square footage over 100 sq. ft. will be $0.60 per sq. ft.
(c) 
Renewal fee will be double of the initial fee.
(3) 
Detached accessory building:
(a) 
Below 140 sq. feet no fee.
(b) 
Any square footage over 140 sq. ft. will be $0.45 per sq. ft.
(c) 
Renewal fee will be double of the initial fee.
(4) 
Multiple dwelling:
(a) 
Fees for each unit calculated as a single-family unit.
(b) 
Alteration of $20,000 or greater cost for residential or commercial fee: $300.
(5) 
Miscellaneous:
Initial
Renewal
Inground Swimming Pool
$100
$50
Fireplaces, Chimneys, Wood Burning Stoves
$50
$25
Signs
$35
$15
Ponds up to 2 acres
$100
$50
Decks
$0.20 per square foot
B. 
Commercial construction.
(1) 
Commercial site plan: $250 Public Hearing Fee and remaining charges paid by applicant.
Square Feet
Fee
Additional Fee
(per sq. ft.)
0 to 5,000
$200
$0.30
5,001 to 10,000
$300
$0.30
10,001 to 20,000
$400
$0.30
20,001 and up
$500
$0.30
(2) 
Plus 3% of construction cost for conservation fund.
(3) 
Storage tanks up to 1,500 gallons: $150.
(4) 
Storage tanks 1,500 gallons and over: $250.
(5) 
Commercial SWIP (sustainable water infrastructure program): charges paid by applicant.
(6) 
All SEQR fees will be paid by applicant.
(7) 
Zoning Board application fee: $600.
C. 
Agricultural construction:
New Build Construction/Additions
Initial Fee
Renewal
Below 1,000 square feet
$100
$25
Over 1,001 square feet
$250
$35
Silos, Bunkers, Grain Bins
$25
$25
D. 
Telecommunication towers:
(1) 
Up to 200 feet with antenna: $25 per linear foot, measured from grade to upper-most part.
(2) 
Over 201 feet: $45 lineal foot over 200 feet.
(3) 
Flat fee of $1,200 for co-location on a telecommunication tower.
E. 
Special use permit:
(1) 
Cell tower: $550.
(2) 
Essential services (excluding power plant): No fee.
(3) 
Private airstrips: $500.
(4) 
Camping grounds: $500.
(5) 
Not for profit, public and semi-public uses and building, excluding gun clubs: No fee.
(6) 
Kennels: $150.
(7) 
Permit renewal fee for dog kennel: $25.
(8) 
Commercial recreation uses, excluding firing ranges and amusement arcades and golf courses: $500.
(9) 
Gun clubs and firing ranges: See Local Law (1976).
(10) 
Amusement arcades: $500.
(11) 
Rooming houses: $500.
(12) 
Bed and breakfast establishment: $500.
(13) 
Motor vehicle service station and public garages: $525.
(14) 
Permit renewal required: No fee.
(15) 
Multiple housing developments: $1,000.
(16) 
Buildings requiring special use permits: $250.
(17) 
Personal solar: $100 (No Renewal Fee).
F. 
Commercial solar:
(1) 
Flat fee: $1,000 plus $1,000 per megawatt (prorated).
(2) 
Commercial solar renewal fee (annually): $500.
(3) 
All other special use permits not listed: $200.
G. 
Fees for subdivision application and review shall be as follows:
(1) 
Sketch plat review fee: $15 per lot.
(2) 
Preliminary plan review.
(a) 
Review: $20 per lot.
(b) 
Public hearing: $300 per hearing.
(c) 
SEQR: Paid by applicant.
(d) 
Reapplication fee: $300.
(3) 
Final plat review fee:
(a) 
Review: $20 per lot.
(b) 
Public hearing: $300 per hearing.
(c) 
Reapplication fee: $300.
(4) 
Payment in lieu of open space (if permitted) is $300 per lot.
(5) 
All projects involving the Town Engineering Firm: cost paid by applicant.
H. 
Rezone applications: $300.
(1) 
Public hearing fee plus all additional fees paid by applicant.
[Adopted 4-1-1991; 2-25-2020]
A. 
Real property owned by a not-for-profit corporation or association organized or conducted exclusively for religious, charitable, hospital, educational or moral or mental improvement of men, women or children purposes, or for two or more such purposes, and used exclusively for carrying out thereupon one or more of such purposes by the owning corporation or association shall be exempt from the provisions of Chapter 700, Zoning, requiring the imposition of a fee for the issuance of a building permit.
B. 
Real property owned by an incorporated volunteer fire company or fire department created for the purpose of furnishing fire protection which is actually and exclusively used and occupied by such fire company or fire department for public purposes shall be exempt from the provisions of Chapter 210, Zoning, requiring the imposition of a fee for the issuance of a building permit. As used in this section, the term "public purposes" shall mean land and buildings or portions thereof used for housing, storage, repair and testing of fire department vehicles and of equipment, appliances, devices, tools, protective clothing, uniforms and supplies; receipt and dispatch of alarms; training, drills and instruction; generators, lockers, showers, custodial quarters; offices, company meetings, ready room; social and recreational use, other than for income-producing or business purposes of both the firemen and residents of the Town or fire district in which the real property is located.
C. 
The cost of building permits for other commercial buildings will remain the same.
[Adopted 3-11-1999 by L.L. No. 2-1999; 12-14-2006 by L.L. No. 2-2006; 2-25-2020]
A. 
Initial fee. The initial fee for a manufactured home park established within the Town of Marilla shall be as set from time to time by resolution of the Town Board for the first 20 manufactured home spaces and for each additional manufactured home space in excess of 20 spaces.
B. 
License renewal fee.
(1) 
The fee for renewal of licenses for manufactured home parks maintaining not more than 20 manufactured home spaces shall be as set from time to time by resolution of the Town Board.
(2) 
The fee for renewal of licenses for manufactured home parks maintaining more than 20 manufactured home spaces shall be as set from time to time by resolution of the Town Board for the first 20 manufactured home spaces and for each additional manufactured home space in excess of 20 spaces; provided, however, that an amount as set from time to time by resolution of the Town Board shall be paid for any additional manufactured home space not previously licensed.
C. 
Amendment by resolution. The fees set forth in this section may be amended by the Town Board by resolution from time to time.