A.
All subdivision and/or resubdivision of land within the Township, as defined in § 120-5 of this chapter, shall be reviewed by the Land Use Board in accordance with the provisions of this chapter.
B.
Except as otherwise provided, no zoning or construction permit shall be issued for any building or use or any enlargement or alteration of any building or use unless a site plan for said building or use is first submitted to and approved by the Land Use Board of the Township, and no certificate of occupancy shall be given or remain valid unless all construction and site utilization conforms to an approved site plan. This requirement shall pertain to all uses and structures in all zoning districts, except that:
(1)
Site plans shall not be required for any single-family dwelling; for permitted accessory uses to a single-family dwelling such as a private garage or swimming pool, but excluding home occupations; a farm or any permitted accessory use thereto such as barn, silo, storage shed or related structure.
(2)
Site plan review and approval will not be required in connection with the alteration and repair of an existing structure or use, when the Zoning Officer determines that the alteration or repair: